Gold-Ore Resources Ltd. (TSX VENTURE:GOZ) is pleased to provide operational
highlights for December for the 100%-owned Bjorkdal Gold Mine in Sweden. During
December a total of 3,329 ounces of gold were recovered resulting in an
annualized rate of production of 39,948 ounces. At the beginning of 2008 the
mine was producing at the rate of 20,000 ounces per year; the current rate
represents a 100% increase in gold production. The Company will no longer
disclose month by month production, electing instead to adopt the industry
standard of reporting quarterly production statistics. A news release outlining
operational expansion plans and mine production objectives will be released by
month end. 


December, 2008 Gold Production

December was another excellent month for gold production at the Bjorkdal Mine. A
total of 3,329 ounces of gold were produced in December, which equates to an
annualized production rate of 39,948 ounces. The increased productivity
throughout 2008 is directly related to increased grades and tonnages achieved
from the underground mining unit.




------------------------------------------------------
December, 2008
------------------------------------------------------
Tonnes processed                                94,177
------------------------------------------------------
Daily throughput - tonnes                        3,038
------------------------------------------------------
Gold recovered - ounces                          3,329
------------------------------------------------------
               - kilograms                       103.5
------------------------------------------------------
Average plant recovery                             90%
------------------------------------------------------



To view accompanying chart please click on the following link:
http://media3.marketwire.com/docs/goz0114.pdf


Gold production at Bjorkdal is achieved by processing material from three
sources: underground, open pit and surface stockpiles. During the last four
months the underground unit supplied an average of 987 tonnes/day, the open pit
620 tonnes/day and the stockpiles 1,458 tonnes/day. 


About Gold-Ore 

Gold-Ore Resources is a gold mining and exploration company focused in Sweden.
The Company is debt-free and unhedged, and remains focused on increasing gold
production from the 100%-owned Bjorkdal Mine. In addition to Bjorkdal, the
Company also has other assets in the country; the Ronnberget Gold Property
(adjacent to Bjorkdal), the Norrliden Polymetallic Deposit and the Vallberget
Polymetallic Property. 


Bjorkdal property information is posted on the Company's web site at
www.goldoreresources.com.


ON BEHALF OF THE BOARD

Robert Wasylyshyn, President

This news release may contain forward-looking statements including but not
limited to comments regarding the timing and content of upcoming work programs,
geological interpretations, receipt of property titles, potential mineral
recovery processes, etc. Forward-looking statements address future events and
conditions and therefore, involve inherent risks and uncertainties. Actual
results may differ materially from those currently anticipated in such
statements.


News Release 09-02

Gold-Ore Resources Ltd (TSXV:GOZ)
Gráfica de Acción Histórica
De Jun 2024 a Jul 2024 Haga Click aquí para más Gráficas Gold-Ore Resources Ltd.
Gold-Ore Resources Ltd (TSXV:GOZ)
Gráfica de Acción Histórica
De Jul 2023 a Jul 2024 Haga Click aquí para más Gráficas Gold-Ore Resources Ltd.