RB Energy Inc. (the "Company" or "RBI" or RB Energy") (TSX:RBI)(OTCQX:RBEIF) is
pleased to report financial and operating results for the three months ended
March 31, 2014. The consolidated financial statements together with Management's
Discussion and Analysis will be available on the Company's web site
(www.rb-e.com) and on SEDAR (www.sedar.com).


FIRST QUARTER HIGHLIGHTS

Corporate

The Company's acquisition of Sirocco Mining Inc. ("Sirocco"), first announced on
December 4, 2013, closed on January 31, 2014 at which time the Company acquired
all of the issued and outstanding common shares of Sirocco in exchange for
approximately 294 million common shares of the Company. At the same time, the
Company completed a post-acquisition share consolidation on the basis of one new
share for three existing shares.


In March 2014, RB Energy negotiated amendments to the $75.0 million debt
facility put in place for the construction of the Quebec Lithium operation, to
better align the repayment terms with the revised commissioning schedule. As a
result, the four 2014 principal repayments have been reduced from $24.3 million
to $11.4 million. The deferred payments have been rescheduled to the periods
from March 2015 to March 2017.


Subsequent to the end of the quarter, the Company announced a $22 million
bought-deal equity financing to increase its current treasury. The financing is
expected to close on or about May 21, 2014. 


Quebec Lithium

Unusually cold temperatures in northern Quebec during the first three months of
2014 made the operation of the crushing and grinding circuit problematic, with
fine ore freezing in the storage silos. Consequently, the Company elected not to
operate the concentrator and focused on the commissioning of the
hydro-metallurgical circuit of the plant using the spodumene concentrate
stockpiled during the 2013 commissioning of the concentrator circuit. The
hydro-metallurgical circuit was operated in commissioning mode for over six
weeks and produced high quality battery grade lithium carbonate (99.9% lithium
carbonate).


Subsequent to quarter end, with the onset of warmer temperatures, RBI re-started
the concentrator with the objective of achieving continuous battery grade
lithium production and first sales by the end of May. 


Aguas Blancas

For the full three months ended March 31, 2014, Aguas Blancas produced 318
tonnes of iodine at a cash cost of US $25 per kg and sold 256 tonnes at an
average price of US $38 per kg. Sales and shipments of iodine in the quarter
were negatively impacted by both a port strike and an earthquake in Chile. Over
the last 12 months the iodine price has softened due to an imbalance of supply
over demand. Most recently however, prices have shown signs of firming up and
demand is improving. 


RESULTS FROM OPERATIONS

Quebec Lithium is in the commissioning stage and has yet to generate sales and
revenues. The financial results from Aguas Blancas are included in the
consolidated financial statements of RB Energy from January 31, 2014, the
closing date of the acquisition of Sirocco by the Company. Further, IFRS
requires RBI to value Sirocco's iodine inventory acquired on January 31, 2014 at
its fair value on the date of acquisition. As a result, the operating margin in
the statement of operations will not reflect normal course of business until
such time as the effect of the fair value of the acquired inventory is absorbed
under the Company's weighted average cost methodology applied under its
accounting principles.


During the three months ended March 31, 2014, the Company incurred a net loss of
$7.5 million ($0.04 per share) compared with a net loss of $2.6 million ($0.02
per share) in the same period in 2013. One-time transaction costs associated
with the acquisition of Sirocco account for $3.3 million of the net loss. In
addition, general and administrative expenses of $1.8 million (2013: $2.3
million) include costs to maintain offices and staff in Vancouver, Toronto and
Montreal. A decision to close the Toronto and Montreal offices was made on
January 31, 2014with all corporate functions consolidated in Vancouver effective
April 30, 2014. 


The foreign exchange loss of $1.8 million (2013: $142,000) is due principally to
the negative impact of the weaker Canadian dollar against the US dollar on the
carrying value of the US dollar denominated convertible debentures and cash
advances from a customer. Interest expense of $0.8 million (2013: nil) relates
mainly to the debt supporting iodine operations and interest accrued on cash
advances from a customer. Interest on the debt for Quebec Lithium is capitalized
during commissioning.




                                                                     
---------------------------------------------------------------------
Three Months Ended                                 Mar-14      Mar-13
---------------------------------------------------------------------
---------------------------------------------------------------------
Total revenues ($000's) (Note 1)                    5,044           -
---------------------------------------------------------------------
Net loss ($000's)                                   7,474       2,555
---------------------------------------------------------------------
Loss per share, basic and diluted ($)                0.04        0.02
---------------------------------------------------------------------
Total assets ($000's) (Note 2)                    477,484     344,076
---------------------------------------------------------------------
Total liabilities ($000's) (Note 2)               218,895     163,337
---------------------------------------------------------------------
Iodine produced (t) (Note 1)                          211           -
---------------------------------------------------------------------
Iodine sold (t) (Note 1)                              126           -
---------------------------------------------------------------------
Iodine avg. price ($/kg) (Note 1)                      40           -
---------------------------------------------------------------------
Iodine cash operating cost ($/kg) (Note 1, 3)          27           -
---------------------------------------------------------------------
                                                                            
Note 1: revenues and iodine data are from February 1 to March 31, 2014, the 
period post acquisition of Sirocco.                                         
Note 2: comparative data provided as at December 31, 2013.                  
Note 3: this is a non-GAAP measure. It was calculated by dividing cost of   
sales ($4.7 million), adjusted for the change in inventory ($1.4 million)   
and the related depreciation ($0.4 million), by quantities of iodine        
produced in the period.                                                     
Note 4: for complete details, refer to the March 31, 2014 interim           
consolidated financial statements and MD&A.                                 



The increase in total assets and liabilities from December 31, 2013 is due to
the acquisition of Sirocco and the consolidation of its net assets as well as
the ongoing construction and commissioning of the lithium processing plant in
Quebec. Capitalized items include borrowing and operating costs for Quebec
Lithium during the period. 


OUTLOOK

Quebec Lithium

RB Energy's focus is on completing the commissioning of the processing plant and
ramp up to name plate production before the end of 2014. The 2014 timetable
includes four operating objectives:




1.  commissioning of the hydro-metallurgical circuits - completed in Q1
    2014; 
2.  achieve continuous production of battery-grade lithium carbonate on a
    continuous basis by the end of Q2 2104 - on target; 
3.  install a primary optical ore sorter (to reduce ore dilution) during Q2,
    with commissioning completed in early Q3, thereby increasing concentrate
    grade in Q3 2014 - installation commenced; and 
4.  reach name plate production capacity before the end of 2014 - on
    schedule.



The extent of 2014 revenue will depend on the timing of achieving commercial
production and the ramp up of production volumes. Based on the information
currently available to the Company, 2014 lithium production is estimated to be
in the 9,000 - 11,000 tonne range. As 2014 will be the first year of operations
of the plant, substantially involving commissioning, the estimate of production
may have a degree of variability. Operating costs for 2014 will be capitalized
until commercial production has been achieved, currently estimated in late Q3 or
Q4.


As part of the commissioning process, various plant improvements have been
identified and are in progress, including the installation of an optical sorter
($5.6 million), completion of mill construction ($3.3 million), rerouting the
local access road from the open pit area ($1.5 million), and construction of a
natural gas pipeline ($4.2 million). In addition, RB Energy estimates that
several individually smaller capital upgrades will also be warranted.


Aguas Blancas

Production at Aguas Blancas was reduced in late 2013 by placing the Agitated
Leach Plant ("ALP") on care and maintenance in response to softening prices in
the market. As a result, operations in 2014 will be limited to heap leaching. In
2014, production of iodine is estimated at 1,000 tonnes at a cash cost of
approximately US $29/kg. Aguas Blancas expects to supplement the sales of its
2014 production by reducing the level of its approximate 800 tonnes of finished
product inventory.


Also late in 2013, the completion of the expansion of the ALP was deferred to
2015. The majority of the equipment for the completion of the expansion is on
site. Capital costs in 2014 will be limited to settling the balance of payment
of equipment orders ($1.2 million) for the expansion, completion of the chemical
plant upgrade ($0.9 million) and sustaining capital of $1.4 million.


About RB Energy Inc.

RBI is a Canadian company formed pursuant to the arrangement involving Sirocco
Mining Inc. and Canada Lithium Corp. It currently owns Aguas Blancas, an iodine
producing mine in northern Chile, and Quebec Lithium near Val d'Or, the
geographical heart of the Quebec mining industry. The Aguas Blancas mine is
currently in production. The Quebec Lithium has completed construction and is in
the commissioning phase. For more information regarding RBI, please refer to its
public filings available at www.sedar.com.


The technical contents of this release have been reviewed by Mr. Kevin Ross,
Eur. Ing., a Qualified Person pursuant to NI-43-101. Mr. Ross is Chief Operating
Officer of the Company and a Member of The Institute of Materials, Minerals and
Mining.


Forward-Looking Statements

Certain information contained in this news release, including any information
relating to the state of the lithium and iodine industries; statements regarding
our ability and the timing to achieve and sustain commercial production and
name-plate production levels of iodine; our ability to secure commercial orders
from our customers; and our ability to become a material player in the lithium
market are "forward-looking statements". These forward-looking statements relate
to future events or future performance and reflect the Company's expectations
regarding the future growth, results of operations, business prospects and
opportunities of RBI. These forward-looking statements also reflect the
Company's current internal projections, expectations or beliefs and are based on
information currently available to the Company. In some cases forward-looking
information can be identified by terminology such as "may", "will", "should",
"expect", "intend", "plan", "anticipate", "believe", "estimate", "projects",
"potential", "scheduled", "forecast", "budget" or the negative of those terms or
other comparable terminology. The estimates and assumptions of RBI underlying
the forward-looking statements in this news release may prove to be incorrect.
Assumptions upon which such forward looking information include, among other
things, successful and timely commissioning, ramp-up and production at the
Quebec Lithium Project; the lack of any further significant capital expenditures
during the commissioning stage or to bring the hydrometallurgical process plant
into production; the continuing support and cooperation of RBI's off-take
partners; as well as financial predictions premised on such assumptions.
Although the Company believes that the forward-looking information contained in
this news release is based on reasonable assumptions, readers cannot be assured
that actual results will be consistent with such statements. Accordingly,
readers are cautioned against placing undue reliance on forward-looking
information. RBI expressly disclaims any intention or obligation to update or
revise any forward-looking information, whether as a result of new information,
events or otherwise, except in accordance with applicable securities laws.


On behalf of the Board,

Richard P. Clark, President and CEO

FOR FURTHER INFORMATION PLEASE CONTACT: 
RB Energy Inc.
Sophia Shane
(604) 689-7842
(604) 689-4250 (FAX)
sophias@namdo.com

Alabama Graphite Corp. (TSXV:ALP)
Gráfica de Acción Histórica
De May 2024 a Jun 2024 Haga Click aquí para más Gráficas Alabama Graphite Corp..