HOUSTON, Oct. 13 /PRNewswire/ -- Arkanova Energy
Corporation (OTC Bulletin Board: AKVA), through our subsidiary
Provident Energy Associates of Montana, LLC, enters the completion phase
after finishing the drilling, casing and cementing portion of the
Tribal-Max 1-2817. The well was directionally drilled to a
total depth of 6,808 ft. Approximately 2,700 ft landed within the
Lower Cut Bank Sand and 91.7% of the lateral leg was placed in the
target zone. The Tribal-Max 1-2817 is in the Two Medicine
Cut Bank Sand Unit (TMCBSU) located at SE1/4 SW1/4 Section 28,
T32N, R6W, P.M.M., Glacier County,
Montana.
Provident Energy is currently working with Schlumberger on a
completion program for the well. In addition, the company is
implementing infrastructure upgrades to manage the initial
production of the Tribal-Max 1-2817. As far as the vertical test of
the lower targets, we anticipate the results of the logging and
coring within the month.
Provident Energy operates the TMCBSU and was acquired by a
subsidiary of Arkanova Energy Corporation in October, 2008.
About Arkanova Energy Corporation
Arkanova Energy is an exploration and junior production company
engaged in the acquisition, exploration, and development of oil and
gas properties. The company has secured working interest in three
key North American areas in Montana, Arkansas and Colorado. The company relies on experience,
science and proven growth strategies in order to continuously
balance a risk/reward portfolio.
For more information, please visit www.arkanovaenergy.com.
Investor Contact:
|
|
Burt Taylor
|
|
Tel: (281) 298-9555
email: info@arkanovaenergy.com
|
|
|
This press release contains projections and forward-looking
information that involve various risks and uncertainties regarding
future events. Such forward-looking information can include
statements based on current expectations involving a number of
risks and uncertainties and are not guarantees of future
performance of the company such as the statement that we anticipate
the results of the logging and coring within the month. Actual
results and future events could differ materially from those
anticipated in such information. Except as required by law, the
company does not intend to update such forward-looking information.
The contents of this press release should be considered in
conjunction with the risk factors and cautionary statements
contained in the company’s periodic filings with the Securities and
Exchange Commission available at www.sec.gov.
SOURCE Arkanova Energy Corporation
Copyright . 13 PR Newswire