Condor Gold Plc (“Condor” or the “Company”) Results of Annual General Meeting (“AGM”)
12 Mayo 2022 - 11:56AM
Condor (AIM: CNR; TSX: COG) is pleased to announce that at the
Company’s AGM held earlier today, all resolutions were passed.
For further information please visit www.condorgold.com or
contact:
Condor Gold plc |
Mark Child, Chairman and CEO+44
(0) 20 7493 2784 |
|
|
|
|
Beaumont Cornish Limited |
Roland Cornish and James
Biddle+44 (0) 20 7628 3396 |
|
|
|
|
SP Angel Corporate Finance
LLP |
Ewan Leggat +44 (0) 20 3470
0470 |
|
|
|
|
Blytheweigh |
Tim Blythe and Megan Ray+44 (0)
20 7138 3204 |
|
About Condor Gold plc:
Condor Gold plc was admitted to AIM in May 2006
and dual listed on the TSX in January 2018. The Company is a gold
exploration and development company with a focus on Nicaragua.
On 25 October 2021 Condor announced the filing
of a Preliminary Economic Assessment Technical Report (“PEA”) for
its La India Project, Nicaragua on SEDAR https://www.sedar.com. The
highlight of the technical study is a post-tax, post upfront
capital expenditure NPV of US$418 million, with an IRR of 54% and
12 month pay-back period, assuming a US$1,700 per oz gold price,
with average annual production of 150,000 oz gold per annum for the
initial 9 years of gold production. The open pit mine schedules
have been optimised from designed pits, bringing higher grade gold
forward resulting in average annual production of 157,000 oz gold
in the first 2 years from open pit material and underground mining
funded out of cashflow.
In August 2018, the Company announced that the
Ministry of the Environment in Nicaragua had granted the
Environmental Permit (“EP”) for the development, construction and
operation of a processing plant with capacity to process up to
2,800 tonnes per day at its wholly-owned La India gold Project (“La
India Project”). The EP is considered the master permit for mining
operations in Nicaragua. Condor has purchased a new SAG Mill, which
has mainly arrived in Nicaragua. Site clearance and preparation is
at an advanced stage.
Environmental Permits were granted in April and
May 2020 for the Mestiza and America open pits respectively, both
located close to La India. The Mestiza open pit hosts 92 Kt at a
grade of 12.1 g/t gold (36,000 oz contained gold) in the Indicated
Mineral Resource category and 341 Kt at a grade of 7.7 g/t gold
(85,000 oz contained gold) in the Inferred Mineral Resource
category. The America open pit hosts 114 Kt at a grade of 8.1 g/t
gold (30,000 oz) in the Indicated Mineral Resource category and 677
Kt at a grade of 3.1 g/t gold (67,000 oz) in the Inferred Mineral
Resource category. Following the permitting of the Mestiza and
America open pits, together with the La India Open Pit Condor has
1.12 M oz gold open pit Mineral Resources permitted for
extraction.
Disclaimer
Neither the contents of the Company's website
nor the contents of any website accessible from hyperlinks on the
Company's website (or any other website) is incorporated into, or
forms part of, this announcement.
Qualified Persons
The technical and scientific information in this
press release has been reviewed, verified and approved by Andrew
Cheatle, P.Geo., who is a “qualified person” as defined by NI
43-101 and Gerald D. Crawford, P.E., who is a “qualified person” as
defined by NI 43-101 and is the Chief Technical Officer of Condor
Gold plc.
Technical Information
Certain disclosure contained in this news
release of a scientific or technical nature has been summarised or
extracted from the technical report entitled “Technical Report on
the La India Gold Project, Nicaragua, October 2021”, dated October
22, 2021 with an effective date of September 9, 2021 (the
“Technical Report”), prepared in accordance with NI 43-101. The
Qualified Persons responsible for the Technical Report are Dr Tim
Lucks of SRK Consulting (UK) Limited, and Mr Fernando Rodrigues, Mr
Stephen Taylor and Mr Ben Parsons of SRK Consulting (U.S.) Inc. Mr
Parsons assumes responsibility for the MRE, Mr Rodrigues the open
pit mining aspects, Mr Taylor the underground mining aspects and Dr
Lucks for the oversight of the remaining technical disciplines and
compilation of the report.
Forward Looking Statements
All statements in this press release, other than
statements of historical fact, are ‘forward-looking information’
with respect to the Company within the meaning of applicable
securities laws, including statements with respect to: Developmment
Plans for the La India Project, Mineral Reserves and Resources at
La India Project. Forward-looking information is often, but not
always, identified by the use of words such as: "seek",
"anticipate", "plan", "continue", “strategies”, “estimate”,
"expect", "project", "predict", "potential", "targeting",
"intends", "believe", "potential", “could”, “might”, “will” and
similar expressions. Forward-looking information is not a guarantee
of future performance and is based upon a number of estimates and
assumptions of management at the date the statements are made
including, among others, assumptions regarding: future commodity
prices and royalty regimes; availability of skilled labour; timing
and amount of capital expenditures; future currency exchange and
interest rates; the impact of increasing competition; general
conditions in economic and financial markets; availability of
drilling and related equipment; effects of regulation by
governmental agencies; the receipt of required permits; royalty
rates; future tax rates; future operating costs; availability of
future sources of funding; ability to obtain financing and
assumptions underlying estimates related to adjusted funds from
operations. Many assumptions are based on factors and events that
are not within the control of the Company and there is no assurance
they will prove to be correct.
Such forward-looking information involves known
and unknown risks, which may cause the actual results to be
materially different from any future results expressed or implied
by such forward-looking information, including, risks related to:
mineral exploration, development and operating risks; estimation of
mineralisation, resources and reserves; environmental, health and
safety regulations of the resource industry; competitive
conditions; operational risks; liquidity and financing risks;
funding risk; exploration costs; uninsurable risks; conflicts of
interest; risks of operating in Nicaragua; government policy
changes; ownership risks; permitting and licencing risks; artisanal
miners and community relations; difficulty in enforcement of
judgments; market conditions; stress in the global economy; current
global financial condition; exchange rate and currency risks;
commodity prices; reliance on key personnel; dilution risk; payment
of dividends; as well as those factors discussed under the heading
“Risk Factors” in the Company’s annual information form for the
fiscal year ended December 31, 2020 dated March 31, 2021, available
under the Company’s SEDAR profile at www.sedar.com.
Although the Company has attempted to identify
important factors that could cause actual actions, events or
results to differ materially from those described in
forward-looking information, there may be other factors that cause
actions, events or results not to be as anticipated, estimated or
intended. There can be no assurance that such information will
prove to be accurate as actual results and future events could
differ materially from those anticipated in such statements. The
Company disclaims any intention or obligation to update or revise
any forward-looking information, whether as a result of new
information, future events or otherwise unless required by law.
Condor Gold (TSX:COG)
Gráfica de Acción Histórica
De Nov 2024 a Dic 2024
Condor Gold (TSX:COG)
Gráfica de Acción Histórica
De Dic 2023 a Dic 2024