Dore Copper Announces 2024 Annual and Special Meeting Results
20 Junio 2024 - 4:00PM
Doré Copper Mining Corp. (the "
Company" or
"
Doré Copper") (TSXV: DCMC; OTCQB: DRCMF; FRA:
DCM) reports that all matters submitted to the shareholders for
approval as set out in the Corporation's Notice of Meeting and
Information Circular, which were mailed to shareholders in
connection with the meeting, were approved at the Corporation's
Annual and Special Meeting held in Thunder Bay, Ontario, on June
20, 2024.
The shareholders elected Mario Stifano (Chair),
Ernest Mast (President and CEO), Frank Balint, Joseph de la Plante,
Sara Heston, Martha Manuel, and Brent Omland as directors of the
Corporation for the forthcoming year.
Shareholders approved the Corporation’s omnibus
share incentive plan and the reappointment of Ernst & Young
LLP, Chartered Professional Accountants, as the auditor of the
Corporation for the ensuing year.
About Doré Copper Mining
Corp.
Doré Copper Mining Corp. aims to be the next
copper producer in Québec with an initial production target of +50
Mlbs of copper equivalent annually by implementing a hub-and-spoke
operation model with multiple high-grade copper-gold assets feeding
its centralized Copper Rand mill.1 The Company has delivered its
PEA in May 2022 and is proceeding with a feasibility study.
The Company has consolidated a large land
package in the prolific Lac Doré/Chibougamau and Joe Mann mining
camps that has historically produced 1.6 billion pounds of
copper and 4.4 million ounces of gold.2 The land package
includes 13 former producing mines, deposits and resource target
areas within a 60-kilometre radius of the Company's Copper Rand
Mill. For further information, please contact:
Ernest Mast |
Laurie Gaborit |
President and Chief Executive Officer |
Vice President, Investor Relations |
Phone: (416) 792-2229 |
Phone: (416) 219-2049 |
Email: ernest.mast@dorecopper.com |
Email: laurie.gaborit@dorecopper.com |
|
|
Visit: www.dorecopper.com Facebook: Doré Copper MiningLinkedIn:
Doré Copper Mining Corp.Twitter: @DoreCopperInstagram:
@DoreCopperMining
- Technical report titled
"Preliminary Economic Assessment for the Chibougamau Hub-and-Spoke
Complex, Québec, Canada" dated June 15, 2022, in accordance with
National Instrument 43-101 – Standards of Disclosure for
Mineral Projects. The Technical Report was prepared by BBA Inc.
with several consulting firms contributing to sections of the
study, including SLR Consulting (Canada) Ltd., SRK Consulting
(Canada) Inc. and WSP Inc.
- Sources for historic production
figures: Economic Geology, v. 107, pp. 963–989 - Structural and
Stratigraphic Controls on Magmatic, Volcanogenic, and Shear
Zone-Hosted Mineralization in the Chapais-Chibougamau Mining Camp,
Northeastern Abitibi, Canada by François Leclerc et al. (Lac
Dore/Chibougamau mining camp) and NI 43-101 Technical Report on the
Joe Mann Property dated January 11, 2016 by Geologica
Groupe-Conseil Inc. for Jessie Ressources Inc. (Joe Mann
mine).
Cautionary Note Regarding
Forward-Looking Statements This news release includes
certain "forward-looking statements" under applicable Canadian
securities legislation. Forward-looking statements include
predictions, projections and forecasts and are often, but not
always, identified by the use of words such as "seek",
"anticipate", "believe", "plan", "estimate", "forecast", "expect",
"potential", "project", "target", "schedule", "budget" and "intend"
and statements that an event or result "may", "will", "should",
"could" or "might" occur or be achieved and other similar
expressions and includes the negatives thereof. All statements
other than statements of historical fact included in this news
release, including, without limitation, statements with respect to
the timing and ability of the Company to receive necessary
regulatory approvals, the Company's ability to meet its production
target, the commencement, timing and completion of a feasibility
study, and the plans, operations and prospects of the Company and
its properties are forward-looking statements. Forward-looking
statements are necessarily based upon a number of estimates and
assumptions that, while considered reasonable, are subject to known
and unknown risks, uncertainties and other factors which may cause
actual results and future events to differ materially from those
expressed or implied by such forward-looking statements. Such
factors include, but are not limited to, actual exploration
results, changes in project parameters as plans continue to be
refined, future metal prices, availability of capital and financing
on acceptable terms, general economic, market or business
conditions, uninsured risks, regulatory changes, delays or
inability to receive required regulatory approvals, health
emergencies, pandemics and other exploration or other risks
detailed herein and from time to time in the filings made by the
Company with securities regulators. Although the Company has
attempted to identify important factors that could cause actual
actions, events or results to differ from those described in
forward-looking statements, there may be other factors that cause
such actions, events or results to differ materially from those
anticipated. There can be no assurance that such statements will
prove to be accurate, as actual results and future events could
differ materially from those anticipated in such statements.
Accordingly, readers should not place undue reliance on
forward-looking statements. The Company disclaims any intention or
obligation to update or revise any forward-looking statements,
whether as a result of new information, future events or otherwise,
except as required by law.
Neither TSX Venture Exchange nor its
Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for
the adequacy or accuracy of this news release.
Dore Copper Mining (TSXV:DCMC)
Gráfica de Acción Histórica
De Nov 2024 a Dic 2024
Dore Copper Mining (TSXV:DCMC)
Gráfica de Acción Histórica
De Dic 2023 a Dic 2024