TIDMSCIR

RNS Number : 9622E

Scirocco Energy PLC

01 November 2022

1 November 2022

Scirocco Energy plc

("Scirocco Energy" or "the Company")

Ruvuma Operations Update

Scirocco (AIM: SCIR) notes the below operations update issued this morning by Aminex PLC regarding the Ruvuma asset, in which Scirocco awaits completion of the divestment of its 25% interest to APT. The full text of the Aminex PLC announcement is copied out below:

Aminex has been informed of a delay to the spud date of the forthcoming Chikumbi-1 ("CH-1") well by the operator, ARA Petroleum Tanzania Limited ("APT"). Due to ongoing negotiations with the Tanzanian authorities and contractors, Aminex has been advised that the expected spud date for CH-1 has now slipped to March 2023 due to rig availability. The Company is however pleased to provide the market with an update on current operational activities:

-- APT and the Tanzania Petroleum Development Corporation ("TPDC") are in advanced negotiations to accelerate gas production from the Ntorya gasfield. The proposal, following the successful drilling of CH-1, is to utilise the newly drilled well and the existing suspended gas producers, Ntorya-1 ("NT-1") and Ntorya-2 ("NT-2"). This is expected to lead to gas production and receipt of production revenues in early 2024, almost 12 months earlier than originally envisaged.

-- The acceleration of production through the initial three wells is strongly supported by the Tanzanian authorities and is based on the following:

o Commitment by the TPDC to construct a 30 km pipeline as soon as possible to tie the Ntorya gasfield into the existing Madimba processing and pumping station.

o The incorporation of three producing wells - CH-1, NT-2 and NT-1, the latter of which will be worked-over after the drilling of CH-1 to repair a minor leak in the casing string.

o The three wells are expected to produce at least 60 mmscfd in aggregate.

o The estimated gross capital budget for 2023, which has been approved by the joint venture partners, is US$30.8 million, includes the processing and interpretation of the 3D seismic data, drilling and testing of CH-1, re-entry and work-over of NT-1, together with the purchase of the necessary manifold, flowlines, fiscal meters and hook-up system to facilitate early production.

o Early production success, from the initial three well development, will see the drilling of up to five additional development wells taking the expected field gas production to rates in excess of 140 mmscfd, as previously reported.

   --      Negotiations continue regarding the finalisation of gas terms and gas pricing. 

-- The Ruvuma 3D seismic acquisition programme, the largest 3D survey to have been conducted to date in onshore East Africa, completed on 9 October 2022 and the processing and interpretation of data will continue into 2023.

Aminex, with a 25% non-operated interest, is carried throughout the ongoing work programme to a maximum gross capital expenditure of $140 million ($35 million net to Aminex). The carry will see the Company through to the commencement of commercial gas production from the Ntorya gasfield, now scheduled for early 2024, and to increased production from full field development at zero cost to the Company, which envisages the drilling of up to five additional wells in 2024. APT's revised mapping and internal management estimates currently suggest a risked prospective gas in place ("GIIP") of 3,024 Bcf

(gross basis, mean case) within multiple reservoir sand lobes and a prospective risked recoverable gas resource of 1,990 Bcf (gross basis, mean case), which will be confirmed in due course by the recently acquired 3D seismic data.

Charles Santos, Executive Chairman of Aminex commented:

"Whilst I am disappointed to announce a delay in the spudding of the important CH-1 well, the acceleration of production is a game changer for all stakeholders in the Ruvuma development and will halve the time to gas production from Ntorya and receipt of revenues to the Company. The advanced negotiations on fast-tracking production reflects a strong desire of the Tanzanian authorities to bring additional gas to the market as soon as possible and the steadfast commitment of the Operator to move this project forward at an enhanced pace for the benefit of all parties involved. We would like to thank APT and the Tanzanian authorities for their cumulative efforts in continuing to progress the project."

Commenting on the update, Scirocco's CEO Tom Reynolds said:

"The update discloses a delay to the drilling of CH-1 well, which will be a disappointment to the forward JV, however also positive updates regarding the acceleration of production which bodes well for the contingent elements of Scirocco's $16m divestment."

The information contained within this announcement is considered to be inside information prior to its release, as defined in Article 7 of the Market Abuse Regulation No. 596/2014, and is disclosed in accordance with the Company's obligations under Article 17 of those Regulations .

For further information:

 
 Scirocco Energy plc 
  Tom Reynolds, CEO                                   +44 (0) 20 7466 
  Doug Rycroft, COO                                    5000 
 
   Strand Hanson Limited, Nominated Adviser             +44 (0) 20 7409 
   Ritchie Balmer / James Spinney / Robert Collins      3494 
 
   WH Ireland Limited, Broker                           +44 (0) 0207 
   Harry Ansell / Katy Mitchell                         220 1666 
 
   Buchanan, Financial PR                               +44 (0) 20 7466 
   Ben Romney / Jon Krinks                              5000 
 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

UPDFSIFLFEESEIF

(END) Dow Jones Newswires

November 01, 2022 10:58 ET (14:58 GMT)

Scirocco Energy (LSE:SCIR)
Gráfica de Acción Histórica
De Mar 2024 a Abr 2024 Haga Click aquí para más Gráficas Scirocco Energy.
Scirocco Energy (LSE:SCIR)
Gráfica de Acción Histórica
De Abr 2023 a Abr 2024 Haga Click aquí para más Gráficas Scirocco Energy.