WASHINGTON, May 9, 2024
/PRNewswire/ -- Panhandle Power Solutions (PPS), a
wholly-owned subsidiary of Bristol Bay Native Corporation (BBNC),
an Alaskan Native Corporation, that services utility and
investment-grade commercial clients in the renewable energy sector,
today announced it will serve as the EPC for a new battery energy
storage system for Whetstone Power, a developer of sustainable
energy infrastructure. The contract underscores PPS' commitment to
providing full-spectrum specialty Engineer Procure Construct (EPC)
services that support the energy transition for its commercial
clients.
The Colorado-based, 202.2 MWh
battery energy storage system will showcase state-of-the-art
technologies that will help provide peak load-shaving capabilities
to a local electric utility. It marks a significant milestone in
the state's sustainable energy infrastructure and, once complete,
will play an important role in enhancing grid resiliency and
optimizing energy resources.
"It is with great excitement that PPS has been entrusted as the
EPC by Whetstone Power for this project," commented Robin Hurst, Vice President of Renewables at
PPS. "We are a resourceful and resilient organization committed to
the highest standards of engineering, procurement, and
construction. The PPS team is excited to bring this dedication, as
well as our commitment to safety and environmental standards, to
this project. Over the next six months, we look forward to meeting
the needs of our client and deploying this clean energy project in
Colorado."
PPS has just broken ground on the project, which is expected to
be completed by October 1, 2024. To
date, the company has deployed more than 1.5 GW of distributed
generation and utility-scale clean energy projects across
the United States.
To learn more about PPS, please visit
https://www.panhandlepower.us/.
About Panhandle Power Solutions (PPS)
PPS is a
wholly-owned subsidiary of Bristol Bay Native Corporation (BBNC),
an Alaskan Native Corporation. With offices in Washington, D.C., and northwest Florida, PPS was founded in 2008 and served as
a federal contractor providing general construction and electrical
services to the nation's most critical defense facilities. The
company was acquired in 2019 by BBNC and has expanded to serve
utility and investment-grade commercial clients in the renewable
energy sector while maintaining the legacy of its federal roots. In
2023, PPS joined BBNC's Industrial Group, Bristol Bay Industrial
(BBI). As a BBI member company, PPS adds to BBI's already robust
electrical capabilities. For more information about PPS, visit the
company website or follow their LinkedIn page for recent news and
updates.
Media Contact
Shannon
Furey
shannon@mdidit.com
732-995-1638
View original content to download
multimedia:https://www.prnewswire.com/news-releases/panhandle-power-solutions-named-epc-for-202-2-mwh-bess-in-colorado-302141292.html
SOURCE Panhandle Power Solutions