Europa Metals, the European focused lead, zinc and silver developer, is pleased to announce the results of an updated independent Mineral Resource Estimate, reported in accordance with JORC (2012), in respect of its wholly owned Toral lead-zinc-silver project located in northern Spain ("Toral" or the "Toral Project").

Highlights :

-- Updated independent Indicated and Inferred Mineral Resource Estimate for Toral, reported in accordance with JORC (2012). The input database for the estimate, included:

o 172 diamond drill holes (including wedges) and 4 reverse circulation (RC) drill holes totalling 59,658.73 metres of drilling (including environmental drillholes), and 19 underground channels for 18.75 metres.

o 8 new parent mineral exploration drill holes TOD-028 to TOD-035 and six new daughter drill holes (metallurgical/geotechnical data), and one failed daughter hole.

o Application of updated fault models.

o Application of new lithological facies domain models.

-- Indicated resource estimate of approximately 5.9Mt @ 7.1% Zn Equivalent (including Pb credits) and 27g/t Ag, representing an approximate:

o 55% increase in Indicated resource tonnes;

o 39 % increase in Indicated contained tonnes of zinc to approximately 251,000 tonnes;

o 30% increase in Indicated contained tonnes of lead to approximately 196,000 tonnes; and

o 40% increase in Indicated contained ounces of silver to approximately 5.2 million ounces.

-- A total resource of approximately 20Mt @ 6.3% Zn Equivalent (including Pb credits), 3.9% Zn, 2.7% Pb and 22 g/t Ag, including:

o 790,000 tonnes of zinc, 550,000 tonnes of lead and 14 million ounces of silver.

Outlook

The Company expects to integrate the updated resource estimate, with the substantially increased indicated resource and grade increase within the upper zones, with its ongoing engineering analysis in order to assess the positive influence on the proposed future mining and processing route for the Toral project.

The Company will also utilise the bulk sample obtained during the recent drill programme to undertake a new phase of metallurgical and waste testing via Wardell Armstrong International. It is intended that ore sorting analysis will be conducted on the large bulk sample within the upper zones to complement its 2020 work. In addition, further ore sorting testwork will be utilised to determine the potential recovery and concentrate production levels from the lower, carbonate zones.

Laurence Read, CEO of Europa Metals, commented :

"With an approximate 55% increase in the Indicated category to 5.9Mt @ 7.1% Zinc Equivalent (including Pb credits), sitting within a total resource, open at depth and to the East, of 20Mt @ 6.3% Zinc Equivalent (including Pb credits), this independent resource update represents a significant advance for the Toral lead, zinc and silver project.

"By formulating and implementing a highly targeted drilling campaign, our team has achieved this significant result in a highly efficient manner, in an area of the resource that should directly impact the early future production years of the Toral project. We are now progressing to a new phase of metallurgical testing in order to determine the most efficient production routes for the upper zone including examination of ore sorting. The overall focus continues to be on proving up our well established lead, zinc and silver resource area and continuing to de-risk the development profile."

Myles Campion, Executive Chairman of Europa Metals, further commented :

"This is an excellent result for Europa Metals with the upper siliceous zone returning better than expected grades and widths which has enabled the reporting of a substantial increase in Indicated tonnes from a concentrated drilling programme. The deposit continues to deliver positive news and this boost to the Indicated resource provides further certainty on tonnes and grade profiles to assist with the assessment of mine life and future production profile in further studies."

Overview

Europa Metals is pleased to announce the results of an independent updated Mineral Resource Estimate, in accordance with JORC (2012), for Toral pursuant to which there has been an approximate 55% increase in the Indicated resource category to approximately 5.9Mt at 7.1% Zinc Equivalent (including Pb credits) and 27g/t Ag. The upgrade follows the analysis of assays returned from the Company's 2021 diamond drilling campaign (involving, inter alia, key new drill holes TOD-028 and TOD-035) and incorporation of updated fault and new lithological facies domain models. The update was commissioned from and prepared by Addison Mining Services Limited ("AMS").

Figure 1 showing AMS' resource block model for Toral as a 3D view looking north, by Zn Equivalent (PbAg)% grade: http://www.rns-pdf.londonstockexchange.com/rns/6336N_1-2021-9-30.pdf

Figure 2a: showing AMS' resource block model for Toral as a 3D view looking north, by resource category: http://www.rns-pdf.londonstockexchange.com/rns/6336N_1-2021-9-30.pdf

Figure 2b: AMS' resource block model for Toral 2D showing increase in indicated area: http://www.rns-pdf.londonstockexchange.com/rns/6336N_1-2021-9-30.pdf

This latest updated Mineral Resource Estimate, effective as of 14 September 2021 for the Toral deposit comprises:

-- An Indicated resource of approximately 5.9Mt @ 7.1% Zn Equivalent (including Pb credits), 4.2% Zn, 3.3% Pb and 27g/t Ag, including:

o 251,000 tonnes of zinc, 196,000 tonnes of lead and 5.2 million ounces of silver.

-- An Inferred resource of approximately 14Mt @ 6% Zn Equivalent (including Pb credits), 3.8% Zn, 2.5% Pb and 20 g/t Ag, including:

o 540,000 tonnes of zinc, 350,000 tonnes of lead and 9 million ounces of silver.

-- A total resource of approximately 20Mt @ 6.3% Zn Equivalent (including Pb credits), 3.9% Zn, 2.7% Pb and 22 g/t Ag, including:

o 790,000 tonnes of zinc, 550,000 tonnes of lead and 14 million ounces of silver.

The Company's Board believes the results of this update compare very favourably with the previously reported Mineral Resource Estimate, announced on 14 August 2020 and effective as of 12 August 2020, which comprised the following tonnages and grade:

-- An Indicated resource of approximately 3.8Mt @ 8.3% Zn Equivalent (including Pb credits), 4.7% Zn, 3.9% Pb and 30g/t Ag, including:

o 180,000 tonnes of zinc, 150,000 tonnes of lead and 3.7 million ounces of silver.

-- An Inferred resource of approximately 14Mt @ 6.5% Zn Equivalent (including Pb credits), 4% Zn, 2.7% Pb and 23 g/t Ag, including:

o 540,000 tonnes of zinc, 360,000 tonnes of lead and 10 million ounces of silver.

-- A total resource of approximately 17Mt @ 6.9% Zn Equivalent (including Pb credits), 4.1% Zn, 2.9% Pb and 24 g/t Ag, including:

o 720,000 tonnes of zinc, 510,000 tonnes of lead and 14 million ounces of silver.

* Zn Eq (PbAg)% is the calculated Zn equivalent incorporating silver credits as well as lead and is the parameter used to define the cut-off grade used for reporting resources (Zn Eq (PbAg)% = Zn + Pb*0.867 + Ag*0.027). Zn Equivalent calculations were based on 3-year trailing average price statistics obtained from the London Metal Exchange and London Bullion Market Association giving an average Zn price of US$2,516/t, Pb price of US$1,961/t and Ag price of US$19.4/oz. Recovery and selling factors were incorporated into the calculation of Zn Eq values. It is the Company's opinion that all the elements included in the metal equivalents calculation (zinc, lead and silver) have a reasonable potential to be recovered and sold.

Implications of the resource update and updated resource model for the Toral Project

The significant increase in size and contained metal of the Indicated resource exceeded management's expectations and forms a significant cornerstone from which to further de-risk and optimise the future production profile and economics of the Toral project. By utilising the updated resource model in addition to the new geotechnical and metallurgical data recovered from the 2021 drill campaign, the Company can now analyse how the early years production design might best be developed, in particular complementing the 2020 ore sorting work conducted on the lower, carbonate zones, to determine how ore sorting in the upper zone could increase production efficiencies. Given the levels of grade now established in the upper zone and the physical location of the mineralisation, further work on the decline design can also be advanced.

At this time, no copper has been brought into the resource as only limited intersections have occurred. Equally, the resource expansion is predominantly occurring within the upper boundaries of the pre-existing resource with no further exploration yet being made below the resource cut-off at the base or to the East.

Revised inputs

The geological team at Europa Metals has completed several important workstreams and internal projects over the last five years to improve our geological understanding of the Toral deposit.

The 2018 re-logging exercise of the historic Peñarroya core at the Instituto Geolo gico y Minero de Espan a (IGME) facilities, proved to be beneficial as it assisted in increasing the Company's understanding of the geological environment and controls on mineralisation. In addition, it provided basic structural data and, importantly, increased the quantity and quality of bulk density measurements.

The completion of detailed surface geological mapping in 2019 led to the 2020 updated structural database to provide further data and guidance on structural influences within the confines of the Toral deposit.

The findings from such work have been incorporated into the updated resource model, thereby providing better delineated geological boundaries, and utilised for updating the structural framework which has been integral in establishing the updated resource model.

Europa Metals completed eight parent diamond drill holes (TOD-028 to TOD-035) and seven daughter wedge holes in the last drilling campaign for total drilling of 5,183.90 metres (including failed hole TOD-035F). The objective of the 2021 drill campaign was to test up dip extensions to the high-grade zone and increase the Indicated resource, within predominantly siliceous lithofacies material for ore sorting and metallurgical tests. All drilling was planned to cut the deposit above elevation 190mRl (approximately 300 to 500 metres below surface) to extend the Indicated resource zone above that delineated in the 2020 mineral resource estimate.

Competent Person's Updated Inferred and Indicated Mineral Resource Estimate, Reported in Accordance with the JORC Code (2012 edition)

Further to the diamond drilling conducted in 2021, the Company commissioned AMS to complete an independent updated Mineral Resource Estimate. The updated Mineral Resource Estimate is based on all the available historical data from six drilling campaigns conducted on licence number 15.199 (namely, the 1972 - 1984 Peñarroya-Adaro campaign, the 2006 - 2008 Lundin Mining campaign, the 2016 - 2017 Europa Metals' campaign and the Company's September 2018 to August 2019 RC and diamond drilling, November 2019 to January 2020 diamond drilling and January to June 2021 diamond drilling), along with historic underground channel sampling results from numerous old adits.

The updated Mineral Resource Estimate has been reported in accordance with the Joint Ore Reserve Committee (JORC) code, 2012 edition.

Block Model

The resource update has identified potentially economic mineralisation ranging from surface to approximately 1,100m below surface. The new block model currently extends for a strike length of 3,600m and is still open to the east and west along strike and also at depth where it has not yet been closed off.

Figure 3: AMS' East West 2D Toral block model by grade:

http://www.rns-pdf.londonstockexchange.com/rns/6336N_1-2021-9-30.pdf

The Inferred and Indicated resource for the Zn-Pb-Ag mineralisation located on the Toral Project's licence area has been estimated at various cut-offs (refer to Table 1 below). The Company reviewed the new block model along with its appointed geological consultants, AMS, and concluded that a 4% Zn Equivalent cut-off grade was appropriate utilising estimated mining parameters established during the 2020 scoping study and mineralogy and using an historical three-year trailing average for metals prices, which, although conservative, was deemed appropriate at this stage in the project's development.

   Zn Price Used:            US$ 2,516/t     US$ 1.14/lb 
   Pb Price Used:            US$ 1,961/t     US$ 0.90/lb 
   Ag Price Used:                                    US$ 19.4/oz 

Table 1: Summary of mineral resources for the Toral property reported at a 4.0% Zn equivalent cut-off grade (including Pb and Ag credits) and estimated grade and tonnages at the various cut-off grades. Figures are rounded to reflect the accuracy of the estimations.

 
  Cut-Off      Tonnes     Density     Zn Eq        Zn Eq     Zn %   Pb %   Ag g/t   Contained   Contained   Ag Troy Oz 
   Zn Eq     (Millions)               (Pb)%       (PbAg)%                           Zn Tonnes   Pb Tonnes   (Millions) 
  (PbAg)%                                                                            (000s)      (000s) 
                                                             Indicated 
            ---------------------------------------------------------------------------------------------------------- 
    6.0         3.9        2.93        8.5          9.3      5.1    3.9      30        200         152         3.8 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
    5.0         4.8        2.92        7.8          8.6      4.7    3.6      29        226         173         4.4 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
    4.0         5.9        2.90        7.1          7.8      4.2    3.3      27        251         196         5.2 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
    3.5         6.2        2.90        7.0          7.7      4.1    3.3      27        255         200         5.3 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
                                                             Inferred 
            ---------------------------------------------------------------------------------------------------------- 
    6.0          8         2.90        7.3          7.9      4.9    2.8      22        370         210         5.4 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
    5.0          10        2.90        6.7          7.2      4.4    2.7      21        450         280         7.0 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
    4.0          14        2.90        6.0          6.5      3.8    2.5      20        540         350         9.0 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
    3.5          16        2.90        5.6          6.2      3.6    2.4      19        580         390         10.0 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
                                                               Total 
            ---------------------------------------------------------------------------------------------------------- 
    6.0          12        2.90        7.7          8.4      4.9    3.2      25        570         370          9 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
    5.0          15        2.90        7.0          7.7      4.5    3.0      23        680         450          11 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
    4.0          20        2.90        6.3          6.9      3.9    2.7      22        790         550          14 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
    3.5          22        2.90        6.0          6.6      3.7    2.6      21        830         590          15 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
                                                   Partially Weathered Material 
            ---------------------------------------------------------------------------------------------------------- 
    6.0          12        2.90        7.7          8.4      4.9    3.2      25        570         370          9 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
                                                      Unweathered Fresh Rock 
            ---------------------------------------------------------------------------------------------------------- 
    4.0          16        2.90        6.7          7.2      4.3    2.7      21        710         440          11 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
 

Notes:

1. No mineral reserve calculations have been undertaken. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

2. Numbers are rounded to reflect the fact that an Estimate of Resources is being reported. Rounding of numbers may result in differences in calculated totals and averages. All tonnes are metric tonnes.

3. Zn equivalent calculations were based on 3 year trailing average price statistics obtained from the London Metal Exchange and London Bullion Market Association giving an average Zn price of US$2,516/t, Pb price of US$1,961/t and Ag price of US$19.4/oz. Recovery and selling factors were incorporated into the calculation of Zn Eq values. It is the Company's opinion that all the elements included in the metal equivalents calculation (zinc, lead and silver) have a reasonable potential to be recovered and sold.

4. Zn Eq (PbAg)% is the calculated Zn equivalent incorporating silver credits as well as lead and is the parameter used to define the cut-off grade used for reporting resources (Zn Eq (PbAg)% = Zn + Pb*0.867 + Ag*0.027).

5. Zn Eq is the calculated Zn equivalent using lead credits and does not include silver credits (Zn Eq = Zn + Pb*0.867).

6. The Mineral Resource Estimate set out above for the zinc, lead and silver mineralisation in the Toral project area is based on a 3D geologic model and wireframe restricted block model that integrated the exploration work on the Toral project up to 14 September 2021. The block model used uniform cell size of 25x10x25m to best suit the orientation of the mineralisation and sample spacing. The block model was rotated by 20deg in plan view to best match the trend of mineralisation. Sub cells were applied to better fit the wireframe solid models and preserve accurate volume as much as possible. Cells were interpolated at the parent block scale using a Median Indicator Kriging.

   7.   No Top Cuts were applied to the 2m downhole composite data used for grade estimation. 

8. The Indicated and Inferred mineral resource category for the Toral lead-zinc-silver project set out in the table above (at cut-off grades >4% Zn Equivalent) comply with the resource definitions as described in the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The JORC Code, 2012 Edition. Prepared by: The Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia (JORC).

9. The tonnes and grades reported at a cut-off grade of 3.5% Zn equivalent are below the economic cut-off grade of 4% and as such should not be considered mineral resources, they are shown here for comparison purposes only.

Summary of Updated Resource Estimate and Reporting Criteria

In accordance with JORC (2012) reporting guidelines, a summary of the material information used to estimate the updated Mineral Resource Estimate is set out below (for further detail please refer to the JORC (2012) Table 1, set out in the Appendix to this announcement).

Geology and geological interpretation

The Toral Project is a traditional polymetallic (lead-zinc-silver) deposit, which is hosted over 6km of strike length of the prospective Lower Cambrian Vegadeo Limestone formation, that is regionally mineralised along more than 40km of its extent. The deposit represents a carbonate hosted, structurally controlled deposit type, demonstrating fault-controlled contact, vein, carbonate replacement and breccia styles of mineralisation situated close to and along the boundary between footwall slates and hanging wall limestones and dolomites. Sub-ordinate lead-zinc-silver mineralisation also occurs wholly within the hanging wall limestones and dolomites, approaching the contact with the slates.

Historic drill hole re-logging undertaken in 2018 provided improved geological, structure, alteration and weathering/oxidation information, incorporated into the interpreted geological and mineralised models for the updated resource estimate. Surface mapping and remote data interpretation by Europa Metals has enabled the development of an interpreted fault model, also incorporated into the updated geological and mineralised models used in the updated mineral resource estimate.

Weathering

The weathering profile was observed throughout the drill holes and historic shallowly emplaced horizontal adits. In general, observations on weathering and oxidation at Toral suggests a poorly developed or truncated profile overall, with minimal oxidation developed much below 30 metres from the surface, with the majority of the country rock being un-weathered or showing only fractured controlled weathering and oxidation in the form of iron oxide joint tarnishing and fracture infill. Weathering and oxidation are deeper within the main parts of the mineralised structure, and is interpreted as partial, being fracture controlled with less than 10% weatherable minerals weathered and/or oxidised. A weathering surface was interpreted at the moderately weathered - partially weathered and fracture-controlled boundary to sub-divide the moderately oxidised 'transitional' zone material and 10% weathered 'fresh' material below.

Due to the strong lithological and structure control, an observed trough is developed at the transitional-fresh boundary along the main structure, interpreted through the drill hole logging of weathering. The accuracy of the surface at this stage is suitable for application and use in the reporting of Inferred and Indicated resources and further work is required to increase the understanding of the boundary and its effects on the deposit.

Bulk density

The resource database contains 3,012 bulk density measurements, with a total of 234 within the mineralised wireframe, with a mean value of 2.84 g/cm(3) .

A broad linear relationship between Pb+Zn grade and Bulk Density was identified from scattergrams and the formula 2.7 + 0.02(Pb+Zn%) used to estimate block density in relation to block grade within the block model, density was capped at 3.5 g/cm(3) .

Drilling techniques and hole spacing

The updated Mineral Resource Estimate includes new information from eight parent diamond drill holes (TOD-028 to TOD-035) and six successful daughter wedge holes from the last drilling campaign for total drilling of 3,368 metres (including failed hole TOD-035F), all collared from surface.

A total of 172 diamond drill holes (including wedges) and 4 reverse circulation (RC) drill holes totalling 59,658.73 metres of drilling, and 19 underground channels for 18.75 metres were used as the input database for geological modelling and resource estimation. Note that this drillhole database includes environmental monitoring drillholes.

Drill core diameter was PQ, HQ, NQ2, NQ and BQ depending upon depth. Tube type is unknown for the historic Peñarroya drilling, whilst the triple tube method was used for the historic Lundin and Europa Metals' drilling campaigns.

The recent diamond core has been orientated. No orientation has been performed on the historic drill core.

Drill and UG channel sample data spacing across the current resource area ranges from approximately 50-100m x 50-100m centres within the most densely tested area situated in the NW, stepping out to approximately 200m x 200m within the mid-section and 100-200m x 500m in the SE.

The distribution of drill holes and UG channel sampling, supported by surface and underground mapping, is sufficient to establish the degree of geological and grade continuity appropriate for a JORC (2012) Inferred and Indicated classification of resources.

Sampling and sub-sampling techniques

The four main phases of historic exploration drilling and sampling are:

-- 1972-1984 Peñarroya-Adaro: diamond drill core method was used to obtain samples for geological logging and sampling. Geological and analytical data is recorded on hardcopy. Selective sampling method was employed around areas of interest. Sampling intervals measure approximately 1m, half core sent for analysis, with half core retained for reference. Exact details on core processing, sampling techniques and analytical methods are unclear, however subsequent explorers Lundin Mining sent the majority of the Peñarroya core pulp reject samples to ALS Chemex for multi element re-analysis by ICP.

-- 2006-2008 Lundin Mining: diamond drill core method was used. Core logging completed on hardcopy. Selective sampling method was employed around areas of interest. Sampling intervals measure approximately 1m, half core sent for analysis, with half core retained for reference. Samples typically 1m half core, with samples prepared at the then Lundin Laboratory in Suecia, then shipped to ALS Chemex Vancouver for multi-element analysis by ICP. Half core samples reduced to -400 microns and 100g sub-samples taken for analysis. Multi-element re-analysis of available Peñarroya diamond drill hole pulp reject samples completed at ALS Chemex Vancouver using ICP.

-- 2016-2017 Europa Metals: diamond drill core and underground cut channel sampling methods used to obtain samples for geological logging and sampling. Geological and analytical data is recorded on hardcopy. Selective sampling method was employed around areas of interest. Sampling intervals measure approximately 1m, half core sent for analysis, with half core retained for reference. Samples sent to ALS Seville for preparation and multi-element analysis by ICP. Half core samples reduced to -400 microns and 100g sub-samples taken for analysis.

-- 2018-2021 Europa Metals: diamond drill core and RC chips used to obtain samples for geological logging and sampling. Geological and analytical data is recorded on paper and later digitised. Selective sampling method was employed around areas of interest. Sampling intervals measure approximately 1m, half core and RC riffle splits sent for analysis, weighing approximately 2-3kg, with half core and chip sub-samples retained for reference. Samples were sent to ALS Seville for preparation and multi-element analysis by ICP. Half core and RC samples were reduced to -400 microns and 100g sub-samples taken for analysis.

Diamond Core Recovery

A total of 14,706 core recovery measurements exist in the database for the drilling with average core recovery of 79%. The average for the Europa Metals diamond drilling is 96%. Core recovery is measured over run lengths.

Cut-off grades

The Inferred and Indicated resource for the Pb-Zn-Ag mineralisation located on the Toral property, licence number 15.199, has been estimated at various cut-offs. For the Toral deposit resource, the economic cut-off was determined by calculation of block revenue factors based on Zn equivalent calculations derived from an historical three-year trailing average for Zn, Pb and Ag prices. Indicative mining and processing costs derived from the 2020 scoping study and typical of the region and deposit type were applied along with typical mining recovery and dilution factors and metallurgical recovery factors identified by laboratory studies and production at comparable deposits and accepted by AMS. For reporting in compliance with JORC (2012), an economic cut-off grade of 4% Zn equivalent (including Pb and Ag credits) was selected considering the aforementioned factors and allowing for some increase in commodity prices to define resources with a reasonable prospect of eventual economic extraction now or in the near future. Resources are reported as follows:

The updated mineral resource estimate as of 14 September 2021 for Toral comprises:

-- An Indicated resource of approximately 5.9Mt @ 7.1% Zn Equivalent (including Pb credits), 4.2% Zn, 3.3% Pb and 27g/t Ag, including:

o 251,000 tonnes of zinc, 196,000 tonnes of lead and 5.2 million ounces of silver.

-- An Inferred resource of approximately 14Mt @ 6% Zn Equivalent (including Pb credits), 3.8% Zn, 2.5% Pb and 20 g/t Ag, including:

o 540,000 tonnes of zinc, 350,000 tonnes of lead and 9 million ounces of silver.

-- A total resource of approximately 20Mt @ 6.3% Zn Equivalent (including Pb credits), 3.9% Zn, 2.7% Pb and 22 g/t Ag, including:

o 790,000 tonnes of zinc, 550,000 tonnes of lead and 14 million ounces of silver.

Estimation methodology

AMS verified new primary analytical data via cross reference against original laboratory certificates. The database for use as input for mineral resource modelling and estimation has also been validated and verified by AMS. Micromine 2021 3D geological modelling and estimation software was used for import, validation and QC verification assessment, 3D solid modelling, geostatistics and block model grade estimation and block model reporting. Data checks include checks for overlapping and missing intervals, drill hole trace errors, missing survey data, lithology and collars.

As with previous resource estimates completed by AMS (2017, 2018, 2019, 2020) wireframe solid models were created for each domain based on a mineralisation threshold of approximately 0.2% for Zn and Pb (approximately 0.4% Zn+Pb). Analysis of Zn and Pb grades in cross section and in scatter plots showed a strong relationship and no requirement to model Zn and Pb separately was identified. Ag showed a strong correlation with Pb and was estimated within the Zn/Pb mineralised domain.

The updated wireframes were generated using Micromine's implicit vein modelling functionality and incorporated major fault boundaries to better honour offsets in the structure and preserve thicknesses between intercepts. Interpretation of the mineralised domains was guided by geological interpretation of the deposit incorporating structural and lithological boundaries and surface expression in topographical data and outcrop mapping.

To the northwest the resource is truncated by the licence boundary and extended approximately 10m past the south easterly most drillhole which was mineralised but contained sub-economic grades (3m at 2.4% ZnEq). The total strike length of the modelled mineralisation within the licence is approximately 3.1km. The structure remains open to the southeast. Down dip the model was extrapolated approximately 50-200m below the deepest sample in the northwest and central parts of the deposit, and approximately 250-280m below the deepest sample in the southeast with consideration of depths tested along strike to the northwest. The models extent is from surface to a range of approximately 800 - 1,150m below the surface. Extents of extrapolation are considered appropriate for the level of information, deposit type, strike and depth extents tested, observed and geostatistical grade continuity and the assigned resource classification.

A uniform cell block model of 25 mE, 10 mN, 25 mZ was restricted to the wireframes using block factors. The block model was rotated by 20deg in plan view to best match the trend of mineralisation. The uniform model and 2m sample composites for the mineralised domain were then flattened to a constant vertical plane striking 110deg to account for fault offsets, improve variography and grade mapping. Thickness was preserved in the flattening process and no lateral stretching was applied.

Block model interpolation and extrapolation for Zn, Pb and Ag was completed using directional variograms for each element in the flattened space at the uniform block scale. Median Indicator Kriging was used, where each cut-off bin in the indicator interpolation process uses the same median indicator variogram for each element. Indicator bins were selected based on dices plus incremental percentiles in the tail of the distribution.

During block model interpolation, the influence of some isolated high-grade values was found to be sufficiently localised and did not have undue influence on the estimates of grade. It was decided that there was no requirement for top cutting.

Classification criteria

The portion of the Toral deposit defined by drilling, underground development and channel sampling, has been classified as an Inferred and Indicated mineral resource in accordance with JORC (2012) based on a combination of drill spacing, geological confidence, grade continuity, previous mining and the quality control standards achieved.

Mining and metallurgical methods and parameters

Based on the orientations, thickness and depths to which the ore body has been modelled, as well as the estimated grade, underground sub level open stope mining is the intended mining methodology with froth floatation for recovery.

Comparison with Previous Mineral Resource Estimate

The updated Mineral Resource Estimate compares favourably with the previously reported Indicated and Inferred Mineral Resource Estimate announced on 14 August 2020 and effective as of 12 August 2020.

 
 Previous Mineral Resource Estimate Announced in August 2020 
 

Table 2: Summary of 2020 mineral resources for the Toral property reported at a 4.0% Zn equivalent cut-off grade (including Pb and Ag credits) and estimated grade and tonnages at the various cut-off grades. Figures are rounded to reflect the accuracy of the estimations.

 
  Cut-Off      Tonnes     Density     Zn_Eq        Zn Eq     Zn %   Pb %   Ag g/t   Contained   Contained   Ag Troy Oz 
   Zn Eq     (Millions)               (Pb)%       (PbAg)%                           Zn Tonnes   Pb Tonnes   (Millions) 
  (PbAg)%                                                                            (000s)      (000s) 
                                                       Indicated 
     6          2.8         2.9        9.5         10.0      5.3    4.5      34        150         130         3.1 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
     5          3.3         2.9        8.9          9.5      5.0    4.2      32        170         140         3.4 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
     4          3.8         2.9        8.3          8.9      4.7    3.9      30        180         150         3.7 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
     3          4.1         2.9        7.9          8.5      4.4    3.7      29        180         150         3.8 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
                                                       Inferred 
     6           8          2.9        7.8          8.3      4.7    3.4      28        370         270         7.2 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
     5           10         2.9        7.2          7.7      4.4    3.0      26        450         310         8.6 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
     4           14         2.9        6.5          6.9      4.0    2.7      23        540         360          10 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
     3           17         2.9        5.9          6.3      3.7    2.4      20        610         400          11 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
                                                         Total 
     6           11         2.9        8.2          8.8      4.8    3.7      30        520         390          10 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
     5           14         2.9        7.6          8.1      4.5    3.3      27        620         450          12 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
     4           17         2.9        6.9          7.3      4.1    2.9      24        720         510          14 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
     3           21         2.9        6.3          6.7      3.8    2.7      22        790         560          15 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
                                              Transitional Oxide Material 
     4           3          2.9        5.2          5.7      2.6    2.9      27        75          83          2.5 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
                                                Unweathered Fresh Rock 
     4           14         2.9        7.2          7.7      4.5    3.0      24        650         430          11 
            -----------  --------  -----------  ----------  -----  -----  -------  ----------  ----------  ----------- 
 

Notes:

1. No mineral reserve calculations have been undertaken. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

2. Numbers are rounded to reflect the fact that an Estimate of Resources is being reported as stipulated by JORC 2012. Rounding of numbers may result in differences in calculated totals and averages. All tonnes are metric tonnes.

3. Zn equivalent calculations were based on 3 year trailing average price statistics obtained from the London Metal Exchange and London Bullion Market Association giving an average Zn price of US$2,680/t, Pb price of US$2,100/t and Ag price of US$16.2/oz. Recovery and selling factors were incorporated into the calculation of Zn Eq values. It is the Company's opinion that all the elements included in the metal equivalents calculation (zinc, lead and silver) have a reasonable potential to be recovered and sold.

4. Zn Eq (PbAg)% is the calculated Zn equivalent incorporating silver credits as well as lead and is the parameter used to define the cut-off grade used for reporting resources (Zn Eq (PbAg)% = Zn + Pb*0.926 + Ag*0.019).

5. Zn Eq is the calculated Zn equivalent using lead credits and does not include silver credits (Zn Eq = Zn + Pb*0.926).

6. The Mineral Resource Estimate set out above for the zinc, lead and silver mineralisation in the Toral project area is based on a 3D geologic model and wireframe restricted block model that integrated the exploration work on the Toral project up to 21 January 2020. The block model used uniform cell size of 25x10x25m to best suit the orientation of the mineralisation and sample spacing. The block model was rotated by 20deg in plan view to best match the trend of mineralisation. Sub cells were applied to better fit the wireframe solid models and preserve accurate volume as much as possible. Cells were interpolated at the parent block scale using an Ordinary Kriging.

7. Following statistical analysis and assessment of the updated assay composite database top cuts of 125g/t Ag were applied to the data. No top cuts were applied for Zn or Pb.

8. The Indicated and Inferred mineral resource category for the Toral zinc-lead-silver project set out in the above table (at cut-off grades >4% Zn Equivalent) comply with the resource definitions as described in the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The JORC Code, 2012 Edition. Prepared by: The Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia (JORC).

9. The tonnes and grades reported at a cut-off grade of 3% Zn equivalent are below the economic cut-off grade of 4% and as such should not be considered mineral resources, they are shown here for comparison purposes only

The updated Mineral Resource Estimate is therefore positive in terms of increased Indicated resource tonnes and contained metal.

-- Indicated resource estimate of approximately 5.9Mt @ 7.1% Zn Equivalent (including Pb credits) and 27g/t Ag, representing an approximate:

o 55% increase in Indicated resource tonnes;

o 39 % increase in Indicated contained tonnes of zinc to approximately 251,000 tonnes;

o 30% increase in Indicated contained tonnes of lead to approximately 196,000 tonnes; and

o 40% increase in Indicated contained ounces of silver to approximately 5.2 million ounces.

Competent Person's Statement

The updated Toral resource estimate was prepared by Mr J.N. Hogg, MSc. MAIG. Principal Geologist for AMS, an independent Competent Person within the meaning of the JORC (2012) code and a Competent Person under the AIM guidance note for mining and oil & gas companies. The updated resource estimate was completed by Mr R. J. Siddle, MSc, MAIG Senior Resource Geologist for AMS and Competent Person. Mr Hogg has reviewed and verified the technical information that forms the basis of, and has been used in the preparation of, the updated Mineral Resource Estimate and this announcement, including all analytical data, diamond drill hole logs, QA/QC data, density measurements, and sampling, diamond and RC drilling and analytical techniques. Mr Hogg consents to the inclusion in this announcement of the matters based on the information, in the form and context in which it appears. Mr Hogg has also reviewed and approved the technical information in his capacity as a Qualified Person under the AIM Rules for Companies.

Additionally, Mr Hogg confirms that AMS is not aware of any information or data that materially affects the information contained within the Company's previous announcements referred to herein .

   For further information on the Company, please visit   www.europametals.com   or contact: 

Europa Metals Ltd

Dan Smith, Non-Executive Director and Company Secretary (Australia)

T: +61 417 978 955

Laurence Read, CEO (UK)

T: +44 (0)20 3289 9923

Linkedin: Europa Metals ltd

Twitter: @ltdeuropa

Vox: Europametals

Strand Hanson Limited (Nominated Adviser)

Rory Murphy/Matthew Chandler

T: +44 (0)20 7409 3494

Turner Pope Investments (TPI) Limited (Broker)

Andy Thacker/James Pope

T: +44 (0)20 3657 0050

Sasfin Capital Proprietary Limited (a member of the Sasfin group)

Sharon Owens

T (direct): +27 11 809 7762

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014 as it forms part of United Kingdom domestic law by virtue of the European Union (Withdrawal) Act 2018.

Glossary of technical terms :

 
 "Ag"                   silver; 
 "g"                    grammes; 
 "g/t"                  grammes per tonne; 
 "ICP"                  inductively coupled plasma; 
 "Inferred resource"    that part of a Mineral Resource for which quantity 
                         and grade (or quality) are estimated on the basis 
                         of limited geological evidence and sampling. Geological 
                         evidence is sufficient to imply but not verify geological 
                         and grade (or quality) continuity. It is based on 
                         exploration, sampling and testing information gathered 
                         through appropriate techniques from locations such 
                         as outcrops, trenches, pits, workings and drill 
                         holes; 
 "Indicated resource"   that part of a Mineral Resource for which quantity, 
                         grade (or quality), densities, shape and physical 
                         characteristics are estimated with sufficient confidence 
                         to allow the application of Modifying Factors in 
                         sufficient detail to support mine planning and evaluation 
                         of the economic viability of the deposit. 
 "JORC"                 the Australasian Code for Reporting of Exploration 
                         Results, Mineral Resources and Ore Reserves, as 
                         published by the Joint Ore Reserves Committee of 
                         The Australasian Institute of Mining and Metallurgy, 
                         Australian Institute of Geoscientists and Minerals 
                         Council of Australia; 
 "JORC (2012)"          the 2012 edition of the JORC code; 
 "m"                    metre; 
 "Mineral Resource"     a concentration or occurrence of material of economic 
                         interest in or on the earth's crust in such form 
                         and quantity that there are reasonable and realistic 
                         prospects for eventual economic extraction. The 
                         location, quantity, grade, continuity, and other 
                         geological characteristics of a Mineral Resource 
                         are known, estimated from specific geological evidence 
                         and knowledge, or interpreted from a well-constrained 
                         and portrayed geological model; 
 "Mt"                   million tonnes; 
 "oz"                   troy ounce; 
 "Pb"                   lead; 
 "QA/QC"                quality assurance/quality control; and 
 "Zn"                   zinc. 
 

APPIX : Table 1 (JORC 2012)

Section 1 Sampling techniques and data

(Criteria in this section apply to all succeeding sections.)

 
 Criteria       JORC Code explanation                                                                  AMS Commentary 
 Sampling 
  techniques     *    Nature and quality of sampling (e.g. cut channels,             *    Historic and recent diamond drill core and 
                      random chips, or specific specialised industry                      underground cut channel sampling has been completed 
                      standard measurement tools appropriate to the                       over three main phases of exploration drilling and 
                      minerals under investigation, such as down hole gamma               sampling: 
                      sondes, or handheld XRF instruments, etc). These 
                      examples should not be taken as limiting the broad 
                      meaning of sampling.                                          o 1972 - 1984 Peñarroya - Adaro. 
                                                                                    Diamond drill core method was used to 
                                                                                    obtain samples for geological logging 
                                                                                    and sampling. 
                                                                                    o 2006 - 2008 Lundin Mining. Diamond 
                                                                                    drill core method was used. Core logging 
                                                                                    completed on paper. 
                                                                                    o Europa Metals. Diamond drill core, 
                                                                                    RC chips and underground cut channel 
                                                                                    sampling methods used to obtain samples 
                                                                                    for geological logging and sampling. 
                                                                                     *    Drill core samples were half core with an average 
                                                                                          length of 1m. 
 
 
                                                                                     *    No handheld XRF instruments were used. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                 *    Include reference to measures taken to ensure sample          *    Channel sampling was supervised by a Europa Metals' 
                      representivity and the appropriate calibration of any              geologist and samples that did not cross lithological 
                      measurement tools or systems used                                  boundaries were possible. 
 
 
                                                                                    *    The measures for sample representivity are unknown 
                                                                                         for the historical drilling. 
 
 
                                                                                    *    Efforts to ensure sample representativity for the 
                                                                                         Europa Metals' drilling include: 
 
 
                                                                                   o Constant review of recovery data with 
                                                                                   drill crews, 
                                                                                   o Review of downhole survey data while 
                                                                                   drilling in progress to ensure the piece 
                                                                                   points are being intercepted, 
                                                                                   o Always sampling the same side of the 
                                                                                   core, while leaving the orientation line 
                                                                                   in place. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                  *    Aspects of the determination of mineralisation that      *    2006 - 2008 Lundin Mining sent half core samples for 
                       are Material to the Public Report.                            multi-element analysis of available Peñarroya 
                                                                                     DDH samples completed at ALS Chemex Vancouver using 
                                                                                     ICP. 
 
 
                                                                                *    Lundin sent their core samples to ALS Chemex 
                                                                                     Vancouver for ICP analysis . 
 
 
                                                                                *    Europa Metals sent all samples to ALS Seville for 
                                                                                     preparation and multi-element analysis by ICP. 
 
 
                                                                                *    ALS Seville is accredited and conforms with 
                                                                                     ISO9001:2008. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                 *    In cases where 'industry standard' work has been done          *    Historic and recent diamond drill core methods are 
                      this would be relatively simple (e.g. 'reverse                      discussed below: 
                      circulation drilling was used to obtain 1 m samples 
                      from which 3 kg was pulverised to produce a 30 g 
                      charge for fire assay'). In other cases more                  o 
                      explanation may be required, such as where there is           1972 
                      coarse gold that has inherent sampling problems.              - 
                      Unusual commodities or mineralisation types (e.g.             1984 
                      submarine nodules) may warrant disclosure of detailed         Peñarroya 
                      information.                                                  - 
                                                                                    Adaro. 
                                                                                    Geological 
                                                                                    and 
                                                                                    analytical 
                                                                                    data 
                                                                                    is 
                                                                                    recorded 
                                                                                    on 
                                                                                    hardcopy. 
                                                                                    Selective 
                                                                                    sampling 
                                                                                    method 
                                                                                    was 
                                                                                    employed 
                                                                                    around 
                                                                                    areas 
                                                                                    of 
                                                                                    interest. 
                                                                                    Sampling 
                                                                                    intervals 
                                                                                    measure 
                                                                                    approx. 
                                                                                    1m, 
                                                                                    half 
                                                                                    core 
                                                                                    sent 
                                                                                    for 
                                                                                    analysis, 
                                                                                    with 
                                                                                    half 
                                                                                    core 
                                                                                    retained 
                                                                                    for 
                                                                                    reference. 
                                                                                    Exact 
                                                                                    details 
                                                                                    on 
                                                                                    core 
                                                                                    processing, 
                                                                                    sampling 
                                                                                    techniques 
                                                                                    and 
                                                                                    analytical 
                                                                                    methods 
                                                                                    are 
                                                                                    unclear. 
                                                                                    o 
                                                                                    2006 
                                                                                    - 
                                                                                    2008 
                                                                                    Lundin 
                                                                                    Mining. 
                                                                                    Diamond 
                                                                                    drill 
                                                                                    core 
                                                                                    method 
                                                                                    was 
                                                                                    used. 
                                                                                    Core 
                                                                                    logging 
                                                                                    completed 
                                                                                    on 
                                                                                    paper. 
                                                                                    Selective 
                                                                                    sampling 
                                                                                    method 
                                                                                    was 
                                                                                    employed 
                                                                                    around 
                                                                                    areas 
                                                                                    of 
                                                                                    interest. 
                                                                                    Sampling 
                                                                                    intervals 
                                                                                    measure 
                                                                                    approx. 
                                                                                    1m, 
                                                                                    half 
                                                                                    core 
                                                                                    sent 
                                                                                    for 
                                                                                    analysis, 
                                                                                    with 
                                                                                    half 
                                                                                    core 
                                                                                    retained 
                                                                                    for 
                                                                                    reference. 
                                                                                    Samples 
                                                                                    typically 
                                                                                    1m 
                                                                                    half 
                                                                                    core, 
                                                                                    with 
                                                                                    samples 
                                                                                    prepared 
                                                                                    at 
                                                                                    the 
                                                                                    then 
                                                                                    Lundin 
                                                                                    Laboratory 
                                                                                    in 
                                                                                    Switzerland, 
                                                                                    then 
                                                                                    shipped 
                                                                                    to 
                                                                                    ALS 
                                                                                    Chemex 
                                                                                    Vancouver 
                                                                                    for 
                                                                                    multi-element 
                                                                                    analysis 
                                                                                    by 
                                                                                    ICP. 
                                                                                    o 
                                                                                    Europa 
                                                                                    Metals. 
                                                                                    Diamond 
                                                                                    drill 
                                                                                    core, 
                                                                                    RC 
                                                                                    chips 
                                                                                    and 
                                                                                    underground 
                                                                                    cut 
                                                                                    channel 
                                                                                    sampling 
                                                                                    methods 
                                                                                    used 
                                                                                    to 
                                                                                    obtain 
                                                                                    samples 
                                                                                    for 
                                                                                    geological 
                                                                                    logging 
                                                                                    and 
                                                                                    sampling. 
                                                                                    Geological 
                                                                                    and 
                                                                                    analytical 
                                                                                    data 
                                                                                    is 
                                                                                    recorded 
                                                                                    on 
                                                                                    hardcopy. 
                                                                                    Selective 
                                                                                    sampling 
                                                                                    method 
                                                                                    was 
                                                                                    employed 
                                                                                    around 
                                                                                    areas 
                                                                                    of 
                                                                                    interest. 
                                                                                    Sampling 
                                                                                    intervals 
                                                                                    measure 
                                                                                    approx. 
                                                                                    1m, 
                                                                                    half 
                                                                                    core 
                                                                                    sent 
                                                                                    for 
                                                                                    analysis, 
                                                                                    with 
                                                                                    half 
                                                                                    core 
                                                                                    retained 
                                                                                    for 
                                                                                    reference. 
                                                                                    Samples 
                                                                                    sent 
                                                                                    to 
                                                                                    ALS 
                                                                                    Seville 
                                                                                    for 
                                                                                    preparation 
                                                                                    and 
                                                                                    multi-element 
                                                                                    analysis 
                                                                                    by 
                                                                                    ICP. 
                                                                                    Half 
                                                                                    core 
                                                                                    and 
                                                                                    RC 
                                                                                    samples 
                                                                                    reduced 
                                                                                    to 
                                                                                    -400 
                                                                                    microns 
                                                                                    and 
                                                                                    100g 
                                                                                    sub-sample 
                                                                                    taken 
                                                                                    for 
                                                                                    analysis. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 Drilling 
  techniques     *    Drill type (e.g. core, reverse circulation, open-hole     *    A total of 172 diamond and RC drill holes (including 
                      hammer, rotary air blast, auger, Bangka, sonic, etc)           wedges) totalling 59,658.73 metres, and 19 
                      and details (e.g. core diameter, triple or standard            underground channels for 18.75 metres were used as 
                      tube, depth of diamond tails, face-sampling bit or             the input database for geological modelling and 
                      other type, whether core is oriented and if so, by             resource estimation. These holes include 
                      what method, etc).                                             environmental monitoring holes. 
 
 
                                                                                *    Drill core diameter was PQ, HQ, NQ, NQ2 and BQ 
                                                                                     depending upon depth. Standard tube was used for 
                                                                                     Peñarroya drilling. Triple tube method was used 
                                                                                     for Lundin and Europa Metals' campaigns. 
 
 
                                                                                *    Europa Metals' diamond core was orientated using the 
                                                                                     reflex ACT III. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 Drill 
  sample          *    Method of recording and assessing core and chip          *    Total core recovery, solid core recovery, Rock 
  recovery             sample recoveries and results assessed.                       Quality Designation (RQD) and fracture frequency were 
                                                                                     recorded on hardcopy tables for the diamond drilling. 
 
 
                                                                                *    A total of 14,706 core recovery measurements exists 
                                                                                     in the database for the drilling with average 
                                                                                     recovery of 79%. The average for the Europa Metals' 
                                                                                     diamond drilling is 96%. Core recovery is measured 
                                                                                     over run lengths. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                 *    Measures taken to maximise sample recovery and ensure         *    The drilling procedures for the historical works have 
                      representative nature of the samples.                              not been reviewed and as such, the measures taken for 
                                                                                         sample recovery and to ensure representativity cannot 
                                                                                         be commented on. 
 
 
                                                                                    *    Efforts to maximise sample recovery for the Europa 
                                                                                         Metals' drilling include: 
 
 
                                                                                   o 
                                                                                   Constant 
                                                                                   review 
                                                                                   of 
                                                                                   recovery 
                                                                                   data 
                                                                                   with 
                                                                                   drill 
                                                                                   crews, 
                                                                                   o 
                                                                                   Slowing 
                                                                                   drill 
                                                                                   rate 
                                                                                   in 
                                                                                   areas 
                                                                                   of 
                                                                                   broken 
                                                                                   ground, 
                                                                                   o 
                                                                                   Reducing 
                                                                                   run 
                                                                                   lengths 
                                                                                   in 
                                                                                   areas 
                                                                                   of 
                                                                                   broken 
                                                                                   ground. 
                                                                                   o 
                                                                                   Use 
                                                                                   of 
                                                                                   specific 
                                                                                   drilling 
                                                                                   fluids 
                                                                                   (stabilised 
                                                                                   slurries) 
                                                                                   in 
                                                                                   broken 
                                                                                   ground 
                                                                                   areas. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                 *    Whether a relationship exists between sample recovery     *    The resource database contains 3,012 bulk density 
                      and grade and whether sample bias may have occurred            measurements, with a total of 234 within the 
                      due to preferential loss/gain of fine/coarse                   mineralised wireframe, with a mean value of 2.84 
                      material.                                                      g/cm(3) . 
 
 
                                                                                *    A broad linear relationship between Pb+Zn grade and 
                                                                                     Bulk Density was identified from scattergrams and the 
                                                                                     formula 2.7 + 0.02(Pb+Zn%) used to estimate block 
                                                                                     density in relation to block grade within the block 
                                                                                     model, density was capped the 3.5 g/cm(3) . 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 Logging 
                  *    Whether core and chip samples have been geologically     *    Selected intervals representing areas of interest 
                       and geotechnically logged to a level of detail to             were logged in the Peñarroya drill holes. All 
                       support appropriate Mineral Resource estimation,              Lundin and Europa Metals holes were logged in their 
                       mining studies and metallurgical studies.                     entirety. The historical Peñarroya core was 
                                                                                     re-logged by Europa Metals geologists in 2018 in its 
                                                                                     entirety where the core was available. 
 
 
                                                                                *    Core logging was recorded on paper logs, using a 
                                                                                     combination of printed graphic log templates 
                                                                                     (Peñarroya, Lundin), and paper (Europa Metals). 
 
 
                                                                                *    Logging records lithology, textures, mineralisation, 
                                                                                     weathering, alteration and veining where appropriate. 
 
 
                                                                                *    The core and channel logging has been completed to a 
                                                                                     sufficient level of detail to support appropriate 
                                                                                     Mineral Resource Estimations. 
 
 
                                                                                *    Geotechnical data for the drill holes has been 
                                                                                     reviewed. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                  *    Whether logging is qualitative or quantitative in        *    Drill core was qualitative and quantitative in 
                       nature. Core (or costean, channel, etc) photography.          nature. 
 
 
                                                                                *    DH lithology, alteration, mineralisation and 
                                                                                     structural observations were recorded by variable 
                                                                                     interval based on characteristic similarities and 
                                                                                     change boundaries. 
 
 
                                                                                *    Summary interval information was inputted to Excel, 
                                                                                     comprising single code field and codes to describe 
                                                                                     logged lithology, alteration, mineralisation and 
                                                                                     major structure for the interval. 
 
 
                                                                                *    Lundin and Europa Metals core is routinely 
                                                                                     photographed. Historical Peñarroya core was 
                                                                                     photographed during the re-logging in 2018. 
 
 
                                                                                *    Channel sample logging was quantitative in nature and 
                                                                                     not photographed. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                  *    The total length and percentage of the relevant          *    All drill core and RC chips were logged in their 
                       intersections logged.                                         entirety. 
 
 
                                                                                *    Channel samples were logged in their entirety. 
 
 
                                                                                *    Graphic and schematic logs were produced for all 
                                                                                     drilling. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 Sub-sampling 
  techniques      *    If core, whether cut or sawn and whether quarter,        *    The sub-sampling techniques and sample preparation 
  and sample           half or all core taken.                                       details are not known for the Peñarroya drill 
  preparation                                                                        core. 
 
 
                                                                                *    Lundin and Europa Metals' core was cut in half using 
                                                                                     a core saw. Sampling was supervised by the geologist. 
 
 
                                                                                *    Europa Metals' field duplicates are quarter core. 
 
 
                                                                                *    Underground channels were cut by angle 
                                                                                     grinder/circular saw. A channel approximately 7 cm 
                                                                                     wide and 5 cm deep to obtain 2-3 kg sample. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                  *    If non-core, whether riffled, tube sampled, rotary       *    Channel samples were not split. They were sent to ALS 
                       split, etc and whether sampled wet or dry.                    as bulk 2-3kg samples. 
 
 
                                                                                *    RC samples were riffled at the rig and were generally 
                                                                                     dry when split. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                  *    For all sample types, the nature, quality and            *    The drilling procedures for the historical works have 
                       appropriateness of the sample preparation technique.          not been reviewed and as such, the appropriateness 
                                                                                     cannot be commented upon. However, the lithology and 
                                                                                     assay determinations are sufficient for an Inferred 
                                                                                     category. 
 
 
                                                                                *    Channel sample collection and Europa Metals' drilling 
                                                                                     procedures, sample size, preparation and analysis are 
                                                                                     considered appropriate for the mineralogy and deposit 
                                                                                     type. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                  *    Quality control procedures adopted for all               *    The drilling procedures for the historical works have 
                       sub-sampling stages to maximise representivity of             not been reviewed and as such, the QC procedures 
                       samples.                                                      cannot be commented upon. 
 
 
                                                                                *    All half core was taken on the left side. 
 
 
                                                                                *    Samples were constrained by lithology but were 1m in 
                                                                                     length where possible or divided equally where 
                                                                                     necessary. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                  *    Measures taken to ensure that the sampling is            *    Field duplicate scattergram analysis of the samples 
                       representative of the in situ material collected,             shows a good correlation between the original and 
                       including for instance results for field                      duplicate samples. 
                       duplicate/second-half sampling. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                  *    Whether sample sizes are appropriate to the grain        *    Statistical analysis shows that samples are 
                       size of the material being sampled.                           appropriate to the grain size of the material being 
                                                                                     sampled. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 Quality 
  of assay        *    The nature, quality and appropriateness of the           *    Historical Peñarroya assaying and laboratory 
  data and             assaying and laboratory procedures used and whether           procedures are unknown. 
  laboratory           the technique is considered partial or total. 
  tests 
                                                                                *    Commercial laboratories ALS Chemex Vancouver and ALS 
                                                                                     Seville (ISO9001:2008) were used for Lundin and 
                                                                                     Europa Metals' drill core respectively and Europa 
                                                                                     Metals' underground channel sample analysis. 
 
 
                                                                                *    Multi-element analysis, including Pb, Zn, Cu, Ag by 
                                                                                     ICP-MS were completed on all samples. 
 
 
                                                                                *    Over limits samples were re-analysed using ore grade 
                                                                                     methods of determination. 
 
 
                                                                                *    Sample analytical techniques are considered in line 
                                                                                     with industry standard for this style of 
                                                                                     mineralisation. 
 
 
                                                                                *    Given the expected grades, lithology and deposit type, 
                                                                                     the laboratory procedures are considered appropriate 
                                                                                     for this level of classification. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                 *    For geophysical tools, spectrometers, handheld XRF        *    No geophysical tools, spectrometers or handheld XRF 
                      instruments, etc, the parameters used in determining           instruments were used in the exploration and resource 
                      the analysis including instrument make and model,              work. 
                      reading times, calibrations factors applied and their 
                      derivation, etc. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                    *    Nature of quality control procedures adopted (e.g.     *    QC sample insertion procedures were not employed 
                         standards, blanks, duplicates, external laboratory          during the historical Peñarroya drill campaigns. 
                         checks) and whether acceptable levels of accuracy           However, Lundin re-analysis of Peñarroya drill 
                         (i.e. lack of bias) and precision have been                 core pulp rejects does allow for comparison of 
                         established.                                                original and pulp duplicate analysis results for 
                                                                                     verification purposes. 
 
 
                                                                                *    Lundin Mining completed limited quarter core field 
                                                                                     duplicate insertion and pulp reject re-analysis. No 
                                                                                     external standards. 
 
 
                                                                                *    Europa Metals conducted a QC programme of inserting 
                                                                                     quarter core field duplicates, course blank and pulp 
                                                                                     blank material, standards, selection of pulp repeats 
                                                                                     and submission of pulp rejects for umpire lab 
                                                                                     re-analysis. 
 
 
                                                                                *    ALS Chemex and ALS Seville internal QC exists for the 
                                                                                     Peñarroya Lundin re-analysis, Lundin core and 
                                                                                     Europa Metals core and channel sample batches. 
 
 
                                                                                *    No significant issues were identified in the QC data. 
 
 
                                                                                *    The nature and quantity of QC data, procedures 
                                                                                     employed, level of accuracy and precision are 
                                                                                     considered acceptable for the assigned resource 
                                                                                     classification. The quality of assay data and 
                                                                                     laboratory tests is acceptable for the resource 
                                                                                     classification for this deposit. 
 
 
                                                                                *    Shewhart Plots of the QC samples showed no sample 
                                                                                     bias and CRMS returned within acceptable limits. 
 
 
                                                                                *    Nelson rules of monitoring were applied. 
 
 
                                                                                *    The nature and quantity of QC data for the channel 
                                                                                     sampling, procedures employed, level of accuracy and 
                                                                                     precision are considered acceptable for the assigned 
                                                                                     resource classification. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 Verification 
 of sampling      *    The verification of significant intersections by         *    Drill core has been routinely verified by AMS 
 and assaying          either independent or alternative company personnel.          geologists throughout the various recent drilling 
                                                                                     programmes. 
 
 
                                                                                *    27 verification samples have been taken. 
 
 
                                                                                *    Geological data from gallery is observed and reported 
                                                                                     by geologists and mining engineers. 
 
 
                                                                                *    Paper recorded drill hole logging data is transferred 
                                                                                     to Access, imported into Micromine 3D geological 
                                                                                     modelling software for validation. 
 
 
                                                                                *    No significant issues in the drill logging were 
                                                                                     observed. The logging is accurate and suitable. 
=============  ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                  *    The use of twinned holes.                                *    There has been no verification twin drilling carried 
                                                                                     out. 
=============  ============================================================  ================================================================= 
 
                 *    Documentation of primary data, data entry procedures,     *    DGPS collar and survey excel data, and lab analytical 
                      data verification, data storage (physical and                  data transferred from lab.csv, to Excel and imported 
                      electronic) protocols.                                         to Micromine 3D geological modelling software. 
 
 
                                                                                *    All analytical data generated from Lundin re-analysis 
                                                                                     and Lundin core samples, Europa Metals' core and 
                                                                                     channel samples for use as input to estimation have 
                                                                                     been verified by cross reference against lab assay 
                                                                                     certificates, re-import and re-building of the 
                                                                                     project analytical database. 
 
 
                                                                                *    2018-2020 lab certificates were verified and checked 
                                                                                     against database assays. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                  *    Discuss any adjustment to assay data.                    *    No adjustment to the analytical data was considered 
                                                                                     necessary, other than conversion to zinc equivalents 
                                                                                     for reporting purposes, following industry best 
                                                                                     practice. Raw analytical data remained unchanged. 
=============  ============================================================  ================================================================= 
 Location 
  of data        *    Accuracy and quality of surveys used to locate drill      *    Peñarroya drill hole collar locations were 
  points              holes (collar and down-hole surveys), trenches, mine           measured off plans and sections, located on the 
                      workings and other locations used in Mineral Resource          ground and picked up using Geomax 35 high-precision 
                      estimation.                                                    DGPS device. Accuracy +/-5 m. Peñarroya drill 
                                                                                     hole dip and azimuth measured from historical plans, 
                                                                                     cross sections and longitudinal section. Accuracy 
                                                                                     +/-5 m. 
 
 
                                                                                *    Europa Metals' drill collar locations were surveyed 
                                                                                     using a Geomax Zenith 35 DGPS device with 
                                                                                     sub-centimetre accuracy. Both RC and diamond downhole 
                                                                                     surveys were competed at 5-10 m regular intervals 
                                                                                     using a REFLEX GYRO(TM) tool. 
 
 
                                                                                *    Old workings were surveyed using Lieca Disto tmx310 
                                                                                     survey device. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                  *    Specification of the grid system used.                   *    Data was captured and located using a Universal 
                                                                                     Transverse Mercator (UTM). The geographic coordinate 
                                                                                     reference system used by the client was European 
                                                                                     Terrestrial Reference System 1989 UTM Zone 29 
                                                                                     ('ETRS89 / UTM29N'). 
 
 
                                                                                *    Elevations are reported in metres above sea level. 
               ============================================================  ================================================================= 
 
                  *    Quality and adequacy of topographic control.             *    Topographic DTM taken from 5m resolution Lidar data 
                                                                                     MDT05-Lidar, from government mapping and survey 
                                                                                     association Plan Nacional de Ortofotografía 
                                                                                     Aérea (PNOA). 
 
 
                                                                                *    Topographic control is sufficient for level of 
                                                                                     resource category. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 Data spacing 
 and              *    Data spacing for reporting of Exploration Results.       *    Drill and UG channel sample data spacing across the 
 distribution                                                                        current resource area ranges from approximately 
                                                                                     50-100mx50-100m centres within the most densely 
                                                                                     tested area towards the NW, stepping out to 
                                                                                     approximately 200mx200m within the mid-section, and 
                                                                                     100-200x500m in the SE. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                 *    Whether the data spacing and distribution is              *    The distribution of drillholes and UG channel 
                      sufficient to establish the degree of geological and           sampling is sufficient to establish the degree of 
                      grade continuity appropriate for the Mineral Resource          geological and grade continuity appropriate for JORC 
                      and Ore Reserve estimation procedure(s) and                    (2012) Indicated and Inferred classification of 
                      classifications applied.                                       resources. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                  *    Whether sample compositing has been applied.             *    Length weighted averages including internal waste 
                                                                                     were applied for reporting of exploration results. 
 
 
                                                                                *    The details are shown with the accompanying tables. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 Orientation 
 of data         *    Whether the orientation of sampling achieves unbiased     *    Drilling and underground sampling is angled to 
 in relation          sampling of possible structures and the extent to              intercept mineralised structures at high angle, as 
 to                   which this is known, considering the deposit type.             close to perpendicular to dip and strike as 
 geological                                                                          practicable. 
 structure 
 
                                                                                *    3D review of sections shows that there appears to be 
                                                                                     no sample bias introduced by drilling orientation. 
 
 
                                                                                *    True thicknesses are reported in the accompanying 
                                                                                     tables. 
=============  ------------------------------------------------------------  ----------------------------------------------------------------- 
 
                  *    If the relationship between the drilling orientation     *    The mineralisation is a steeply dipping vein and 
                       and the orientation of key mineralised structures is          sampling tries to reduce the bias by sampling on a 
                       considered to have introduced a sampling bias, this           perpendicular plane where possible. 
                       should be assessed and reported if material. 
 
                                                                                *    Review of drilling and channel sections with the 
                                                                                     lithological unit appear to show no obvious bias. 
=============  ============================================================  ================================================================= 
 Sample 
  security        *    The measures taken to ensure sample security.            *    Historical Peñarroya sample security protocols 
                                                                                     are not available. 
 
 
                                                                                *    Lundin/Europa Metals' drill core is transported from 
                                                                                     site to logging facility in securely covered core 
                                                                                     boxes by the Lundin/Europa Metals' geologists. 
 
 
                                                                                *    Core logged and sampled in secure facility. 
 
 
                                                                                *    Samples are bagged in plastic bags and labelled with 
                                                                                     individual sample numbers, sample name and sample 
                                                                                     location. Each bag is sealed to avoid tampering and 
                                                                                     contamination. 
 
 
                                                                                *    Plastic bags are placed in dry weave bags. 
 
 
                                                                                *    Samples are delivered to laboratory by courier in 
                                                                                     secured boxes/bags. 
 
 
                                                                                *    Couriers transported the samples to ALS. The couriers 
                                                                                     were then responsible for the chain of custody. 
 
 
                                                                                *    The samples arrive in good condition at ALS Seville. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 Audits 
  or reviews      *    The results of any audits or reviews of sampling         *    Numerous site visits have been conducted to the Toral 
                       techniques and data.                                          Project and core processing facility in Ponferrada 
                                                                                     (licence number 15.199), the latest on 29 August 2021 
                                                                                     by Mr. James Hogg (CP). 
 
 
                                                                                *    Data has also been reviewed regularly by AMS staff as 
                                                                                     it is received from the laboratory and on submission 
                                                                                     of databases from Europa Metals. 
 
 
                                                                                *    Findings were satisfactory and suitable for use in 
                                                                                     mineral resource estimation. 
               ------------------------------------------------------------  ----------------------------------------------------------------- 
 

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

 
    Criteria                          JORC Code explanation                                                  AMS Comments 
 Mineral 
  tenement             *    Type, reference name/number, location and ownership      *    Toral exploration permit number 15.199 (also referred 
  and land                  including agreements or material issues with third            to as Permiso de Investigacion), is located 
  tenure status             parties such as joint ventures, partnerships,                 approximately 400km northwest of Madrid, within the 
                            overriding royalties, native title interests,                 Province of León, Autonomous Community of 
                            historical sites, wilderness or national park and             Castile and Le n. 
                            environmental settings. 
 
                                                                                     *    Licence 15.199 covers an area of 20.29km(2). 
 
 
                                                                                     *    Exploration licence 15.199 is owned by Europa Metals 
                                                                                          Iberia., a wholly owned subsidiary of Europa Metals 
                                                                                          Ltd. The licence was renewed on 15 November 2020 for 
                                                                                          a further period of 3 years. 
                 ---------------------------------------------------------------  ----------------------------------------------------------------- 
 
                    *    The security of the tenure held at the time of              *    All tenements are in good standing. 
                         reporting along with any known impediments to 
                         obtaining a licence to operate in the area. 
                                                                                     *    AMS are unaware of any impediments that may affect 
                                                                                          the licences. 
                 ---------------------------------------------------------------  ----------------------------------------------------------------- 
 Exploration 
  done by           *    Acknowledgment and appraisal of exploration by other        *    1972-1984 - Peñarroya-Adaro. 58 drill holes, 32 
  other parties          parties.                                                         wedge drill holes. 
 
 
                                                                                     *    1992-1995 - Geominera. Data re-evaluation. 
 
 
                                                                                     *    2005-2008 - Lundin Mining. 7 drill holes. 
 
 
                                                                                     *    2009-2011 - Goldquest Mining. Soil and rock 
                                                                                          geochemistry. Historic gallery mapping. Data 
                                                                                          evaluation. NI43-101 Mineral Resource Estimate 
 
 
                                                                                     *    2012-2015 - Portex Mining Corporation. Geological 
                                                                                          mapping. Data re-evaluation. 
 
 
                                                                                     *    2015-2016 - Goldquest Iberica S.L. Soil and rock 
                                                                                          geochemistry. Geological mapping. 
 
 
                                                                                     *    2016-2017 - Goldquest Iberica S.L. (Europa Metals 
                                                                                          Limited). 6 drill holes. Historic gallery mapping and 
                                                                                          sampling. Data re-evaluation and interpretation. 
                 ---------------------------------------------------------------  ----------------------------------------------------------------- 
 Geology 
                    *    Deposit type, geological setting and style of               *    The Toral project is located in the Southwestern part 
                         mineralisation                                                   of the regional West Asturian Leonese Zone (WALZ), a 
                                                                                          major tectono-stratigraphic unit of the Hercynian 
                                                                                          Orogeny. 
 
 
                                                                                     *    The mineralisation at Toral is considered as 
                                                                                          structurally controlled carbonate hosted Pb-Zn type. 
                                                                                          Shear and thrust fault controlled mineralisation 
                                                                                          within favourable carbonate lithology and favourable 
                                                                                          contrasting contacts between carbonates and shales. 
 
 
                                                                                     *    Styles of mineralisation are boudinage drusy quartz 
                                                                                          vein, replacement breccia, disseminated clots 
                                                                                          associated with silica, carbonate and chlorite 
                                                                                          alteration. 
 
 
                                                                                     *    Main metallic minerals are Sphalerite, Galena, Pyrite, 
                                                                                          Chalcopyrite and silver. 
                 ---------------------------------------------------------------  ----------------------------------------------------------------- 
 Drill hole 
  Information          *    A summary of all information material to the                   *    Topographic DTM taken from 5m resolution Lidar data 
                            understanding of the exploration results including a                MDT05-Lidar, from government mapping and survey 
                            tabulation of the following information for all                     association Plan Nacional de Ortofotografía 
                            Material drill holes:                                               Aérea (PNOA). 
 
 
                      o easting and northing                                               *    Drilling: 
                      of the drill hole 
                      collar 
                      o elevation or RL                                                   o Number of drillholes used: 172 
                      (Reduced Level - elevation                                          o Collar East: 679962 mE - 684690 
                      above sea level in                                                  mE 
                      metres) of the drill                                                o Collar North: 4708653 mN - 4710598 
                      hole collar                                                         mN 
                      o dip and azimuth                                                   o Collar RL: 411 mRL - 754 mRL 
                      of the hole                                                         o Azimuth: 000deg - 354deg 
                      o down hole length                                                  o Dip: -90deg - -40deg 
                      and interception depth                                              o Length: 35.40m - 1285.3m 
                      o hole length.                                                      o Interception depth: 588 mRL - -398 
                                                                                          mRL 
                                                                                          o 1,615 Pb and Zn assay values (from 
                                                                                          115 drillholes) 
                                                                                          o 1,454 Ag assay values (from 101 
                                                                                          drillholes) 
                                                                                           *    UG Channels: 
 
 
                                                                                          o Number of channels: 19 
                                                                                          o Collar East: 680917mE - 682607mE 
                                                                                          o Collar North: 4709161mN - 4709996mN 
                                                                                          o Collar RL: 447mRL - 693mRL 
                                                                                          o Azimuth: 010deg - 313deg 
                                                                                          o Dip: -24deg - 19deg 
                                                                                          o Length: 0.25m - 4.25m 
===============  ---------------------------------------------------------------  ----------------------------------------------------------------- 
                                                                                   *    No data is being excluded. 
                    *    If the exclusion of this information is justified on 
                         the basis that the information is not Material and 
                         this exclusion does not detract from the 
                         understanding of the report, the Competent Person 
                         should clearly explain why this is the case. 
===============  ===============================================================  ================================================================= 
 Data 
 aggregation        *    In reporting Exploration Results, weighting averaging       *    During block model interpolation, the influence of 
 methods                 techniques, maximum and/or minimum grade truncations             some isolated high-grade values was found to be 
                         (e.g. cutting of high grades) and cut-off grades are             sufficiently localised and did not have undue 
                         usually Material and should be stated.                           influence on the estimates of grade. It was decided 
                                                                                          that no need for top cutting was required. 
                 ---------------------------------------------------------------  ----------------------------------------------------------------- 
 
                    *    Where aggregate intercepts incorporate short lengths        *    Data aggregation or Grade Compositing rules for the 
                         of high grade results and longer lengths of low grade            reporting of exploration drill and channel 
                         results, the procedure used for such aggregation                 significant results were minimum width 1m, minimum 
                         should be stated and some typical examples of such               average grade 0.5% ZnEq, maximum allowable internal 
                         aggregations should be shown in detail.                          waste of 2m. 
                 ===============================================================  ================================================================= 
 
                    *    The assumptions used for any reporting of metal             *    Zn equivalent calculations were based on 3 year 
                         equivalent values should be clearly stated.                      trailing average price statistics obtained from the 
                                                                                          London Metal Exchange and London Bullion Market 
                                                                                          Association giving an average Zn price of US$2,516/t, 
                                                                                          Pb price of US$1,961/t and Ag price of US$19.4/oz. 
 
 
                                                                                     *    Recovery and selling factors were incorporated into 
                                                                                          the calculation of Zn Eq values. 
 
 
                                                                                     *    It is the Company's opinion that all the elements 
                                                                                          included in the metal equivalents calculation (zinc, 
                                                                                          lead and silver) have a reasonable potential to be 
                                                                                          recovered and sold. 
                 ---------------------------------------------------------------  ----------------------------------------------------------------- 
 Relationship 
 between            *    These relationships are particularly important in the       *    Mineralisation is interpreted as sub-vertical to 
 mineralisation          reporting of Exploration Results.                                steeply dipping to the NE. 
 widths and 
 intercept 
 lengths                                                                             *    Drilling and underground sampling considered the 
                                                                                          nature of the mineralisation prior to commencement of 
                                                                                          exploration. 
                 ---------------------------------------------------------------  ----------------------------------------------------------------- 
 
                    *    If the geometry of the mineralisation with respect to       *    Angled drilling is sub-perpendicular to +/- 20 
                         the drill hole angle is known, its nature should be              oblique to mineralisation. 
                         reported. 
 
                                                                                     *    Review of drilling and channel sections with the 
                                                                                          lithological unit appear to show no obvious bias. 
                 ---------------------------------------------------------------  ----------------------------------------------------------------- 
 
                    *    If it is not known and only the down hole lengths are       *    True thickness of mineralisation ranges from 
                         reported, there should be a clear statement to this              approximately 90%-60% downhole interval length. 
                         effect (e.g. 'down hole length, true width not 
                         known'). 
                                                                                     *    True lengths are reported in the tables, as 
                                                                                          calculated by Micromine. 
                 ---------------------------------------------------------------  ----------------------------------------------------------------- 
 Diagrams 
                    *    Appropriate maps and sections (with scales) and             *    Appropriate scaled diagrams are included within the 
                         tabulations of intercepts should be included for any             AMS Toral JORC (2012) Resource Statement and 
                         significant discovery being reported. These should               Technical Report. 
                         include, but not be limited to a plan view of drill 
                         hole collar locations and appropriate sectional 
                         views.                                                      *    Tables of intercepts are included in the relevant 
                                                                                          sections. 
                 ---------------------------------------------------------------  ----------------------------------------------------------------- 
 Balanced 
  reporting         *    Where comprehensive reporting of all Exploration            *    All available exploration data for the Toral deposit 
                         Results is not practicable, representative reporting             area has been collected and reported. 
                         of both low and high grades and/or widths should be 
                         practiced to avoid misleading reporting of 
                         Exploration Results.                                        *    Representative data from all drilling and underground 
                                                                                          channel sampling has been reported. 
                 ---------------------------------------------------------------  ----------------------------------------------------------------- 
 Other 
 substantive        *    Other exploration data, if meaningful and material,            *    No geophysical works have been completed. 
 exploration             should be reported including (but not limited to): 
 data                    geological observations; geophysical survey results; 
                         geochemical survey results; bulk samples - size and            *    Geological mapping and solid geology map generation 
                         method of treatment; metallurgical test results; bulk               completed. 
                         density, groundwater, geotechnical and rock 
                         characteristics; potential deleterious or 
                         contaminating substances.                                      *    Structural interpretation and 3D modelling completed. 
 
 
                                                                                        *    Soil geochemical surveys demonstrate strong coherent 
                                                                                             Zn in soil anomalism coincident with interpreted 
                                                                                             controlling structures. 
 
 
                                                                                        *    Geotechnical tests have been carried out on 84 
                                                                                             samples chosen by Europa Metals in different 
                                                                                             lithologies. Data have been compiled from 48 samples 
                                                                                             tested for geotechnical studies from old reports from 
                                                                                             Peñarroya. 
 
 
                                                                                        *    Metallurgical testing has been completed at Wardell 
                                                                                             Armstrong's laboratory. The results of the testwork 
                                                                                             are discussed within the technical report. 
                 ---------------------------------------------------------------  ----------------------------------------------------------------- 
 Further 
  work              *    The nature and scale of planned further work (e.g.          *    Surface drilling and trenching works testing open 
                         tests for lateral extensions or depth extensions or              strike extent to the SE and NW and infill drilling 
                         large-scale step-out drilling).                                  within current resource limits to increase confidence 
                                                                                          and resource class. 
 
 
                                                                                     *    Increased metallurgical and recovery test work. 
                 ---------------------------------------------------------------  ----------------------------------------------------------------- 
 
                    *    Diagrams clearly highlighting the areas of possible         *    Appropriate scaled diagrams and maps are included 
                         extensions, including the main geological                        within the AMS Toral JORC (2012) Resource Statement 
                         interpretations and future drilling areas, provided              and Technical Report. 
                         this information is not commercially sensitive 
                 ---------------------------------------------------------------  ----------------------------------------------------------------- 
 

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

 
 Criteria         JORC Code explanation                                                                  AMS Comments 
 Database 
  integrity         *    Measures taken to ensure that data has not been          *    Analytical data is pared by query with sampling data 
                         corrupted by, for example, transcription or keying            via sample number. 
                         errors, between its initial collection and its use 
                         for Mineral Resource estimation purposes. 
                                                                                  *    AMS has cross referenced the analytical database with 
                                                                                       laboratory certificates. 
 
 
                                                                                  *    Micromine 3D geological modelling and estimation 
                                                                                       software used for import, validation and QAQC 
                                                                                       verification assessment. 
 
 
                                                                                  *    Basic core and sample storage, handling, data capture 
                                                                                       and transfer methodologies discussed and are 
                                                                                       considered satisfactory. 
 
 
                                                                                  *    The database is suitable for use for use in Mineral 
                                                                                       Resource Estimates. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Data validation procedures used.                         *    Micromine 2021 software was used to validate the 
                                                                                       channel sampling and drill hole databases. 
 
 
                                                                                  *    Data checks include overlapping and missing intervals, 
                                                                                       trace errors, missing survey and coordinate data, 
                                                                                       lithology, consistency of sample lengths interval 
                                                                                       files. Checks for out of range values were also made. 
 
 
                                                                                  *    No significant errors were found within the database. 
                                                                                       Some minor typographical errors were identified and 
                                                                                       fixed. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 Site visits 
                       *    Comment on any site visits undertaken by the          *    The Competent Person for the resource estimation is 
                            Competent Person and the outcome of those visits.          Mr. James Hogg. Mr Hogg's, last site visit was 
                                                                                       completed on 29 August 2021. 
 
 
                                                                                  *    Site visits have not identified any issues relating 
                                                                                       to the reporting of mineral resources. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
                                                                                *    Site visits have been undertaken. 
                    *    If no site visits have been undertaken indicate why 
                         this is the case. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 Geological 
 interpretation    *    Confidence in (or conversely, the uncertainty of) the     *    Based upon the level of available information, 
                        geological interpretation of the mineral deposit.              geological and deposit complexity, interpretation of 
                                                                                       the main lithological boundaries and controls to 
                                                                                       mineralisation are considered satisfactory and 
                                                                                       appropriate for the assigned resource class. 
 
 
                                                                                  *    Fault modelling is simplified, and further refinement 
                                                                                       will improve the models accuracy moving forward. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Nature of the data used and of any assumptions made.     *    Drillhole lithological and analytical information, 
                                                                                       prospect scale surface geological mapping, 
                                                                                       underground mapping and sampling, location of 
                                                                                       underground workings were used in geological 
                                                                                       interpretation. 
 
 
                                                                                  *    Mineralisation is modelled as a continuous unit 
                                                                                       within the major fault units, however it is 
                                                                                       anticipated some smaller scale faulting and offset 
                                                                                       post mineralisation will be present which is not 
                                                                                       accounted for in modelling. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                   *    The effect, if any, of alternative interpretations on     *    Alternative interpretations infer potential thrust 
                        Mineral Resource estimation.                                   repeats and potential for additional parallel 
                                                                                       mineralised zones. However, at the level of 
                                                                                       information this interpretation remains unsupported 
                                                                                       by drill data and conceptual in nature. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                   *    The use of geology in guiding and controlling Mineral     *    Drillhole lithological and analytical information and 
                        Resource estimation.                                           underground channel mapping and sampling were used in 
                                                                                       geological interpretation. 
 
 
                                                                                  *    The geological model was used to guide the 
                                                                                       interpretation and continuity of Zn-Pb mineralised 
                                                                                       domains. 
 
 
                                                                                  *    Post mineralisation transfer faults are interpreted 
                                                                                       to affect continuity by minor offset. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    The factors affecting continuity both of grade and       *    Grade continuity is currently interpreted to be 
                         geology.                                                      slightly greater down dip forming "shoots". Faulting 
                                                                                       effects geological continuity on a local scale 
                                                                                       (50-100m) perpendicular to the strike on 
                                                                                       mineralisation. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 Dimensions 
                   *    The extent and variability of the Mineral Resource        *    Mineralisation is encountered at surface and based on 
                        expressed as length (along strike or otherwise), plan          current testing, extends to approximately 1,100m 
                        width, and depth below surface to the upper and lower          below the surface. Mineralisation is currently tested 
                        limits of the Mineral Resource.                                across a 3,600m strike length, the orientation of 
                                                                                       mineralisation zone is approximately 110 degrees, 
                                                                                       averaging approximately 3.5m in thickness and ranging 
                                                                                       from 2m to 5.5m. 
 
 
                                                                                  *    Mineralisation is encountered at surface as a process 
                                                                                       of the incisions. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 Estimation 
  and modelling    *    The nature and appropriateness of the estimation            *    As with previous resource estimates completed by AMS 
  techniques            technique(s) applied and key assumptions, including              (2017, 2018, 2019, 2020) wireframe solid models were 
                        treatment of extreme grade values, domaining,                    created for each domain based on a mineralisation 
                        interpolation parameters and maximum distance of                 threshold of approximately 0.2% for Zn and Pb 
                        extrapolation from data points. If a computer                    (approximately 0.4% Zn+Pb). Analysis of Zn and Pb 
                        assisted estimation method was chosen include a                  grades in cross section and in scatter plots showed a 
                        description of computer software and parameters used.            strong relationship and no requirement to model Zn 
                                                                                         and Pb separately was identified. Ag showed a strong 
                                                                                         correlation with Pb and was estimated within the 
                                                                                         Zn/Pb mineralised domain. 
 
 
                                                                                    *    The updated wireframes were generated using 
                                                                                         Micromine's implicit vein modelling functionality and 
                                                                                         incorporated major fault boundaries to better honour 
                                                                                         offsets in the structure and preserve thicknesses 
                                                                                         between intercepts. Interpretation of the mineralised 
                                                                                         domains was guided by geological interpretation of 
                                                                                         the deposit incorporating structural and lithological 
                                                                                         boundaries and surface expression in topographical 
                                                                                         data and outcrop mapping. 
 
 
                                                                                    *    A weathering surface which represents the approximate 
                                                                                         transition partially weathered material to material 
                                                                                         dominated by joint weathering and fresh rock was 
                                                                                         modelled manually in cross section. 
 
 
                                                                                    *    A main structure or vein (MV) was modelled and split 
                                                                                         into four fault units. Four subordinate structures 
                                                                                         accounting for less than 1% of the mineralised volume 
                                                                                         were modelled manually using cross section string 
                                                                                         interpretation. Some drill holes are outside the 
                                                                                         licence to the northwest. The model included these 
                                                                                         drillholes, but the resultant block model was 
                                                                                         filtered to only include blocks within the licence 
                                                                                         boundary. 
 
 
                                                                                    *    To the northwest the resource is truncated by the 
                                                                                         licence boundary and are extended approximately 10m 
                                                                                         past the south easterly most drillhole which was 
                                                                                         mineralised but contained sub-economic grades (3 m at 
                                                                                         2.4% ZnEq). The total strike length of the modelled 
                                                                                         mineralisation within the licence is approximately 
                                                                                         3.1 km. The structure remains open to the southeast. 
                                                                                         Down dip the model was extrapolated approximately 
                                                                                         50-200m below the deepest sample in the northwest and 
                                                                                         central parts of the deposit, and approximately 
                                                                                         250-280m below the deepest sample in the southeast 
                                                                                         with consideration of depths tested along strike to 
                                                                                         the northwest. The models extent from surface to a 
                                                                                         range of approximately 800 - 1150 m below the 
                                                                                         surface. Extents of extrapolation are considered 
                                                                                         appropriate for the level of information, deposit 
                                                                                         type, strike and depth extents tested, observed and 
                                                                                         geostatistical grade continuity and the assigned 
                                                                                         resource classification. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    The availability of check estimates, previous            *    The estimates have been reconciled against previous 
                         estimates and/or mine production records and whether          AMS estimates. 
                         the Mineral Resource estimate takes appropriate 
                         account of such data. 
                                                                                  *    The increases / decreases are related to data 
                                                                                       confidence and additional samples and updated models. 
 
 
                                                                                  *    A full description for the differences is described 
                                                                                       in the body text. 
 
 
                                                                                  *    There are no historical production records to 
                                                                                       validate against. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    The assumptions made regarding recovery of               *    It is the opinion of the Company that Ag will be 
                         by-products.                                                  recovered along with Pb and Zn and a credit paid on 
                                                                                       refining. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                   *    Estimation of deleterious elements or other non-grade     *    No estimation of deleterious elements has been made 
                        variables of economic significance (e.g. sulphur for           at this time and it is anticipated this will be 
                        acid mine drainage characterisation).                          conducted on completion of a block model which is to 
                                                                                       be used for PFS. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    In the case of block model interpolation, the block      *    A uniform cell block model of 25m E, 10 m N, 25m Z 
                         size in relation to the average sample spacing and            was restricted to the wireframes using block factors. 
                         the search employed.                                          The block model was rotated by 20deg in plan view to 
                                                                                       best match the trend of mineralisation. The uniform 
                                                                                       model and 2m sample composites for the mineralised 
                                                                                       domain were then flattened to a constant vertical 
                                                                                       plane striking 110deg to account for fault offsets, 
                                                                                       improve variography and grade mapping. Thickness was 
                                                                                       preserved in the flattening process and no lateral 
                                                                                       stretching was applied. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Any assumptions behind modelling of selective mining     *    Wireframe models included minimum anticipated mining 
                         units.                                                        width of 2m. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Any assumptions about correlation between variables.     *    As with previous resource estimates completed by AMS 
                                                                                       (2017, 2018, 2019 and 2020) wireframe solid models 
                                                                                       were created for each domain based on a 
                                                                                       mineralisation threshold of approximately 0.2% for Zn 
                                                                                       and Pb (approximately 0.4% Zn+Pb). 
 
 
                                                                                  *    Analysis of Zn and Pb grades in cross section and in 
                                                                                       scatter plots showed a strong relationship and no 
                                                                                       requirement to model Zn and Pb separately was 
                                                                                       identified. Ag showed a strong correlation with Pb 
                                                                                       and was estimated within the Zn/Pb mineralised 
                                                                                       domain. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Description of how the geological interpretation was     *    The updated wireframes were generated using 
                         used to control the resource estimates.                       Micromine's implicit vein modelling functionality and 
                                                                                       incorporated major fault boundaries as inclined and 
                                                                                       vertical planes. Interpretation of the mineralised 
                                                                                       domains was guided by geological interpretation of 
                                                                                       the deposit incorporating structural and lithological 
                                                                                       boundaries such as footwall slate contacts and 
                                                                                       surface expression in topographical data and outcrop 
                                                                                       mapping. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Discussion of basis for using or not using grade         *    During block model interpolation, the influence of 
                         cutting or capping.                                           some isolated high-grade values was found to be 
                                                                                       sufficiently localized and did not have undue 
                                                                                       influence on the estimates of grade. 
 
 
                                                                                  *    It was decided that no need for top cutting was 
                                                                                       required. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                   *    The process of validation, the checking process used,     *    The block model was validated visually in long 
                        the comparison of model data to drill hole data, and           section and cross section to inspect assay grades vs 
                        use of reconciliation data if available.                       block grades, particular attention was given to areas 
                                                                                       of low grade that may be influenced by higher grade 
                                                                                       samples within search radii. The mean values 
                                                                                       including declustered mean of the input data were 
                                                                                       compared against the output data along with 
                                                                                       comparison of histograms. Several sensitivity checks 
                                                                                       were completed using different kriging 
                                                                                       neighbourhoods. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 Moisture 
                    *    Whether the tonnages are estimated on a dry basis or     *    Tonnages are estimated on a dry basis. 
                         with natural moisture, and the method of 
                         determination of the moisture content. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 Cut-off 
  parameters        *    The basis of the adopted cut-off grade(s) or quality     *    For the purpose of reporting updated resources with 
                         parameters applied.                                           reasonable prospect of eventual economic extraction a 
                                                                                       cut-off grade of 4% Zn equivalent was selected, based 
                                                                                       upon mining, processing, and production rate 
                                                                                       parameters identified in the updated scoping study 
                                                                                       (2020), using a three-year trailing average price for 
                                                                                       Zn, Pb and Ag. 
 
 
                                                                                  *    Zn equivalent calculations were based on 3 year 
                                                                                       trailing average price statistics obtained from the 
                                                                                       London Metal Exchange and London Bullion Market 
                                                                                       Association giving an average Zn price of US$2,516/t, 
                                                                                       Pb price of US$1,961/t and Ag price of US$19.4/oz. 
 
 
                                                                                  *    Zn Eq (PbAg)% is the calculated Zn equivalent 
                                                                                       incorporating silver credits as well as lead and is 
                                                                                       the parameter used to define the cut-off grade used 
                                                                                       for reporting resources (Zn Eq (PbAg)% = Zn + 
                                                                                       Pb*0.867 + Ag*0.027). 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 Mining factors 
 or assumptions    *    Assumptions made regarding possible mining methods,       *    Assumed mining methods are based upon a review of 
                        minimum mining dimensions and internal (or, if                 methods of extraction, cost and performance on 
                        applicable, external) mining dilution. It is always            similar type deposits. Summary of mining and 
                        necessary as part of the process of determining                processing costs used in determination of economic 
                        reasonable prospects for eventual economic extraction          cut off. Mechanised Cut and fill mining method 
                        to consider potential mining methods, but the                  assumed. 
                        assumptions made regarding mining methods and 
                        parameters when estimating Mineral Resources may not 
                        always be rigorous. Where this is the case, this          *    Total Mining Processing cost estimated at US$62.93/t. 
                        should be reported with an explanation of the basis            Dilution assumed at 90% and 10%. 
                        of the mining assumptions made. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 Metallurgical 
 factors           *    The basis for assumptions or predictions regarding        *    Assumed processing methods are based upon a review of 
 or assumptions         metallurgical amenability. It is always necessary as           methods of extraction, cost and performance of 
                        part of the process of determining reasonable                  similar type deposits. 
                        prospects for eventual economic extraction to 
                        consider potential metallurgical methods, but the 
                        assumptions regarding metallurgical treatment             *    Assumed metallurgical recoveries are Zn 85%, Pb 86% 
                        processes and parameters made when reporting Mineral           and 82% Ag. 
                        Resources may not always be rigorous. Where this is 
                        the case, this should be reported with an explanation 
                        of the basis of the metallurgical assumptions made.       *    Assumed concentrate selling factors are Zn 85%, Pb 
                                                                                       95%, Ag 89% 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 Environmental 
 factors           *    Assumptions made regarding possible waste and process     *    No assumptions are made on environmental factors 
 or assumptions         residue disposal options. It is always necessary as            other than the cost to back fill waste tailings. 
                        part of the process of determining reasonable 
                        prospects for eventual economic extraction to 
                        consider the potential environmental impacts of the       *    Flora and fauna studies were started in 2019 by the 
                        mining and processing operation. While at this stage           companies and institution of "Universidad de Leon" 
                        the determination of potential environmental impacts,          and "Mas que pájaros, biologia, ecoturismo y 
                        particularly for a greenfields project, may not                medioambiente S.L". Their report is pending. 
                        always be well advanced, the status of early 
                        consideration of these potential environmental 
                        impacts should be reported. Where these aspects have      *    AMS has not reviewed any Environmental, Social and 
                        not been considered this should be reported with an            Permitting (ES&P) documents or licences. 
                        explanation of the environmental assumptions made. 
 
                                                                                  *    AMS understands that there are no legal or project 
                                                                                       permitting, environmental and social settings issues 
                                                                                       or risks. 
 
 
                                                                                  *    No red flags were identified via the site visit or 
                                                                                       study desk review. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 Bulk density 
                   *    Whether assumed or determined. If assumed, the basis      *    The bulk density was calculated using the Archimedes 
                        for the assumptions. If determined, the method used,           method weighting the samples in air and water using a 
                        whether wet or dry, the frequency of the measurements          Kern precision balance. 
                  , 
                        the nature, size and representativeness of the 
                        samples.                                                  *    Bulk density measurements were carried out on most of 
                                                                                       the drillholes, in both mineralised and 
                                                                                       un-mineralised samples. 
 
 
                                                                                  *    The resource database contains 3,012 bulk density 
                                                                                       measurements, with a total of 234 within the 
                                                                                       mineralised wireframe, with a mean value of 2.84 
                                                                                       g/cm(3) . 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
                                                                                *    No bulk material was measured. 
                    *    The bulk density for bulk material must have been 
                         measured by methods that adequately account for void 
                         spaces (vugs, porosity, etc), moisture and 
                         differences between rock and alteration zones within 
                         the deposit. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                   *    Discuss assumptions for bulk density estimates used       *    The resource database contains 3,012 bulk density 
                        in the evaluation process of the different materials.          measurements, with a total of 234 within the 
                                                                                       mineralised wireframe, with a mean value of 2.84 
                                                                                       g/cm(3) . 
 
 
                                                                                  *    A broad linear relationship between Pb+Zn grade and 
                                                                                       Bulk Density was identified from scattergrams and the 
                                                                                       formula 2.7 + 0.02(Pb+Zn%) used to estimate block 
                                                                                       density in relation to block grade within the block 
                                                                                       model, density was capped the 3.5 g/cm(3) . 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 Classification 
                    *    The basis for the classification of the Mineral          *    In the updated resource estimation of the Toral 
                         Resources into varying confidence categories.                 property, the above definitions have been taken into 
                                                                                       consideration when applying resource classification. 
                                                                                       It was the opinion of the Competent Person that 
                                                                                       within some areas of the deposit sample density, 
                                                                                       Quality Control data, density determinations and 
                                                                                       drilling recoveries were sufficient to allow 
                                                                                       classification of some additional Indicated Resources 
                                                                                       versus the previous (2020) Resource Estimate. 
 
 
                                                                                  *    The area of the previous Indicated Resources was 
                                                                                       still found to be valid with the addition of some new 
                                                                                       drilling at higher elevations which was considered 
                                                                                       suitable for inclusion in the Indicated Resource. 
                                                                                       Within the indicated area the mean average distance 
                                                                                       of composites is 95m and the mean closest distance 
                                                                                       48m. The remaining blocks within the block model were 
                                                                                       classified to the Inferred category. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                   *    Whether appropriate account has been taken of all         *    The assigned classification of Inferred and Indicated 
                        relevant factors (i.e. relative confidence in                  reflects the Competent Persons' assessment of the 
                        tonnage/grade estimations, reliability of input data,          accuracy and confidence levels in the input data and 
                        confidence in continuity of geology and metal values,          the resulting Mineral Resource Estimate. 
                        quality, quantity and distribution of the data). 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    Whether the result appropriately reflects the            *    The result reflects the quality and quantity of data, 
                         Competent Person's view of the deposit.                       geostatistical analysis of correlation and 
                                                                                       relationship between mineralised samples 
                                                                                       (semi-variography) and the Competent Person's view of 
                                                                                       the deposit. 
 
 
                                                                                  *    The semi-variography reflects the sample density. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 Audits 
  or                *    The results of any audits or reviews of Mineral          *    The 2021 Mineral Resource has been reviewed 
  reviews                Resource estimates.                                           internally as part of normal validation processes by 
                                                                                       AMS. 
 
 
                                                                                  *    The AMS 2021 resource estimate has not been audited 
                                                                                       or reviewed externally at the time of writing. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 Discussion 
  of relative      *    Where appropriate a statement of the relative             *    It is the Competent Person's opinion that the level 
  accuracy/             accuracy and confidence level in the Mineral Resource          of confidence is consistent with the level of 
  confidence            estimate using an approach or procedure deemed                 Inferred and Indicated categorised mineral resources. 
                        appropriate by the Competent Person. For example, the 
                        application of statistical or geostatistical 
                        procedures to quantify the relative accuracy of the       *    Geostatistical assessment of confidence limits such 
                        resource within stated confidence limits, or, if such          as conditional simulation of grades has not been 
                        an approach is not deemed appropriate, a qualitative           conducted at this time. 
                        discussion of the factors that could affect the 
                        relative accuracy and confidence of the estimate. 
                                                                                  *    Interpretation of the thickness and therefore volume 
                                                                                       of the mineralisation along with bulk density have 
                                                                                       the greatest effect on the contained metal. 
 
 
                                                                                  *    Kriging neighbourhood and the control of higher grade 
                                                                                       samples and preventing them from over smoothing is 
                                                                                       also important in producing a realistic estimate. 
 
 
                                                                                  *    It is the Competent Person 's opinion that the level 
                                                                                       of confidence is consistent with the level of 
                                                                                       Indicated and Inferred categorised mineral resources. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    The statement should specify whether it relates to       *    The estimate is a local estimate to the 25m block 
                         global or local estimates, and, if local, state the           scale; however, the data density is too sparse to 
                         relevant tonnages, which should be relevant to                allow modelling of selective units inside of the 25m 
                         technical and economic evaluation. Documentation              panel scale. 
                         should include assumptions made and the procedures 
                         used. 
                                                                                  *    As with all kriged estimates there is a degree of 
                                                                                       smoothing. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 
                    *    These statements of relative accuracy and confidence     *    There are no historical production records from the 
                         of the estimate should be compared with production            deposit. 
                         data, where available. 
                 ------------------------------------------------------------  --------------------------------------------------------------- 
 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

UPDSDEFMSEFSEDU

(END) Dow Jones Newswires

October 01, 2021 01:59 ET (05:59 GMT)

Europa Metals (LSE:EUZ)
Gráfica de Acción Histórica
De Mar 2024 a Abr 2024 Haga Click aquí para más Gráficas Europa Metals.
Europa Metals (LSE:EUZ)
Gráfica de Acción Histórica
De Abr 2023 a Abr 2024 Haga Click aquí para más Gráficas Europa Metals.