TIDMPHE

RNS Number : 4564E

Powerhouse Energy Group PLC

30 June 2023

30 June 2023

Powerhouse Energy Group plc

("Powerhouse" or the "Company")

Audited Results for the Year Ended 31 December 2022

Powerhouse Energy Group Plc (AIM: PHE), a company pioneering integrated technology that converts non-recyclable waste into low carbon energy, is pleased to announce its audited results for the year ended 31 December 2022.

FY2022 Summary

Operational Performance

-- Substantial progress made in developing the Company's business strategy, exemplified by new project arrangements.

-- Creation of, and continuous progress on the Powerhouse Technology Centre at Bridgend, with view to placing Powerhouse Energy Group at the forefront of the waste-to-energy sector in pyrolysis and gasification.

Financial performance

   --     Company reported revenue for the year of GBP380,277. 
   --     Gross profit for the year of GBP84,365. 

-- Significant goodwill and trade debt impairment due to Company's changing business strategy. This reduction in the balance sheet value has no implication on the ongoing business of the Company.

   --     Cash at bank of GBP5,882,897 as at 31 December 2022. 

Company Growth

-- Negotiated terms for Powerhouse to take a 50% shareholding in the Peel NRE Ltd special purpose vehicle, Protos Plastics-to Hydrogen No 1 Ltd - transaction acquiring 100% of the share capital completed post the year end.

-- 50% shareholding agreed with Hydrogen Utopia International Plc at Konin in Poland and Tipperary, Ireland.

   --     Antony Gardner-Hillman appointed as Non-Executive Chairman. 
   --     Anthony Gale and David Hitchcock appointed as new Non-Executive Directors. 
   --     Keith Riley appointed as Interim Chairman and then as Acting Chief Executive Officer. 

Outlook

-- Change from the original business model, moving away from the model of licensing PHE technology to third party developers for flat returns by way of fixed annual licence fees.

-- Announced Joint Venture with Hydrogen Utopia International Plc at County Longford in Ireland, replacing the Tipperary project.

-- Obtained full ownership and control of the Protos Plastics-to Hydrogen No 1 Ltd site near Chester.

   --     Acquired the remaining 52% of Engsolve, the Company's engineering capability. 
   --     Appointment of Noage Energy Ltd as the Company's representative in Northern Ireland. 

-- Revitalised Board including the appointment new Non-Executive Directors bringing a range of additional skills and experience to support the highly experienced competent executive team, including the appointment of Professor Karol Kacprzak in February 2023.

-- Vision: to be a leader in technology solutions that rid the world of, and utilise, non-recycled wastes, producing sustainable energy whilst mitigating climate change impacts.

Antony Gardner-Hillman, Non-Executive Chairman, commented:

"Having joined the Board in January this year, I am delighted to see the considerable progress that the Company has made in such a short period of time. This year has seen Powerhouse focused on where the business is heading, moving away from the business model of licensing our technology to third party developers which we felt was under-selling the true value of Powerhouse.

We are also delighted to have re-shaped the Company's board, with four new non-executive directors who bring a wide range of extensive experience which will support the Company's growth and strategy going forward.

The changes implemented since the year end leave us well positioned to make significant progress this year and in the longer term as we strive towards a sustainable future. I look forward to the strong future that is ahead for Powerhouse."

Keith Riley, Acting Chief Executive Officer, commented:

"In 2022 we commenced a transition in the Company's business strategy that will start to be realised in 2023. This will be to recognise market demand and to provide the Company with a continuing revenue stream and enable its capital projects to be developed as the necessary elements come into place. We have also broadened the base of the business to allow this to happen.

We have had an excellent working relationship with Peel NRE Ltd and look forward to it continuing. 2022 showed, however, that the structure of the Protos Plastic to Hydrogen project as it was, was not optimal and needed to be changed. The two companies worked together on alternative arrangements and in 2023 we concluded that it was best for Powerhouse to take full control. We will now apply the strategy we describe in the Strategic Report in the Annual Report to bring it to fruition.

A key foundation stone of the new business strategy is the Company's knowhow and capabilities. In 2022 the Company took the decision to invest in these, firstly creating the Powerhouse Technology Centre at Bridgend in Wales, which will be in operation in late 2023, and then the acquisition of Engsolve Ltd and its integration into the Group completed in June 2023. We will build on these further as the Company progresses.

I recognise that 2022 was a frustrating year for those wishing to see construction starting on a facility incorporating Powerhouse technology but believe that the steps taken in 2022 were essential and will lead to an even stronger Company in the future than would otherwise have been the case."

The annual report and accounts for the year ended 31 December 2022 will be sent to shareholders shortly and available to view on the Company's website: https://www.powerhouseenergy.co.uk

For more information, contact:

 
 Powerhouse Energy Group plc               powerhouse@tavistock.co.uk 
  Keith Riley 
 WH Ireland Limited (Nominated Adviser) 
  James Joyce 
  James Bavister 
  Enzo Aliaj                                     +44 (0) 207 220 1666 
 Turner Pope Investments (TPI) Ltd 
  (Joint Broker) 
  Andrew Thacker 
  James Pope                                     +44 (0) 203 657 0050 
 Tavistock (Financial PR)                  powerhouse@tavistock.co.uk 
  Simon Hudson 
  Nick Elwes 
  Heather Armstrong 
 

About Powerhouse Energy Group plc

Powerhouse Energy has developed a process technology which can utilise waste plastic, end-of-life-tyres, and other waste streams to convert them efficiently and economically into syngas from which valuable products such as chemical precursors, hydrogen, electricity, heat and other industrial products may be derived.

Powerhouse Energy's process produces low levels of safe residues and requires a small operating footprint, making it suitable for deployment at enterprise and community level.

Powerhouse Energy is quoted on the London Stock Exchange's AIM Market under the ticker: PHE and is incorporated in England and Wales.

For more information see www.powerhouseenergy.co.uk

CHAIRMAN'S STATEMENT

I was delighted to join the Board of Powerhouse Energy Group plc ("Powerhouse", PHE" or the "Company") as Non-Executive Chairman on 1 January this year and am pleased to be able to report positive steps forward during the short period of my tenure of office so far.

We have re-assessed where the business stands and is heading. We have re-examined and moved away from the business model of licensing our technology to third party developers for flat returns by way of fixed annual licence fees, a model that we felt was under-selling the real value of Powerhouse. The Company has now altered its strategy towards joint venture arrangements with project development partners, giving Powerhouse more say, and providing upside opportunity for our shareholders. The change of direction has been shown in our recent announcements on the projects at County Longford in Ireland, and at Konin in Poland. We were also very pleased that at the Protos site near Chester, once it became clear that our partner (originally the site owner and licensee of our technology) no longer shared our vision for the project's development, Powerhouse took full ownership and control on terms which included acceptable lease provisions for the site. In addition, we were delighted to announce that we have brought our engineering capability fully in-house, having now increased our ownership of Engsolve Limited ("Engsolve"), our engineering partner, to 100%. Engsolve was established and, until this most recent transaction majority owned, by Powerhouse COO Paul Emmitt (Powerhouse had acquired a 48% interest in Engsolve in 2021). Although the former arrangement worked well in practice, it was not necessarily the best platform from which to build the business that Powerhouse should be. The new arrangement simplifies the Company's access to its essential engineering requirements. The Board sees it as a step forwards in presenting Powerhouse to the market as a stand-alone business, with all the essential components in-house, thereby reducing reliance on third parties and ensuring maximum potential value for Powerhouse's shareholders.

In 2022, excellent progress continued on the Technology Centre in Bridgend, a vitally important part of our ability to demonstrate that Powerhouse intends to place itself at the forefront of businesses aspiring for a position in the waste-to-energy sector. Hydrogen fuel is only one part of the waste-to-energy picture. The Company has maintained a watchful eye on the market for hydrogen, particularly in relation to the publicity attracted by the use of hydrogen as a transport fuel. That market remains in its infancy and as such, we will continue to develop our capabilities in electricity and heat production, fuelled by raw materials (non-recyclable waste products with no use) that to others are a growing problem but which, to Powerhouse, are the keys to the door.

The Company has seen that progression by licensing our technology to third parties does not mean they will provide the significant funding required for the construction of each plant. The Company will continue to need to do that with a development partner, as we will do at Longford and Konin, or as in the case of the Protos site, where the Company expects to "go it alone". We are now exploring the right mix of equity and project finance, to be ready when the opportunity opens up so as to ensure the business can progress according to our strategy.

Post the year end the Board has been re-shaped, with four new non-executive appointments, including myself, bringing an undoubted range of additional skills and experience to provide a non-executive component to support the highly experienced executive team. As Chairman, my focus is on planning the pathway to financial sustainability, ensuring that we have the right skills and other resources within the Company, on the right terms, and that Powerhouse continues to develop and protect its intellectual property. I expect to see Powerhouse prove its viability in a commercial context whilst we develop our working relationships with third parties and maintain their confidence in order to deliver our projects economically.

I wish to thank my predecessor Keith Riley, who held the reins as Interim Non-Executive Chairman before moving to a new role as Acting CEO, leading the small but excellent Powerhouse executive team. They have made the induction process easy for the new non-executive board members. I would also like to thank our shareholders for their continued support over the last few challenging years. The year ahead promises to be an exciting one as we deliver on expectations and progress our vision for Powerhouse.

Antony Gardner-Hillman

Non-Executive Chairman

29 June 2023

CHIEF EXECUTIVE OFFICER'S REVIEW

The year under review was a challenging one for Powerhouse, but one that I believe will be ultimately rewarding. It was the year that started a change that the Board believe will move the Company towards its goal of trading profitably and being at the forefront of the waste-to-energy sector. 2021 had seen a change in chairmanship of the Board, and it was hoped that the appointment of a new Chief Executive Officer in January 2022, followed by a new Non-Executive Chairman three months later would bring stability. This was not to be the case, however, and on request of the Board, I stepped in as Interim Chairman in June, and then had to assume the dual role of Interim Chairman and Acting Chief Executive in August 2022.

My objective in joining the PHE board from the outset was to help progress the Company towards becoming a profitable enterprise. The first step to doing this was to put in place a Board that could both maintain the governance required for a company quoted on AIM, whilst contributing to the day-today running of the Company in a way that previous Boards had not. These changes were finally achieved with the Board appointments which occurred at the beginning of 2023, and I welcome what I see as a fresh start for the Company.

As with previous years from a financial perspective, the Company continued to sustain an overall loss in 2022. In 2021, the Company reported revenue of GBP701,435 which was derived from three main sources as described in the Strategic Report, one of which was services provided to the Protos project. During 2022, as a result of the construction contract tendering exercise on Protos I describe below, PHE's engineering activity diminished whilst waiting for the prospective contractors to prepare and return their bids. As a result, revenue reduced to GBP380,277 in the year - a reduction of 46%. This revenue in 2022 was made up of GBP38,984 of HUI exclusivity income and GBP341,293 of billings to Protos Plastics to Hydrogen No1 Ltd, Peel NRE's special purpose vehicle (SPV) for the Protos project.. It was also possible, however, to achieve a reduction in cost of sales from GBP599,914 in 2021 to GBP295,912 in 2022, lowering the impact on gross profit ahead of exceptionals which reduced from GBP101,521 in 2021 to GBP84,365 in 2022 - a reduction of 17%. In the event, however, following the acquisition of the Protos SPV on 28 April 2023, it has been decided to impair GBP341,293 of billings to the Protos SPV (Refer to note 29 in the financial statements). The added value of the work carried out by the Company billed to the SPV will, however, be recovered during 2023, as it remains an integral part of the project's development.

The major movements in the accounts for 2022 are the reduction in goodwill, the impairment of the loan made to the Protos SPV and the trade debt billed to the Protos SPV described above. All can be attributed to the Company changing its business strategy following the takeover of the Protos SPV and placing the Company on a realistic and solid basis from which it can grow. The Company has moved away from a twin reliance on technology licence sales (with dependence on a third party to develop the project to which the licence will apply), and granting of exclusive rights to third parties in selected territories. It was evident that this approach had led to a restriction on the activities PHE could undertake, and stagnation of the Company's development. In consequence, in 2022 the Company decided to become proactively involved in the development of its own facilities and began initially by entering into joint ventures with development partners. In the event, the joint venture with Peel was not realised and PHE acquired 100% shareholding in the Protos SPV, making it currently the sole developer of this project.

In 2021 the goodwill had been determined by considering a five year view on the development of a series of facilities that Peel was to develop progressively and the quantum determined by summating the incoming licence fees and performing a discounted cash flow to calculate the net present value. This was despite there being no contractual basis or obligation in place for the development of those projects. The goodwill value in 2022 was eroded marginally from that of 2021 due to the passage of time. It became apparent during 2022, however, that the rate of project development anticipated in previous years was optimistic and that due to limitations on resources and supply chain capacity, the realisation of these capital projects will be slower than anticipated. In consequence, the Board decided that the previous goodwill calculation could not be supported and the Company would write off the goodwill value in the 2022 accounts down to a realistic value in today's market. The previous goodwill evaluation of GBP42.96m is therefore reported as being impaired by GBP40.66m, along with GBP0.5m of exclusivity fees from Peel NRE `protos project', giving a total impairment of GBP41.16 million. There is no implication on the ongoing business of the Company by this reduction in balance sheet value, and the value added represented by the loan value by the SPV under Peel and the trade debt in the Protos project will be re-established in 2023.

As reported in a previous annual report, a Front-End Engineering Design ("FEED") had been carried out on the Powerhouse proprietary technology for converting plastics to hydrogen, trademarked DMG(TM).. This had been funded through a loan facility to the Protos SPV made available by PHE and underwritten by Peel NRE Ltd, the then project owners, in November 2021. In February 2022, this facility was extended until 31 August 2022, the view at the time being that financial close of the Protos Plastics to Hydrogen project could be achieved within that period. This facility was extended again in August 2022 to 31 March 2023 and then further extended to 29 April 2023.

Late 2022 saw a major change in the Peel project management team and the contracting strategy for construction of the Protos project. This led to an extensive tendering process during the spring and summer of 2022 whereby four pre-qualified, selected construction contractors were invited to tender for the construction, commissioning and setting to work of the Plastics to Hydrogen facility at Protos based on full specifications and a full form contract draft. This resulted ultimately in Petrofac being selected as preferred contractor, but what was consistent across all bidders was that the total installed cost of the development was significantly greater than had been estimated previously. Also consistent across the potential contractors was a requirement that further work was required on the FEED before prices could be finalised. Rather than the GBP20 million stated at time of the Dumbarton Dock planning permission, the tenders indicated the installed cost to be more than twice this. It became immediately apparent that the revenues that had been assumed from hydrogen sales and waste gate fees would not produce the return on investment required and Peel could not declare financial close within the timescale anticipated. In consequence, to allow the project development to continue, the various agreements between PHE and Peel had to be extended.

In May 2022, we announced the Global Technology and Information Centre, now known as the Powerhouse Technology Centre, which will be opened late 2023 in Bridgend, Wales. This indicates a strong commitment by the Company to invest in itself and its future development. Gasification as a means of treating large volumes of unprocessed waste has proved to have limitations and has even led to some developments being impaired. This has created a false impression that the technology "does not work" on wastes. This is not the case, and the true potential of converting waste materials into synthetic gas (or syngas) which can then be used to produce other products is still to be realised. The technology Powerhouse deploys is built on years of academic work and an original reference plant. The Company has performed several years of testing using the demonstrator unit at Thornton, and we have more recently used advanced computer techniques with Manchester University to improve the design further. We now even have a patent about to be granted on the temperature control of the kiln with several still pending. Nevertheless, there is still much we can do, and the Feedstock Testing Unit to be installed at Bridgend will be a scaled version of the commercial unit proposed for Protos and elsewhere, and will permit a much closer simulation of the commercial unit than its predecessor did. This will also enable the company to apply its technology to other feedstocks, simplify the gas processing system and optimise the outputs.

In June 2022, Peel announced that it had obtained planning permission at Dumbarton Dock, West Dunbartonshire, Scotland for a 13,500 tonnes per annum DMG(TM) unit. Unfortunately, this was short-lived as following the moratorium on incineration by Scottish Government, the permission was called in for examination by the Recorder in November 2022. It is my belief that the case for the plastics to hydrogen facility could have been made successfully and would have set a test case for these non-combustion waste conversion technologies, thereby making obtaining planning permission for future facilities that much easier. In the event Peel decided it would not contest the case and withdrew the planning permission.

It was evident to me from this and earlier events in late 2021/early 2022, that if PHE was to have a future, it had to have a level of involvement in projects incorporating its technology. Without this, the Company had no control on project decisions and was making statements on matters that were not of its making, nor had any ability to influence. To address this, it was agreed with Peel that PHE should acquire 50% of the shareholding in Protos Plastics to Hydrogen No1 Ltd, the SPV set up by Peel for development of the project. This was announced in September 2022, and documents were drawn up ready for signature, when following discussions in early 2023 on roles and further funding of the development activities, it was decided that the optimal way forward was for PHE to acquire the entire SPV and take over the project development, with Peel remaining as landlord of the site. This was completed on 28 April 2023 and all agreements between Peel and PHE were terminated.

As a result of this evolution during 2022, the Company used the first quarter of 2023 to develop its new business strategy. The main goal is to develop a portfolio of capital projects, but with a broadening of both the feedstock and product output beyond the narrow niche of plastics to hydrogen. Whilst plastic and hydrogen will remain an important business line for PHE, it relies heavily on the growth of demand for hydrogen. Demand is growing, but currently lags behind what is required to sustain the building of multiple PHE hydrogen from waste production facilities in the UK. The Board has every confidence this will change and by the end of this decade the use of hydrogen as a transport fuel will be common. PHE is in an excellent position to take advantage of this, but in the interim the Company must find alternative sources of revenue. The recent full integration of Engsolve into PHE provides this opportunity and in the Strategic Report we set out the role Engsolve will play.

Engsolve has provided engineering support to PHE for many years, with the Company holding 48% of the shareholding in since August 2021. The Company has now acquired the remaining stock. Engsolve will bring with it a history of successfully delivering engineering services to the energy, oil and gas, manufacturing, waste, and safety sectors. It is PHE's intention to build on this legacy, taking advantage of its specialist knowledge and the R&D capability emerging from the Powerhouse Technology Centre, to become a significant service provider. This will bring new revenue streams into the company and help build its reserves to support the capital projects.

Lastly, during 2022, PHE embarked upon building a pipeline of projects. This is still underway and results are only now beginning to emerge. Heads of terms were signed with Hydrogen Utopia International Plc ("HUI") in August 2022 for a project in Konin, Poland, but progress was severely delayed due to recent events in Eastern Europe. In March 2023, however, it was announced that a similar arrangement had been agreed with HUI on a project in Longford, Ireland. More recently, we have also announced an initiative in Ballymena, Northern Ireland. We will, however, continue to be cautious in building the pipeline. PHE must maintain focus on Protos, as with an implemented planning permission and engineering largely complete, at time of writing, this still remains PHE's fastest route to an installation - and focus must not be detracted from that. Furthermore, it is important that PHE does not enter into agreements it cannot properly service. The road to success in this market is through expertise and quality. If we deliver the quality the market demands, the quantity will follow, and the Board are confident that it will.

Keith Riley

Acting Chief Executive Officer

29 June 2023

STRATEGIC REPORT

This strategic report presents the Directors' opinion regarding the future direction of the Company and contains certain forward-looking statements. These statements are made by the Directors in good faith, based on the information available to them at the time of writing and such statements should be treated with caution as they address uncertainties.

During 2022 the Company received three sources of revenue:

   1.     GBP38,984 of HUI Exclusivity fees in relation to Konin, Greece & Portugal 

2. GBP341,293 of billings to Peel's Protos special purpose vehicle (SPV), Protos Plastics to Hydrogen No1 Ltd.

   3.     GBP60,326 arising from Engsolve profit share 

These sources of revenue were the only ones available to the Company in the year. No other source of revenue was available, as income from licencing of the DMG(TM) Technology could not and would not commence until project documentation for the construction of the project had been completed and the payment profile agreed. With the extant agreements in place, it was possible that no payment would be received until commencement of commercial operations of the facility.

Ahead of exceptional items, the Company made a gross profit in the year of GBP84,365, derived from revenue items 1 and 2 above. This compared to a gross profit in 2021 of GBP101,521. During 2022, due to the construction contract tendering exercise on Peel's Protos project, the Company's project related activities reduced pending prospective contractors preparing and returning bids. As a result, revenue reduced to GBP38,984 of exclusivity income and GBP341,293 of billings to the Protos SPV - a reduction of 46% from that in 2021. Due to a reduction in cost of sales from GBP599,914 in 2021 to GBP295,912 in 2022, gross profit was only reduced by 17%.

The sources of revenue stated above were the only ones available to the Company in 2022. No other source of revenue was available, as income from licencing of the DMG(TM) Technology could not, and would not commence until project documentation for the construction of the project had been completed and the payment profile agreed. With the agreements in place, it was possible that no payment would be received until commencement of commercial operations of the facility. The Company had no other means of generating revenue available to it.

Administration expenses for the year were GBP2,258,177, compared with GBP2,147,476 in 2022, due primarily to the additional costs incurred by changes to the Board of Directors. This gave an overall loss for the year ahead of exceptional items of GBP2,113,486, compared to GBP2,007,628 in 2021.

In 2021 the goodwill had been determined by considering a series of 30 facilities that Peel was to develop progressively over a period between 2022 and 2050, with the goodwill being a quantum determined by summating the incoming licence fees over a five-year period and performing a discounted cash flow to calculate the net present value. The goodwill value in 2022 is eroded from that of 2021 due to the passage of time, and the realisation that the incidence of projects over the period will be restricted to 5 in number. The basic model is the same. The previous goodwill evaluation of GBP42,960,000 is therefore reduced by GBP40,660,000 to GBP2,300,000. It has also been decided to impair the Peel NRE exclusivity fees of GBP500,000, the loan drawdown and interest accrual under the PHE loan facility to the Protos SPV of GBP2,159,274 along with the trade debtor owed to the Company by the Protos SPV of GBP1,183,686, giving a total balance sheet reduction of GBP44.5m.

There is no implication in this adjustment on the ongoing trading of the Company by this reduction in balance sheet value. Both expenditure under the loan and the owner engineer services provided by the Company to the Protos SPV contributed to the development of the project in terms of intellectual property and physical assets. These will be will be re-evaluated and consolidated during 2023 into a loan to Protos Plastics to Hydrogen No 1 Ltd by the Company as project development costs and in accordance with the business strategy described below.

The Vision and the Mission

The vision of Powerhouse is to be a leader in technology solutions that rid the world of and utilise non-recycled wastes producing sustainable energy whilst mitigating climate change impacts.

The Company's mission is to provide flexible, innovative, solutions to global pollution by converting such non-recycled wastes into valuable end-products, including low carbon energy. We will develop facilities to achieve this and when appropriate, will license third party developers to deliver similar facilities that reduce environmental impact. We will also use our expertise to assist others in their efforts to reduce climate change.

The Commercial Offering

The commercial offering of Powerhouse is to apply its expertise in engineering and project management to the development of facilities that can generate continuous profit streams for the Company. It specialises in low carbon energy production from waste materials but is able to apply its know-how and expertise to any application that reduces the impacts to the environment, both pollution and climate change.

The Company has developed as its core technology a rotating kiln that can process organic or fossil-based carbonaceous materials using pyrolysis and gasification. This produces a synthetic gas (or syngas) that can produce a range of products including:

Gaseous fuels

Liquid fuels

Electrical power

Heat

Chemical feedstocks

Char

Sources of Revenue

Until now, PHE has focused exclusively on the licencing of its proprietary technology for the production of hydrogen from plastics. The arrangement with Peel was based entirely upon a licencing model. This was seen as a low-cost, low-risk option. This model did, however, depend on third parties to develop the application for the technology, and PHE played little or no role in the project management. Unfortunately, it was also flawed because whilst multiple facilities deploying the registered trademark DMG technology were projected, there was little appreciation of the technical complexity involved and the inextricable link that is needed between the engineering and the management of the project development. Consequently, the supply chain's ability to deliver the equipment was over estimated. There was also a hidden risk that to sell any licence there is an inevitable requirement for warranties to be given and with a "hands-off' position within the project, the Company was not set up to deliver these. For the Company to sell further licences to less "friendly" clients than Peel, it was also necessary to have the reference of an operational plant.

In the third quarter of 2022, the decision was made that PHE must be able to control its own destiny and could no longer rely entirely on others to deliver facilities deploying its technology. As a consequence, the licence model was superseded by the Company taking a direct interest in such projects.

To develop an operating facility such as that proposed at Protos, it requires a construction and commissioning programme of at least 18 months. Specialist materials are required for some of the equipment due to the high operating temperatures and the propensity of hydrogen to embrittle steels and leak from even welded joints. This means that some of the equipment can only come from specialist manufacturers and the delivery periods are long due to supply chain issues. Prior to construction, it is necessary to obtain planning permission and the necessary environmental permits, so the typical project cycle time from conception to reality of a PHE plastics to hydrogen facility is around four years. With other configurations - for example, an electricity generation only facility - it can be a few months less, but not substantially shorter. Whatever the period of development, construction and setting to work, the Company earns no revenue during that period whatever business model is adopted and may not do so until the facility is generating sufficient profits.

To date, shareholder funds have financed the Company's working capital. If nothing else is put in place, this would remain the case until revenue was earned from an operating project. On top of this, the question must be addressed of how the capital project is to be financed.

Engsolve, being now fully integrated within the Powerhouse Group, brings with it a history of providing engineering services to third party clients. Although this income is modest at present, it can form a base on which the Company can build a revenue stream whilst the capital projects are developed. This will inevitably require recruitment of some new personnel and a deliberate drive to sell these services. Engsolve has an existing base and a successful track record. With positioning of the Company within its specialist areas, it will be possible to build the client base rapidly, producing income from engineering services to reduce the cash requirement from shareholder funds. This will also enable PHE to build its equity share in the capital projects.

Financing of the PHE Capital Projects

No extensive consideration had previously been given to the financing of facilities within the Company as it was to be done by others. The only action taken by the Company was to carry out a raise of GBP10 million (gross) through shareholder equity in August 2021. This funded the loan to Peel on Protos - hence the development on that site - and has provided the Company's working capital ever since.

The new strategy is for PHE to develop a portfolio of capital projects. By taking an equity interest in these projects, the eventual dividend flow will greatly exceed that which could be generated by licence fees. This will have a significant positive impact on the Company's value and will drive growth and increase overall returns on invested capital.

To achieve this, each project will be considered on its merits although the approach taken in their structure and financing may differ from project to project. In every case, a special purpose vehicle (SPV) will be formed, and the Company will develop the project to financial close. Ahead financial close, however, a decision will be taken on the approach taken by the Company at financial close, and this may be different for each project. For example, initially when the Company has limited equity, it may dilute its interest at financial close to become a minor shareholder in the SPV, or even sell the total shareholding in the project. The Company's income from the project will be a development fee that will be charged to equity partners entering the project (or for its sale) and a dividend pro rata with the shareholding. As the portfolio builds and cash position strengthens, the proportion of equity the Company maintains in the project can grow.

In each case a form of project finance is used, with minimal or no call on shareholders to invest directly in the SPVs unless they express a wish to do so.

Project Finance

Project finance is the funding of long-term infrastructure, using a limited or even non-recourse financial structure. Equity and debt are used to finance the project and are paid back from the cash flow generated by the project. This is effectively a loan structure that relies primarily on the project's cash flow for repayment, with the project's assets, rights, and interests held as secondary collateral.

The key to obtaining project finance is de-risking the technical risks and attention to detail in establishing the costs and revenue streams and the covenants of the third parties concerned. This is the stage that the Company is now at on Protos and will update the financial market when the appropriate arrangements have been completed.

Research & Development

The application of R&D has always been an important factor in PHE's development. This remains the case, and in 2022 the Company announced its intent to enhance this by establishing the Powerhouse Technology Centre at Bridgend. A purpose-designed Feedstock Testing Unit (FTU) is in manufacture and will be installed within the Centre during 2023. The FTU is a scaled version of the commercial Thermal Conversion Chamber (TCC) and will allow simulations of the commercial operating plant to be carried out under controlled conditions. It is anticipated that this will enable the Powerhouse Technology to be demonstrated in practice independent of building the commercial unit and hence give comfort to potential investors that the technical risk can be mitigated.

It is the director's firm belief that the use of thermal processes such as pyrolysis and gasification will grow in forthcoming years as lead chemical recycling develops and overtakes and possibly replaces for some materials physical recycling. Building the Company's expertise and knowledge in this field will allow the Company to be at the forefront of this transition. The ambition is for the Company to be the go-to company in the UK for these thermal treatments and associated materials behaviour, and for the Powerhouse Technology Centre to become a profit centre in its own right.

PRINCIPAL RISKS AND MITIGATIONS

The Board of Directors is responsible for ensuring that the risk register is maintained and updated. This ensures a reasonable, but not absolute, assurance that significant risks are mitigated and managed to an acceptable level.

The Executive Directors are responsible for establishing and maintaining the risk register on all capital projects. This identifies risks and assesses their potential impact using quantification techniques. Mitigations are then considered, and the residual risk identified.

Significant risks are those which if materialise will have material impact on the Company's long-term performance and delivery of its business strategy. These are summarised in the following table.

 
 Risk                    Description                      Mitigation 
 Operations              Greater than anticipated         All suppliers to be 
                          increases in global              pre-qualified for their 
                          pricing and pressures            relevant experience 
                          on supply chain adversely        and stability. 
                          impact financial viability 
                          of capital projects,             Regular review of supply 
                                                           chain and maintain competitive 
                          Supply chain manufacturing       tension. 
                          capacity is constrained 
                          and cannot meet required         General cost-side inflation 
                          delivery times.                  will be reflected in 
                                                           offtake price escalation. 
                          Longer development timescales 
                          than anticipated.                Contract security and 
                                                           performance requirements 
                          Key contractors/suppliers        to be included in all 
                          are unwilling to provide         major supplier contracts. 
                          required performance 
                          guarantees.                      In-house team to be 
                                                           strengthened with competent 
                                                           personnel, whilst also 
                                                           working with experienced 
                                                           partners - eg strategic 
                                                           framework agreement 
                                                           with Petrofac. 
                        -------------------------------  --------------------------------- 
 Technical Risk          Risk that the technical          Pyrolysis and gasification 
                          solution chosen does             are well established 
                          not perform to the standards     technologies widely 
                          anticipated.                     reported in the literature. 
 
                                                           Substantial testing 
                                                           of the feedstock conversion 
                                                           to syngas process has 
                                                           been carried out by 
                                                           PHE using the Demonstrator 
                                                           Unit at Thornton. 
 
                                                           PHE works with academia 
                                                           to deploy latest computer-aided 
                                                           tools. 
 
                                                           Independent due diligence 
                                                           on the process will 
                                                           be carried out prior 
                                                           to implementation. 
 
                                                           The new FTU to be installed 
                                                           at Bridgend will have 
                                                           the capability of simulating 
                                                           the commercial kiln 
                                                           to enable predictive 
                                                           testing to be performed. 
                        -------------------------------  --------------------------------- 
 Intellectual Property   Patent applications              Patents give PHE unique 
                          may not be granted.              control over its technology, 
                                                           but knowhow and expertise 
                          Maintaining patents              is considered to be 
                          is costly and cannot             more important and can 
                          cover the whole world.           mitigate against copying. 
                        -------------------------------  --------------------------------- 
 Government Policy       Drivers of demand for            Maintain presence and 
                          pollution reduction,             communicate with government 
                          recycling and climate            departments on Low Carbon 
                          change avoidance rely            Fuels Standards. 
                          on support from Government 
                          policy.                          Currently counterfactuals 
                                                           are not recognised within 
                          Policy supports for              UK policy. 
                          avoided CO2 emissions 
                          and counterfactuals 
                          is important to provide 
                          PHE with competitive 
                          advantage. 
                        -------------------------------  --------------------------------- 
 Competition             Competition may depress          The need to establish 
                          revenues or even act             capital projects acts 
                          as a barrier to PHE's            as a high barrier to 
                          entry to the market.             entry, which deters 
                                                           competition. PHE is 
                                                           not aware of any significant 
                                                           competitor within its 
                                                           business strategic area. 
 
                                                           Once access to land 
                                                           is established, competitive 
                                                           pressures lie with waste 
                                                           gate fees and offtake 
                                                           sales. PHE strategy 
                                                           now is to target waste 
                                                           streams that can command 
                                                           adequate gate fees and 
                                                           adapt offtakes to match 
                                                           market demand - hence 
                                                           the broadening of offering 
                                                           beyond plastics and 
                                                           hydrogen. 
                        -------------------------------  --------------------------------- 
 Funding of working      Cost of development              All capital projects 
  capital/cash flow       significantly above              are programmed budgeted 
                          ability of shareholder           and the spend controlled. 
                          equity to fund.                  Most of the development 
                                                           spend on Protos is already 
                          Cash position inadequate         expensed. 
                          to fund project development. 
                                                           Cash flow is managed 
                                                           and reviewed monthly. 
 
                                                           New business strategy 
                                                           of providing engineering 
                                                           services through Engsolve 
                                                           will improve cash flow. 
                        -------------------------------  --------------------------------- 
 Financing of capital    Shareholder equity cannot        Project finance approach 
  projects                finance capital projects.        to be followed. PHE 
                                                           will de-risk each element 
                          Cost of capital projects         required to achieve 
                          increase and depress             an investable project. 
                          IRR below investment 
                          level.                           Engineering design completed. 
                                                           Specifications available 
                                                           for plant & equipment 
                                                           to be contracted using 
                                                           model form contracts. 
 
                                                           Projects value engineered 
                                                           to minimise cost prior 
                                                           to design freeze. 
 
                                                           Capital costs to be 
                                                           fixed as early as possible. 
                                                           Currency risk to be 
                                                           hedged. 
                        -------------------------------  --------------------------------- 
 Feedstock supply        Feedstock unavailable            Quantified assessments 
  risk                    or only at negative              of available feedstock 
                          gate fees.                       have been carried out. 
 
                                                           PHE will target available 
                                                           feedstocks and seek 
                                                           long-term agreements 
                                                           for feedstock supply. 
                        -------------------------------  --------------------------------- 
 Offtake market          Offtake market at different      Expand the range of 
  risk                    price point than anticipated.    offtakers approached 
                                                           to provide competitive 
                          Lack of demand for offtake.      tension. 
 
                                                           Adapt the project to 
                                                           meet market demand. 
                        -------------------------------  --------------------------------- 
 Regulatory and          Regulations may change.          Projects designed to 
  Compliance Risk                                          meet existing regulations. 
                                                           Change in law provisions 
                                                           included in project 
                                                           contracts. 
                        -------------------------------  --------------------------------- 
 

Key Performance Indicators (KPIs)

Due to the nature of the Company's business strategy, which was essentially passive, relying on others to develop projects so that licences for the Company's technology could be sold, no KPI performance measuring system was in place. It is also of note that the number of employees of the Company as at 31 December 2022 was one.

Following the implementation of the strategy described above, the Company will adopt a range of metrics in the form of KPIs, which will be reported on periodically to measure performance. The implementation of the KPIs will be rolled out during 2023 and cover the following:

Financial measures :

-- Underlying profit & loss to measure the Company's profitability for the year attributable to equity shareholders of the Group. It will exclude exceptional items, remeasurements, timing and force majeur incidents from the calculation;

-- Company capital investment. The Company plans to invest in the development of its capital projects and will publish five-year plan from January 2023 to March 2028 across all areas of the Powerhouse Group.

   --    Research and Development spend.  This will measure expenditure invested in the development of decarbonisation of energy systems, and will provide a transparent view of the Company's compatibility with reduction in contamination, pollution and climate change mitigation. 

-- Return on capital employed (ROE). The Company will provide a target and forecast on the potential ROE of its capital investments to provide an indication of its performance in generating value for shareholders.

Non-Financial Measures

-- Contamination & Pollution Reduction. This is a projected measure of the reduction the Company's projects will have on reducing contamination and pollution by the waste products processed by the Company's capital projects and engineering services provided to others.

-- Climate change mitigation. This is a projected measure of the reduction the Company's projects and engineering services will have on reducing climate change impacts.

-- Stakeholder satisfaction. Customer and stakeholder satisfaction, will be measure with view to maintaining engagement with these groups and improving service levels.

-- Employee Engagement. The Company will measure how engaged our employees feel, based on the percentage of favourable responses to questions repeated annually in our employee engagement survey. The target will be to increase engagement compared with the previous year. A review of diversity within the workforce will also be carried out with view to increasing diversity as the workforce grows.

Statement of Directors' Duties to Stakeholders under s.172 Companies Act 2006

The Directors acted in in good faith throughout the year with view to promoting the long-term success of the Company for the benefit of its members as a whole, with due regard to stakeholders and the matters set out in section 172 of the Companies Act 2006.

The Board recognises its responsibilities to each of the Company's stakeholders and to society, and have endeavoured to ascertain the interests and views of its stakeholders and consider these when making decisions. The Board acknowledges its responsibility for setting and monitoring the culture, values and reputation of the Powerhouse Energy Group, and seeks to live by its values.

When making decisions, the Directors have regard to all stakeholders but acknowledge that not every decision will result in a preferred outcome for all. The Board strives to balance the different and competing priorities and interests of our stakeholders in a way compatible with the long-term, sustainable success of the business and which maintains a standard of business conduct aligned to our values and purpose.

The Directors are aware of their duty under section 172 of the Companies Act 2006 to act in the way which they consider, in good faith, would be most likely to promote the success of the Company for the benefit of its members as a whole. and, in doing so, to have regards (amongst other matters) to

   --      The likely consequences of any decision in the long term; 
   --      The interests of the Company's employees; 

-- The need to foster the Company's business relationships with suppliers, customers and others;

   --      The impact of the Company's operations on the community and the environment; 

-- The desirability of the Company maintaining a reputation for high standards of business conduct; and

   --      The need to act fairly between members of the Company. 

The Board recognises that the long-term success of the Company requires positive interaction with its stakeholders. Positive engagement with stakeholders will enable our stakeholders to better understand the activities, needs and challenges of the business and enable the Board to better understand and address relevant stakeholder views which will assist the Board in its decision making and to discharge its duties under Section 172 of the Companies Act 2006.

We reproduce here the Code of Conduct of the Company for easy reference which the directors believe meet the requirements of s172.

Company's Code of Conduct

   1.     Introduction 

This Powerhouse Energy Group (Powerhouse) Code of Conduct is a steering document that defines how the Company will act towards its employees, towards its clients, business partners, suppliers, competitors, and other organisations in all situations related to our business. The Code of Conduct is an integral part of the Company's Environmental, Social and Governance (ESG) Strategy and defines our corporate responsibility in society.

It is mandatory that this Code of Conduct is understood and complied with by all personnel working for the Company and its subsidiaries or on their behalf, including Representatives.

The Powerhouse Board of Management and CEO are ultimately responsible for the Code and its implementation. The Board will monitor its compliance through annual performance reviews, annual employee surveys and internal and external audits.

All Powerhouse officers, employees and those representing the Company represent the Company's brand and reputation through the solutions and value we create and our behaviour.

   2.     Our People 

Powerhouse will maintain a structured recruitment process with a structured performance appraisal and talent management process. We will create development opportunities and continuous learning for our employees. By encouraging a feedback culture and working with the insights from our employees, we increase their engagement.

It is the responsibility of each employee to look after their own personal and professional development, but at all times supported by the Company. Employees will be given equal opportunities for professional development both within their existing fields and in new areas.

The Company believes that diversity is an important asset within the company and in our relationships with clients and stakeholders. We promote equal rights and opportunities of employees in the workplace regardless of their gender identity, age, ethnicity, religion or other belief, disability, or sexual orientation.

   3.     Social Responsibility 

The company accepts continuing responsibility for its services to its clients and thereby to society. The company will permanently contribute to the benefit of its clients and society through sustained technological development and personnel training aimed at improving its performance.

Sustainability is a permanent goal in every project. The largest contribution to sustainability lies in the projects Powerhouse develops and has three facets:

   1.     Our projects must contribute to sustainable development; 
   2.     We will strive to increase the sustainability performance of our client's projects; and 
   3.     We will act sustainably in our own operations and performance. 

Powerhouse is committed to improve the lives of people and to respect human rights. We should always act in a socially and ethically responsible way, within the laws of the countries in which we operate. We support and respect human rights, as defined by the UN in the Universal Declaration of Human Rights.

   4.     Quality of Service 

The Company will only undertake project assignments in its areas of expertise where it has the capabilities to deliver efficient and effective service to its clients. We are committed to providing high quality services to clients and will focus on quality management as a working methodology and on permanent improvement as a means to improve that quality of service. It is our intent to be certified in Quality, Environment and Health & Safety in accordance with ISO 9001, ISO 14001 and ISO 45001 and we are committed to continuously improve our management system.

Health and safety is a top priority for the Company, with a zero-incident target. We are committed to eliminate hazards, reduce risk and ensure that health and safety information, instruction, training, and supervision is provided to all.

The Company is committed to the continual improvement of its knowledge base, abilities and tools in the area of its expertise. The company will focus on technology management as a working methodology and shall extend to its clients the benefits of its professional achievements.

   5.     Objectivity 

Powerhouse will be loyal to its clients and will maintain the confidentiality of any information from the client that is obtained in the process of performing services. The Company will also keep confidential the documents and reports prepared for the client.

The Company will avoid any conflict of interest and will inform a client beforehand of any potential conflict of interest that could emerged during the execution of its services.

The Company will only offer its services under contracting terms that do not interfere with its independence, integrity and objectivity.

Powerhouse will not accept any remuneration that could encourage the offering of a biased opinion.

   6.     Corporate integrity 

Powerhouse complies with all applicable laws, regulations, and other requirements applicable to operations in the countries where Powerhouse is active. This Code applies to all parts of the organisation, irrespective of where we are based, or where our projects are performed.

The Company will operate and compete in accordance with the legislation of each Territory and will not accept fraud, corruption, bribes, or unpermitted competition-restricting practices. We are committed to supporting international and local efforts to eliminate corruption and financial crime. We will not commit to activities that we cannot defend or account for, and we must not make decisions based on improper relationships or personal relationships. We also undertake to maintain correct and accurate accounting and reporting in accordance with the accounting rules in each Territory in which we operate.

The company will act at all times for the benefit of clients, and will carry out services with professional integrity, whilst not jeopardising the interest of society.

The promotional activity of the company and its services will uphold the dignity and reputation of the industry. Brochures and other formal documents describing resources, experience, work and reputation will reflect the Company's actual circumstances in a truthful manner.

The Company will manage with integrity its internal and external clients. It will focus on business integrity management as a working methodology.

We respect the privacy of individuals and recognise the importance of personal data entrusted to us by our employees, clients, and other parties. Confidential information received by Powerhouse from clients and other external parties must as a minimum be treated and protected in the same way as the Company's own confidential information. It is the responsibility of every employee and Representative to process and protect all personal data compliant with the applicable privacy legislation in a relevant and proper manner.

Employees and Representatives must report any violations of business ethics or human rights that arise in their course of work, even if the Company is not directly involved or party to it. In addition, employees should report incidents which could be a breach of business ethics and may remain anonymous if they so wish.

   7.     Communications 

Powerhouse employees are encouraged to communicate and share information but must at the same time ensure that the Powerhouse brand is strengthened and not weakened.

Our communications must always reflect, protect and develop the Company's position in the market as well as show that we are available to our stakeholders Every Powerhouse employee and Representative is an ambassador for the company. Communications must support the Company's business goals and profitable growth strategy while securing a cohesive brand identity in the market. All managers are responsible for ensuring that they and their employees comply with the guidance documents that apply for communication within and from Powerhouse.

As a company listed on the London AIM stock market we are obliged to communicate anything related to the Powerhouse business, financial condition, and results in line with the laws and rules that apply to listed companies. We report transactions correctly and in a true and fair way.

   8.     Competition 

The company will only solicit work and participate in private and public competitive tendering under a high standard of corporate ethics and competitive practices, and with total integrity in its transactions. The Company will not participate in prohibited anti-competitive activities, illegal price-fixing agreements, market sharing or abuse of dominant position.

The company favours quality-based selection for the contracting of services.

If solicited to review the work performed by another company, the company will act in accordance with its business integrity and objectivity policies.

The Company will not endorse compensation or contribution arrangements destined to influence or secure work no seek commissions from suppliers of equipment and services recommend it to the client as part of the company's services.

The Company will not take part in activities that could damage the reputation of it's business or the business of others.

Keith Riley

Acting Chief Executive Officer

2 9 June 2023

STATEMENT OF COMPREHENSIVE INCOME

For The Year Ended 31 December 2022

 
 
                                                  31 December    31 December 
                                          Note           2022           2021 
                                                          GBP            GBP 
 
Revenue                                    2          380,277        701,435 
 
Cost of sales                                       (295,912)      (599,914) 
                                                -------------  ------------- 
Gross Profit                                           84,365        101,521 
 
Administrative expenses                    4      (2,258,177)    (2,147,476) 
Acquisition costs                                           0       (11,735) 
Share of associate                         5           60,326         50,062 
 
Operating loss (pre exceptional items)            (2,113,486)    (2,007,628) 
Exceptional Items 
Exclusivity Impairment                     6        (500,000)              - 
Goodwill Impairment                        6     (40,660,000)              - 
Loan Impairment                            7      (2,159,274)              - 
Revenue Impairment                         7        (986,392)              - 
Operating Loss (post exceptional items)          (46,419,152)    (2,007,628) 
 
 
Net finance income/(cost)                  8           65,448         10,987 
 
Loss before taxation                             (46,353,704)    (1,996,641) 
 
Income tax credit                          9          155,025        126,145 
 
Total comprehensive loss                         (46,198,679)    (1,870,496) 
                                                -------------  ------------- 
 
Loss per share (pence)                     10          (1.17)         (0.05) 
Diluted loss per share (pence)             10          (1.17)         (0.05) 
 
 

All activities are in respect of continuing operations and there are no other items of comprehensive income.

The notes numbered 1 to 30 are an integral part of the financial information.

STATEMENT OF FINANCIAL POSITION

As At 31 December 2022

 
 
                                         Note          2022          2021 
                                                        GBP           GBP 
ASSETS 
Non-current assets 
Intangible fixed assets                   11      2,502,073    43,554,498 
Tangible fixed assets                     12          5,795        33,092 
Investments in subsidiary undertakings    13              1             1 
Investments in associated undertakings    13        187,638       140,540 
 
Total non-current assets                          2,695,507    43,728,131 
 
Current Assets 
Loans receivable                          14              0     1,165,286 
 
Trade and other receivables               15        403,247       963,648 
Corporation tax recoverable               16        166,318       155,227 
Cash and cash equivalents                 17      5,882,897     9,637,460 
                                               ------------  ------------ 
Total current assets                              6,452,462    11,921,621 
 
Total assets                                      9,147,969    55,649,752 
                                               ------------  ------------ 
 
LIABILITIES 
Current liabilities 
Creditors: amounts falling due within 
 one year                                 18      (279,306)     (563,781) 
Total current liabilities                         (279,306)     (563,781) 
Total assets less current liabilities             8,868,663    55,085,971 
Net assets                                        8,868,663    55,085,971 
                                               ------------  ------------ 
 
EQUITY 
Share capital                             21     22,900,856    22,900,856 
Share premium                             22     61,291,710    61,291,710 
Merger relief reserve                     22              0    36,117,711 
Accumulated deficit                       23   (75,323,903)  (65,224,306) 
Total surplus                                     8,868,663    55,085,971 
                                               ------------  ------------ 
 
 

The financial statements of Powerhouse Energy Group Plc, Company number 03934451, were approved by the Board of Directors and authorised for issue on 29 June 2023 and signed on its behalf by:

Keith Riley

Director

The notes numbered 1 to 30 are an integral part of the financial information.

STATEMENT OF CASHFLOWS

For The Year Ended 31 December 2022

 
 
                                                   Note          2022         2021 
                                                                  GBP          GBP 
Cash flows from operating activities 
Operating Loss                                           (46,419,152)  (2,007,628) 
Adjustments for: 
Share based payments                                         (18,629)       34,829 
Amortisation                                                   10,263        5,049 
Depreciation                                                   27,970       28,824 
Goodwill & Exclusivity impairment                          41,160,000            - 
Loan Impairment                                             2,077,600            - 
Share of associate result                                    (49,033)     (50,062) 
Provision against investments                                       0           49 
Loan Interest Charge                                           81,674            - 
Other none cash movements                                       3,006            - 
-Changes in working capital: 
Decrease/(Increase) in contract costs                               0       14,550 
Decrease/(Increase) in trade and other 
 receivables                                                  560,401    (763,338) 
Increase/(Decrease) in trade and other 
 payables                                                   (284,475)       55,015 
Tax credits received                                          166,318      118,927 
 
Net cash used in operations                               (2,684,057)  (2,563,785) 
                                                         ------------  ----------- 
 
Cash flows from investing activities 
Purchase of interest in associate                   13              0     (99,990) 
Loans advanced                                      14      (927,600)  (1,150,000) 
Purchase of intangible fixed assets                 11      (117,838)     (39,965) 
Purchase of tangible fixed assets                   12          (673)      (8,896) 
 
Net cash flows from investing activities                  (1,046,111)  (1,298,851) 
                                                         ------------  ----------- 
 
Cash flows from financing activities 
Proceeds from issue of shares                                       0   10,063,802 
Payments of principal under leases                 20.3      (23,455)     (23,882) 
Net finance costs                                   8           (940)      (4,299) 
 
Net cash flows from financing activities                     (24,395)   10,035,621 
                                                         ------------  ----------- 
 
Net increase/(decrease) in cash and cash equivalents      (3,754,563)    6,172,985 
 
Cash and cash equivalents at beginning 
 of year                                                    9,637,460    3,464,475 
 
Cash and cash equivalents at end of year                    5,882,897    9,637,460 
                                                         ------------  ----------- 
 
 

The notes numbered 1 to 30 are an integral part of the financial information.

STATEMENT OF CHANGES IN EQUITY

For The Year Ended 31 December 2022

 
                                                                            Merger 
                                    Ordinary    Deferred       Share        relief   Accumulated 
                               share capital      shares     premium       reserve       deficit         Total 
                                         GBP         GBP         GBP           GBP           GBP           GBP 
 
Balance at 1 January 2021         18,575,503   3,113,785  52,594,934    36,117,711  (63,544,097)    46,857,836 
Transactions with equity 
 parties: 
- Share issues on exercise 
 warrants                             24,477           -     174,603             -             -       199,080 
- Share issues to exercise 
 options                             278,000           -     253,982             -             -       531,982 
- Share issues in year               909,091           -   9,090,909             -             -    10,000,000 
Share based payments                       -           -           -             -       190,287       190,287 
Share issue costs                          -           -   (822,718)             -             -     (822,718) 
Reserve transfer- goodwill                 -           -           -             -             -             - 
 impairment 
Total comprehensive loss                   -           -           -             -   (1,870,496)   (1,870,496) 
Balance at 31 December 
 2021                             19,787,071   3,113,785  61,291,710    36,117,711  (65,224,306)    55,085,971 
 
Transactions with equity parties: 
- Share issues on exercise warrants                    -           -             -             -             - 
- Share issues to exercise                 -           -           -             -             -             - 
 options 
- Share issues in year                     -           -           -             -             -             - 
Share based payments                       -           -           -             -      (18,629)      (18,629) 
Reserve transfer - goodwill 
 impairment                                -           -           -  (36,117,711)    36,117,711             0 
Total comprehensive loss                   -           -           -             -  (46,198,679)  (46,198,679) 
Balance at 31 December 
 2022                             19,787,071   3,113,785  61,291,710             0  (75,323,903)     8,868,663 
                              ==============  ==========  ==========  ============  ============  ============ 
 
 

The following describes the nature and purpose of each reserve within equity:

Deferred shares: Represents the combined total of all deferred shares (0.5p, 4p and 4.5p)

   Share premium:                  Amount subscribed for share capital in excess of nominal value 

Merger relief reserve: Amount subscribed for share capital in excess of nominal value where merger relief applies (Note 1.1)

Accumulated deficit: Accumulated deficit represents the cumulative losses of the company and all other net gains and losses and transactions with shareholders not recognised elsewhere

The notes 1 to 30 are an integral part of the financial information.

NOTES TO THE ACCOUNTS

For The Year Ended 31 December 2022

   1.   accounting policies 

Powerhouse Energy Group Plc is a company incorporated in England and Wales. The Company is a public limited company quoted on the AIM market of the London Stock Exchange. The address of the registered office is 15 Victoria Mews, Mill Field Road, Cottingley Business Park, Bingley BD16 1PY. The principal activity of the Company is to continue the development of its technology and to support its customers in order to achieve its full commercial roll-out. The following accounting policies have been applied consistently in dealing with items which are considered material in relation to the financial information.

1.1. Basis of preparation

This financial information is for the year ended 31 December 2022 and has been prepared in accordance with International Financial Reporting Standards ("IFRS") issued by the International Accounting Standards Board (IASB), as adopted for use in the United Kingdom (UK) and with those parts of the Companies Act 2006 applicable to companies reporting under IFRS (except as otherwise stated). These accounting policies and methods of computation are consistent with the prior year, unless otherwise stated.

The Company's only UK subsidiaries are non-trading and not material. There are also long-term restrictions on the operations of the Company's subsidiaries in the US and Switzerland. With these restrictions in place, the Company is also unable to exert control over the subsidiaries. As such the Company has claimed exemptions applicable to it under Companies Act section 405 (2) and 405 (3b) and IFRS 10 to not present any Consolidated financial statements for the year ended 31 December 2022. Investments in subsidiaries that are not consolidated are carried at cost less any provision for impairment.

The acquisition of Waste2Tricity Limited during 2020 was transacted by way of a share for share exchange and qualifies for merger relief, meaning that no share premium is recorded on the issue of the consideration shares. The excess of the fair value of consideration shares over their nominal value has been recorded in a merger relief reserve.

Associates are entities which the Company has significant influence but not control or joint control as defined under IAS 28. This is generally the case where the Company holds between 20% and 50% of the voting rights. Investments in associates are accounted for using the equity method of accounting.

Under the equity method of accounting, investments are initially recognised at cost and adjusted thereafter to recognise the Company's share of the post-acquisition profits or losses of the investee in the Income statement. Dividends received or receivable from associates and joint ventures are recognised as a reduction in the carrying value of the investment.

When the Company's share of losses in an equity-accounted investment exceeds or equals its interest in the equity, the Company does not recognise further losses, unless it has incurred obligations or made payments on behalf of the other entity. Unrealised gains on transactions between the Company and its associates and joint ventures are eliminated to the extent of the Company's interest in these entities. Unrealised losses are also eliminated unless the transaction provides evidence of an impairment in the asset transferred.

Accounting policies of the equity accounted investees are changed where necessary to ensure consistency with the policies adopted by the Company. The carrying value of equity accounted investments is tested for impairment in accordance with the policy described in Note 1.18 (ii).

As of 31(st) December 2022 the Company has one associate, Engsolve Limited, the interest in which was acquired during 2021.

Other investments, which are not publicly traded, are initially measured at cost and subsequently measured at cost less accumulated losses.

1.2. Judgements and estimates

The preparation of financial statements in conformity with IFRS requires management to make judgements, estimates and assumptions that affect the application of policies and reported amounts in the financial statements.

Areas involving a higher degree of judgements or complexity, or areas where assumptions or estimates are significant to the financial statements such as the exercise to assess the fair value of goodwill, share based payments (share options and warrants) and going concern are disclosed within the relevant notes.

1.3. Going concern

The financial statements have been prepared on a Going Concern basis. The Directors' views are based upon working capital projections which take into account the intended use of the funds in hand over the next 12 months.

At 31st December 2022 the company was still pursuing a business strategy of selling licences for use of its technology to Peel Group on a series of projects to be constructed on sites within Peel's ownership and Peel's control. In prior years, Goodwill had been calculated using a discounted cash flow calculation od licence fees arising from 10 prospective projects to be developed by Peel over a ten-year period. As at 31st December 2022, Peel had two projects under development - Protos in Cheshire and Rothsay Dock in Clydebank - with others still in prospect, but it had become evident that due to availability of resources and limitations in the supply chain, no more than five projects would be constructed within a 10 year view. The Goodwill valuation is, therefore calculated on this basis, resulting in a reduction of Goodwill from 42.69m in 2021 to 2.3m at the end of this reporting period, and it is the view of the directors that this is a fair valuation at this time .

Towards the end of 2022, thinking on the licencing business strategy was changing and discussions were underway with Peel with view to the Company acquiring a 50% ownership of Protos Plastics to Hydrogen No1, the special purpose vehicle (SPV) set up by Peel to finance and develop the project at Protos. This change in business strategy is described in the Strategic Report section of this Annual Report and crystallised post-reporting period in May 2023, when the company acquired 100% of the SPV shareholding. It also entered into a 50/50 joint venture with Hydrogen Utopia International for a project to be developed at Longford, Republic of Ireland and is developing a further prospect for a wholly owned project in Ballymena, Northern Ireland.

In looking forward to determine the Going Concern status, the business planning of the Company post the current reporting period, is based on the following:

-- The acquisition of Engsolve Ltd (announced June 2023) giving the Company the ability to earn revenues from engineering services. Engsolve had an existing client base, a history of providing such services and was integrated into the Company Group with an existing bank balance. This provides an immediate and ongoing revenue stream to the Company, extending its positive cash position;

-- The development of a series of capital projects addressing contamination, pollution and climate change mitigation and deploying where possible, but not exclusively, the Company's proprietary technology. These projects will be developed to a point where the construction and future operation of the project can be financed using combinations of equity and debt.

Adopting this approach:

   --      The Company will have an ongoing revenue stream; 

-- Investment in the development of the capital projects will be via shareholder loans to the SPV, repayable at financial close;

-- In the event development of the project does not look viable (for example, failing to obtain the necessary permissions), expenditure will be curtailed and a replacement project identified;

-- As the project approaches financial close and viability is established, equity partners will be sought to take shareholder equity in the SPV and the project financed by a mix of equity and debt to be determined or the Company's entire shareholding in the SPV sold.

The directors consider therefore that other than fixed costs, the cash spend looking forward can be managed. Within the 13-month cashflow projection (June 2023 - June 2024) GBP740k is discretionary and can be adjusted or even stopped. Large capital expenditure can also be avoided until the Company is in a position make to such investments. The Cashflow also includes the net costs of acquisition of Engsolve of GBP107k and annual spend of GBP475k. It is anticipated that Engsolve revenues over the period will exceed these values.

A cash inflow of GBP1.2m is also anticipated following asset financing of the Feedstock Testing Unit and associated equipment to be installed in the Powerhouse Technology Centre at Bridgend later in 2023, offsetting this capital purchase. The Company has received two initial offers of asset finance for the New Test Unit. In the unlikely event the Company does not receive the asset finance it will need to reduce expenditure on capital projects, offset by income from Engsolve activities.

It is of note that the loan made to the Protos SPV of GBP2.16m was expended on engineering and project management, the value of which has been preserved in the SPV and now under control of the Company. This loan will be recovered along with the GBP1.18m Protos debt at financial close of the Protos project. In consequence, this balances of GBP3.34m is not included in the Going Concern evaluation, and in the directors' opinion does not materially impact their opinion regarding Going Concern. The loan and debtor will be provided for at the end of Dec 22 and will be fully impaired. Should the Protos project proceed the provision for the loan and debtor will be reversed and then fully recovered from the Protos SPV.

1.4. Foreign currency translation

The financial information is presented in sterling which is the Company's functional currency.

Foreign currency transactions are translated into the functional currency using the exchange rates prevailing at the dates of the transactions. Monetary assets and liabilities denominated in foreign currencies are revalued to the exchange rate at date of settlement or at reporting dates (as appropriate). Exchange gains and losses resulting from such revaluations are recognised in the Statement of Comprehensive Income.

Foreign exchange gains and losses are presented in the Statement of Comprehensive Income within administrative expenses.

1.5. Revenue

   (i)   Engineering services 

The Company has provided engineering services for the application of its technology, the intellectual property which the Company owns. Revenue from providing services is recognised in the accounting period in which services are rendered. For fixed-price contracts, revenue is recognised based on the actual service provided to the end of the reporting period as a proportion of the total services to be provided to the extent to which the customer receives the benefits. This is determined based on the actual labour hours spent relative to the total expected labour hours.

Where contracts include multiple performance obligations as specified by the work scope, the transaction price will be allocated to each performance obligation based on estimated expected cost-plus margin.

Estimates of revenues, costs or extent of progress toward completion of services are revised if circumstances change. Any resulting increases or decreases in estimated revenues or costs are reflected in profit or loss in the period in which the circumstances that give rise to the revision become known by management.

In case of fixed-price contracts, the customer pays the fixed amount based on a payment schedule. If the services rendered by the Company exceed the payment, a contract asset is recognised. If the payments exceed the services rendered, a contract liability is recognised.

If a contract includes an hourly fee, revenue is recognised in the amount to which the Company has a right to invoice.

(ii) Exclusivity fees

Where the Company grants a developer exclusive rights to utilise its technology in a particular territory for an exclusivity fee, the fee is recognised in the income statement over the agreed exclusivity period.

1.6. Leases

For any new contracts entered into, the Company considers whether a contract is, or contains, a lease. A lease is defined as 'a contract, or part of a contract, that conveys the right to use an asset for a period of time in exchange for consideration'. To apply this definition the Company assesses whether the contract meets three key evaluations which are whether:

(i) the contract contains an identified asset which is either explicitly defined in the contract or implicitly specified by being identified at the time the asset is made available to the Company;

(ii) the Company has the right to obtain substantially all of the economic benefits from use of the asset throughout the period of use, considering its rights within the defined scope of the contract;

(iii) the Company has the right to direct the use of the identified asset throughout the period of use.

Where the above evaluations are met, at lease commencement date, the Company recognizes a right of use asset and a lease liability on the balance sheet. The right of use asset is measured at cost, which is made up of the measurement of the initial lease liability, any direct initial costs incurred by the Company, an estimate of any costs to dismantle and remove the asset at the end of the lease, and any lease payments made in advance of the lease commencement date.

The Company depreciates right of use assets on a straight-line basis from the lease commencement date to the earlier of the end of the useful life of the right of use asset or the end of the lease term. The Company assesses the right of use asset for impairment when such indicators exist.

At the commencement date the Company measured the lease liability at the present value of the lease payments unpaid at that date, discounted using the interest rate implicit in the lease if that rate is readily available or the Company's incremental borrowing rate. For the assessment of the lease entered into in 2020 the Company applied a rate of 7.5%.

Subsequent to initial measurement the liability will be reduced for payments and increased for interest. It is remeasured to reflect any reassessment or modification or is there are any changes to the repayment schedule.

1.7. Finance income and expenses

   (i)   Income 

Interest income is calculated by applying the effective interest rate to the gross carrying amount of a financial asset except for financial assets that subsequently become credit impaired. For credit impaired financial assets, the effective interest rate is applied to the net carrying amount of the financial asset (after deduction of the loss allowance).

(ii) Expense

The effective interest method is a method of calculating the amortised cost of a financial liability and of allocating interest expense over the relevant period. The effective interest rate is the rate that exactly discounts estimated future cash payments through the expected life of the financial liability, or, where appropriate, a shorter period, to the net carrying amount on initial recognition.

1.8. Income tax expense

The tax expense for the period comprises current and deferred tax.

UK corporation tax is provided at amounts expected to be paid (or recovered) using the tax rates and laws that have been enacted or substantively enacted by the balance sheet date.

Deferred tax is recognised in respect of all temporary differences that have originated but not reversed at the balance sheet date where transactions or events that result in an obligation to pay more tax in the future or a right to pay less tax in the future have occurred at the balance sheet date. Temporary differences are differences between the Company's taxable profits and its results as stated in the financial statements that arise from the inclusion of gains and losses in tax assessments in periods different from those in which they are recognised in the financial statements.

A net deferred tax asset is regarded as recoverable and therefore recognised only to the extent that, on the basis of all available evidence, it can be regarded as more likely than not that there will be suitable taxable profits from which the future reversal of the underlying temporary differences can be deducted.

Deferred tax is measured at the average tax rates that are expected to apply in the periods in which the temporary differences are expected to reverse, based on tax rates and laws that have been enacted or substantively enacted by the balance sheet date. Deferred tax is measured on a non-discounted basis.

1.9. Property, plant and equipment

Property, plant and equipment is stated at cost less accumulated depreciation. Cost represents the cost of acquisition or construction, including the direct cost of financing the acquisition or construction until the asset comes into use.

Depreciation on property, plant and equipment is provided to allocate the cost less the residual value by equal instalments over their estimated useful economic lives of 3 years, once the asset is complete.

The expected useful lives and residual values of property, plant and equipment are reviewed on an annual basis and, if necessary, changes in useful life or residual value are accounted for prospectively.

   1.10.   Intangible assets 

Goodwill represents the future economic benefits arising from a business combination that are not individually identified and separately recognised. Goodwill is carried at cost less accumulated impairment losses. Refer to note 1.18 for impairment testing procedures. Goodwill impairment losses are not reversible as explained in note 1.18 (iii).

Exclusivity rights acquired in a business combination that qualify for separate recognition are recognised as intangible assets at their fair value and subsequently assessed for impairment loss.

Costs associated with patent applications are capitalised in the year of spend and amortised over their estimated useful lives of 20 years on a straight-line basis commencing from the date of patent application. Any cost associated with the upkeep of a patent is amortised over the remaining useful life of that patent.

An internally generated intangible asset arising from development is only recognised where all of the following have been demonstrated: (i) the technical feasibility of completing the asset; (ii) the intention to complete the asset and the ability to use or sell it; (iii) the availability of resources to complete the asset; and (iv) the ability to reliably measure the cost attributable to the asset during its development.

Research and development

In all other instances research and development expenditure is recognised as an expense as incurred. Development costs previously recognised as an expense are not recognised as an asset in a subsequent period.

   1.11.   Other non-current assets 

Other non-current assets represent investments in subsidiaries. The investments are carried at cost less accumulated impairment. Cost was determined using the fair value of shares issued to acquire the investment.

Financial assets

The Company classifies financial assets as loans and receivables within current assets, except for maturities greater than 12 months after the balance sheet date. These are classified as noncurrent assets. Assets are initially recognised at fair value plus transaction costs. Loans and receivables are subsequently carried at amortised cost using the effective interest rate method.

   1.12.   Contract costs 

The Company recognises costs incurred in fulfilling contracts with customers that are directly associated with the contract as an asset if those costs are expected to be recoverable. Contract costs are amortised on a basis consistent with the transfer of goods and services to which the asset relates.

   1.13.   Trade and other receivables 

Trade receivables are initially recognised at fair value. Subsequently they are carried at amortised cost less any provision for impairment.

   1.14.   Cash and cash equivalents 

Cash and cash equivalents comprise cash balances and call deposits and are recognised and subsequently carried at fair value. For the purpose of presentation in the statement of cashflows, cash and cash equivalents include cash on hand, deposits held at call with financial institutions, other short term, highly liquid investments with original maturities of three months or less that are readily convertible to known amounts of cash and which are subject to an insignificant risk of changes in value, and bank overdrafts. Bank overdrafts are shown within borrowings in current liabilities in the balance sheet.

   1.15.   Trade and other payables 

Trade payables are obligations to pay for goods or services that have been acquired in the ordinary course of business from suppliers. Trade and other payables are recognised initially at fair value and subsequently measured at amortised cost using the effective interest method.

   1.16.   Financial assets and liabilities 
   i)    Financial assets 

Loans receivable, where forward receivables comprise solely of payments of principal and interest, are measured at amortised cost. Interest income from these financial assets is included in finance income using the effective interest rate method.

   ii)   Financial liabilities 

Loans payable are financial obligations arising from funding received and used to support the operational costs of the Company. These are initially recognised at fair value. Loans are subsequently carried at amortised cost using the effective interest method.

   1.17.   Adoption of new and revised standards 
   i)    New and amended standards adopted by the Company 

New and amended standards for the current period and effective from 1 January 2022 have been applied by the Company, including:

Covid-19 Related Rent Concessions (Amendment to IFRS 16)

Interest Rate Benchmark Reform - Phase 2 (Amendments to IFRS 9, IAS 39 and IFRS 7)

Business Combinations (Amendments to IFRS 3

Onerous Contracts - cost of fulfilling a contract (Amendment to IAS 37)

Annual Improvement to IFRS Standards (Amends 4 IFRS standards)

Property Plant & Equipment - Proceeds before intended use Amendment to IAS 16

There are no transition adjustments relating to the adoption of these standards.

   ii)   Standards issued but not yet effective 

Certain new accounting standards and interpretations have been published that are not mandatory for 31 December 2022 reporting periods and have not been adopted early by the Company. These standards are not expected to have a material impact on the entity in the current or future reporting periods and on foreseeable future transactions.

   1.18.   Impairment 
   (i)   Goodwill 

Goodwill and intangible assets that have an indefinite useful life are not subject to amortisation and are tested annually for impairment, or more frequently if events or changes in circumstances indicate that they might be impaired.

(ii) Other assets

At each balance sheet date, the carrying amounts of assets are reviewed to determine whether there is any indication that those assets have suffered an impairment loss. An impairment loss is recognised whenever the carrying amount of an asset or its cash generating unit exceeds its recoverable amount. Impairment losses recognised in respect of cash generating units are allocated first to reduce the carrying amount of any goodwill allocated to cash generating units and then to reduce the carrying amount of the other assets in the unit on a pro-rata basis. A cash generating unit is the group of assets identified on acquisition that generate cash inflows that are largely independent of the cash inflows from other assets or groups of assets. The recoverable amount of assets or cash generating units is the greater of their fair value less costs to sell and value in use. In assessing value in use, the estimated future cash flows are discounted to their present value using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to the asset. For an asset that does not generate largely independent cash inflows, the recoverable amount is determined for the cash generating unit to which the asset belongs.

(iii) Reversals of impairments

An impairment loss in respect of goodwill is not reversed. In respect of other assets, an impairment loss is reversed if there has been a change in the estimates used to determine the recoverable amount.

An impairment loss is reversed only to the extent that the asset's carrying amount does not exceed the carrying amount that would have been determined, net of depreciation or amortisation, if no impairment loss had been recognised.

   1.19.   Share based payments 

Share based payments are made to employees and third parties and all are equity settled.

(i) Third party provision of services

   a)              Via issue of shares 

Contractors receive remuneration in the form of share-based payments, whereby services are provided and settled by the issue of shares. The cost of equity settled transactions is determined at the fair value of the services provided, based upon invoiced amounts or formal agreements in place with suppliers.

   b)      Via issues of share warrants 

The Company also issues share warrants to third parties in relation to services provided by suppliers. The cost of equity settled transactions is determined at the fair value of the services provided, based upon invoiced amounts or formal agreements in place with suppliers. Where no fair value of services can be directly obtained, the fair value at the grant date is determined using the Black and Scholes valuation model. At each reporting date the Company revises its estimates of the number of options that are likely to be exercised with any adjustment recognised in the income statement.

(ii) Directors and employees

   c)       Via issues of share options 

The Company has issued share options to Directors and employees through approved and unapproved option plans. The fair value of options issued is determined at the date of grant and is recognised as an expense in the Income Statement. The fair value at the grant date is determined using the Black and Scholes valuation model. At each reporting date the Company revises its estimates of the number of options that are likely to be exercised with any adjustment recognised in the income statement.

Where share-based payments give rise to the issue of new share capital, the proceeds received by the Company are credited to share capital and share premium when the share entitlements are exercised.

   1.20.   Employee benefits 

Liabilities for wages and salaries, including non-monetary benefits, annual leave and accumulating sick leave that are expected to be settled wholly within 12 months after the end of the period in which the employees render the related service are recognised in respect of employees' services up to the end of the reporting period and are measured at the amounts expected to be paid when the liabilities are settled. The liabilities are included within creditors in the balance sheet.

For defined contribution pension plans, the company pays contributions to publicly or private administered pension insurance plans on a mandatory, contractual or voluntary basis. The Company has no further payment obligations once the contributions have been paid. The contributions are recognised as employee benefit expense when they are due. Prepaid contributions are recognized as an asset to the extent that a cash refund or a reduction in the future payments is available.

The Company does not contribute to any defined benefit pension plans.

   1.21.   Segmental reporting 

An operating segment is a component of the Company:

-- that engages in business activities from which it may earn revenues and incur expenses (including revenues and expenses relating to transactions with other components of the Company);

-- whose operating results are reviewed regularly by the Company's chief decision maker to make decisions about resources to be allocated to the segment and assess its performance; and

   --    for which discrete financial information is available. 

The Company considers it has one business segment, being a UK based development company intending to license its technology to projects in the UK and internationally.

   2.      Revenue 
 
                                            2022       2021 
                                             GBP        GBP 
  Engineering and related services       341,293    628,859 
  Exclusivity fees                        38,984     71,829 
  Other                                        -        747 
                                       ---------  --------- 
                                         380,277    701,435 
                                       =========  ========= 
 

During the year, the Company billed for engineering work carried out on projects. All revenue generated has arisen in the UK.

   3.      Employee costs 
 
                                 2022       2021 
                                  GBP        GBP 
  Directors' fees             581,072    274,575 
  Wages and salaries          174,769    178,710 
  Social security costs        75,609     48,835 
  Pensions                     16,817      3,960 
 
                              848,267    506,080 
                            =========  ========= 
 

Highest Paid Director - refer to note 27

The number of average monthly employees (including Directors) are as follows:

 
                   2022    2021 
  Management          6       7 
  Operations          3       3 
                 ------  ------ 
  Total               9      10 
                 ------  ------ 
 

The total number of employees as at 31 December 2022 (including Directors) was 4 (2021: 9) comprising 3 in management and 1 in operations (2020: 5 in management, 4 in operations). All Directors are classed as management.

   4.      Administrative expenses 
 
  Included in administrative expenses are:                            2022     2021 
                                                                       GBP      GBP 
 
 
  Research and development costs                                   431,185  585,195 
  Amortisation                                                      10,263    5,049 
  Depreciation                                                       5,397    4,199 
  Depreciation - right of use asset                                 22,573   24,625 
  Share based payments                                            (18,629)   34,829 
  Foreign exchange (gains)/losses                                      162    (429) 
  Auditor's remuneration for audit services: 
  Fees payable to the Company's auditor for 
   the audit of the Company's annual financial 
   statements                                                       31,000      25,000 
  Fees payable to the Company's auditor and 
   their associates for other services:                              1,500       1,000 
            Non-audit fees paid to auditors 
             R & D Taxation advisory and compliance services        12,000      10,000 
                                                                  ========  ========== 
 
 
 
   5.      Share of associate 
 
                           2022      2020 
                            GBP       GBP 
 
  Share of profits       60,326    50,062 
                       --------  -------- 
                         60,326    50,062 
                       ========  ======== 
 

The Company acquired a 48.39% stake in Engsolve on 12 August 2021 as explained in note 13. The above result represents the Company's share of the associate's profits arising since acquisition. The Company's share of the associate's tax is included in the tax charge (see note 9).

   6.      Goodwill & Exclusivity impairment 
 
                                     2022  2021 
                                      GBP   GBP 
 
 Goodwill Impairment           40,660,000     - 
  Exclusivity impairment          500,000     - 
                             ------------  ---- 
                               41,160,000     - 
                             ============  ==== 
 

In 2020, Goodwill of GBP57,152,699 was recognised on the acquisition and hive up of Waste2tricity Limited. An independent fair value assessment is commissioned by the Directors on the carrying value at each balance sheet date as explained in note 11. Impairments are made based upon the results of those assessments plus input from the Board. Refer to CEO Report

   7.     Loan & Revenue impairment 
 
                                2022  2021 
                                 GBP   GBP 
 
 Loan Impairment           2,159,274 
  Revenue impairment         986,392     - 
                         -----------  ---- 
                           3,145,666     - 
                         ===========  ==== 
 

Further description on the impairment of the Loan impairment ("loan debtor") and Revenue impairment ("trade debtor") is disclosed in Note 14.

In 2020, Exclusivity of GBP500,000 was recognised on the acquisition and hive up of Waste2tricity Limited. An independent fair value assessment is commissioned by the Directors on the carrying value at each balance sheet date as explained in note 11. Impairments are made based upon the results of those assessments.

   8.      Net finance income/(cost) 
 
                                        2022      2021 
                                         GBP       GBP 
 
  Loan interest receivable            66,388    15,286 
  Other interest receivable              251        47 
  Bank and other interest payable    (1,191)   (4,346) 
                                     -------  -------- 
                                      65,448  (10,987) 
                                     =======  ======== 
 
   9.      Income tax and deferred tax 

As the Company incurred a loss, no current tax is payable (2021: GBPnil). In addition, as there is no certainty about future profits from which accumulated tax losses could be utilised, accordingly no deferred tax asset has been recognised. The Company submitted a claim for research and development tax credits during the year amounting to GBP166,318 (2021: GBP135,657) which has been recognised in the accounts. Accumulated tax losses amount to an estimated GBP22.0 million (2021: GBP17.0 million) and reflect tax losses submitted in tax returns and arising during the period less any relief taken for research and development credits. The tax credit rate is lower (2021: lower) than the standard rate of tax. Differences are explained below.

 
 Current tax                                               2022       2021 
                                                            GBP        GBP 
 Loss before taxation                                46,353,704  1,996,641 
                                                    -----------  --------- 
 Tax credit at standard UK corporation tax 
  rate of 19% (2019: 19%)                             8,807,204    379,362 
 Effects of: 
 Goodwill impairment not deductible for tax 
  purposes                                          (7,820,400)          - 
 Expenses not deductible for tax purposes                 2,429    (9,837) 
 Allowable deduction on exercise of share options             -    445,750 
 Research and development tax credits claimed           166,318    135,657 
 Deferred tax asset not recognised                  (1,000,526)  (824,787) 
                                                    -----------  --------- 
 
 Income tax credit                                      155,025    126,145 
                                                    ===========  ========= 
 
   10.    Loss per share 
 
                                                 2022           2021 
 
  Total comprehensive loss (GBP)         (46,198,679)    (1,870,496) 
 
  Weighted average number of shares     3,957,414,135      3,918,497 
 
  Loss per share in pence                      (1.17)         (0.05) 
  Diluted loss per share in pence              (1.17)         (0.05) 
 

For the year ended 31 December 2022, 3,581,355 of the options in issue and 381,100,979 of the warrants in issue were excluded from the diluted loss per share calculation due to being anti-dilutive.

For the year ended 31 December 2021, 1,062,692 of the options in issue and 9,090,910 of the warrants in issue were excluded from the diluted loss per share calculation due to being anti-dilutive.

There have been no shares issued in the financial year or since the year end.

   11.    Intangible fixed assets 
 
                                 Goodwill          Exclusivity          Patent            Total 
                                                        rights           costs 
                                      GBP                  GBP             GBP              GBP 
 Cost 
 At 1 January 2021             57,152,699              500,000          61,752       57,714,451 
 Additions - hive up of                 -                    -               -                - 
  W2T 
 Additions                              -                    -          39,965           39,965 
                             ------------  -------------------  --------------  --------------- 
 At 31 December 2021           57,152,699              500,000         101,717       57,754,416 
                             ------------  -------------------  --------------  --------------- 
 
 Accumulated amortisation 
  & impairment 
 At 1 January 2021             14,192,699                    -           2,170       14,194,869 
 Amortisation charge for 
  the year                              -                    -           5,049            5,049 
 
 At 31 December 2021           14,192,699                    -           7,219       14,199,918 
                             ------------  -------------------  --------------  --------------- 
 
 Carrying amount 
                             ------------  -------------------  --------------  --------------- 
 At 31 December 2021           42,960,000              500,000          94,498       43,554,498 
                             ------------  -------------------  --------------  --------------- 
 
 Cost 
 At 1 January 2022             57,152,699              500,000         101,717       57,754,416 
 Additions                              -                    -         117,838          117,838 
                             ------------  -------------------  --------------  --------------- 
 At 31 December 2022           57,152,699              500,000         219,555       57,872,254 
                             ------------  -------------------  --------------  --------------- 
 Accumulated amortisation & impairment 
 At 1 January 2022             14,192,699                    -           7,219      14,199,918 
 Amortisation charge for 
  the year                                                   -          10,263           10,263 
  Impairment charge for 
   the year                    40,660,000              500,000               -       41,160,000 
                             ------------  -------------------  --------------  --------------- 
 At 31 December 2022           54,852,699              500,000          17,482       55,370,181 
                             ------------  -------------------  --------------  --------------- 
 
   Carrying amount 
                             ------------  -------------------  --------------  --------------- 
 At 31 December 2022            2,300,000                    -         202,073        2,502,073 
                             ------------  -------------------  --------------  --------------- 
 

Goodwill acquired in 2020 arose on the acquisition and hive up of Waste2Tricity Limited. It was considered attributable to the Company's DMG(TM) technology, which is intended to be licensed on a project-by-project basis to generate income to the Company over the lifetime of each project.

The recoverable amount of goodwill at the balance sheet date was assessed as a directors' valuation (2021: via independent third-party valuation). The directors (2021: Valuer) assessed impairment of GBP40.66m to goodwill (2021: the valuer assessed goodwill above its carrying value resulting in no impairment). The directors (2021: valuer) took note of the ICAEW Corporate Finance Faculty Best Practice Guideline April 2008 and applied a discounted cashflow approach, supported by the International Private Equity and Venture Capital Guidelines of December 2018.

The key assumptions made by the directors (2021: valuer) were:

the expected roll out of the technology over 5 years following the delivery of the Protos project (2021: roll out over 5 years based on probability adjusted scenarios);

that the roll out will not be significantly impacted by competing technologies (2021: same assumption);

that the Company and roll out developer construct 5 projects (2021: have the capability to scale up where necessary to deliver the assumed roll out pipeline);

the expected operating life of projects from which the Company will earn licence revenues (2021: same assumption);

the expected licence fees arising per project based upon agreements with Peel NRE (2021: same assumption);

the expected cost of services to support annual licence fee income estimated by the Company based upon current draft project agreements (2021: same assumption);

applying a discount rate to cashflow of 35% (2021: 10%) assessed by review of market survey reports of discount rates for projects within similar and competing sectors which was considered to provide a reasonable estimate of a weighted average cost of capital for a company benefiting from the assumed roll out.

Changes to the above assumptions would impact the valuation assessment.

The Directors believe that key sensitivities in the valuation are as follows:

(i) In 2022, the directors have assumed a fixed number of 5 projects and 6 systems to be rolled out. Sensitivity workings with the roll out of 3 projects and 3 systems would decrease the valuation by cGBP0.8m to GBP1.5m. (2021: the valuer assumed a probability adjusted roll out scenario). The valuer attributed probabilities to different roll out scenarios based upon a review of information provided by the Company and Peel NRE. This takes account of expected timelines and the average number of systems expected to be deployed at each site. The rollout assumptions made by the valuer averages out at 17.85 systems. Based upon the valuer's assumptions, an incremental system would increase or decrease the valuation by c GBP2.3m).

(ii) The discount rate applied to the cashflows. Sensitivity workings with a discount rate 5% higher at 40% would decrease the valuation by cGBP0.5m to GBP1.8m. (2021: an increase in the discount rate of 1% to 11% would impact the Valuer's valuation assessment by GBP4.4m).

(iii) Inflation - an increase in the inflation assumption above that assumed in the directors (2021: valuer's) model would result in adjustment to the licence fees and result in an increase the director's (2021: valuer's) valuation.

The Directors have not accounted for the possibility of any onerous obligations arising within the service contracts from which licence fees will be earnt as there is no reason to expect that these will arise at this stage in the business life cycle.

Exclusivity rights arose on the acquisition and hive up of Waste2Tricity Limited. They are subject to an Option Agreement between the Company and Peel NRE. The directors have provided for a full impairment of GBP500,000 for exclusivity rights (2021: no impairment is considered to have arisen).

As explained in note 28, the Company acquired the full ownership of Protos Plastics to Hydrogen No. 1 Ltd (also known as "Protos SPV") from Peel NRE Ltd for a nominal payment of GBP1 on 28 April 2023. During the year to 31 December 2022, the company had been in discussions with Peel NRE to enter into a 50/50 Joint Venture arrangement with Peel NRE. However, this did not materialise and Peel NRE continued to own 100% of Protos SPV until the Company finally purchased 100% of the share capital of Protos SPV on 28 April 2023. The purchase agreement by the Company secures full control of Protos SPV with an option to lease on the site at Protos Chester, CH2 4RB. This post balance sheet event, is a material change in business approach for the Company, allowing the Company to take full responsibility for funding, construction and operation of a waste to energy site utilising the DMG(TM) technology. The directors have opted not to pursue a licencing business model that was previously part of the reason for the hive up of Waste2Tricity Limited into the Company in 2020. This has therefore resulted in a non-adjusting post balance sheet event under IAS 28.

Refer to the CEO section of the Annual Report

   12.    Tangible fixed assets 
 
                                    Right of use          Property,          Fixtures              Total 
                                           asset          plant and               and 
                              Land and buildings          equipment          fittings 
                                             GBP                GBP               GBP                GBP 
 Cost 
 At 1 January 2021                        49,250             12,720                 -             61,970 
 Additions                                     -              7,693             1,203              8,896 
                            --------------------  -----------------  ----------------  ----------------- 
 At 31 December 2021                      49,250             20,413             1,203             70,866 
                            --------------------  -----------------  ----------------  ----------------- 
 
 Accumulated depreciation 
 At 1 January 2021                         2,052              6,898                 -              8,950 
 Charge for the year                      24,625              3,807               392             28,824 
                            --------------------  -----------------  ----------------  ----------------- 
 At 31 December 2021                      26,677             10,705               392             37,774 
                            --------------------  -----------------  ----------------  ----------------- 
 
 Carrying amount 
                            --------------------  -----------------  ----------------  ----------------- 
 At 31 December 2021                      22,573              9,708               811             33,092 
                            --------------------  -----------------  ----------------  ----------------- 
 
 Cost 
 At 1 January 2022                        49,250             20,413             1,203             70,866 
 Additions                                     -                  -               673                673 
                            --------------------  -----------------  ----------------  ----------------- 
 At 31 December 2022                      49,250             20,413             1,876             71,539 
                            --------------------  -----------------  ----------------  ----------------- 
 
 Accumulated depreciation 
 At 1 January 2022                        26,677             10,705               392             37,774 
 Charge for the year                      22,573              4,865               532             27,970 
                            --------------------  -----------------  ----------------  ----------------- 
 At 31 December 2022                      49,250             15,570               924             65,744 
                            --------------------  -----------------  ----------------  ----------------- 
 
   Carrying amount 
                            --------------------  -----------------  ----------------  ----------------- 
 At 31 December 2022                           -              4,843               952              5,795 
                            --------------------  -----------------  ----------------  ----------------- 
 
 
 
 
   13.    Investments 
 
                                     2022        2022   2022          2021        2021   2021 
                                      GBP         GBP    GBP           GBP         GBP    GBP 
                             Subsidiaries  Associates  Other  Subsidiaries  Associates  Other 
 
  Cost or carrying 
   value at 1 January          48,947,155     140,540      -    48,947,156          49      - 
  Additions                             -           -      -             -      99,990      - 
  Goodwill recognised                   -           -      -             -           -      - 
  Dividends                             -     (1,935)      -             -           -      - 
  Share of associate's 
   net result                           -      49,033      -             -      40,550      - 
  Transfers                             -           -      -             -        (49)     49 
  Disposals                             -           -      -           (1)           -      - 
 
  Cost or carrying value 
   31 December                48,947,155    187,638      -     48,947,155    140,540     49 
                           --------------  ----------  -----  ------------  ----------  ----- 
 
  Provision at 1 January     (48,947,154)           -      -  (48,947,154)           -      - 
  Additions                             -           -      -             -           -   (49) 
  Disposals                             -           -      -             -           -      - 
                           --------------  ----------  -----  ------------  ----------  ----- 
  Accumulated impairment     (48,947,154)           -         (48,947,154)           -   (49) 
                           --------------  ----------  -----  ------------  ----------  ----- 
  Carrying value                        1     187,638      -             1     140,540      - 
                           --------------  ----------  -----  ------------  ----------  ----- 
 
   (i)   Subsidiaries 

Investments relate to costs of investments in subsidiary undertakings, namely in Powerhouse Energy, Inc, Pyromex AG and Powerhouse Energy UK Limited. Powerhouse Energy, Inc is incorporated in California in the United States of America and the Company holds 100 per cent of the common stock and voting rights of the subsidiary. Pyromex AG is based in Zug, Switzerland and the Company holds 100 per cent of the shares and voting rights of the subsidiary. Powerhouse Energy UK Limited is a wholly owned UK based dormant company.

The registered address of Powerhouse Energy Inc is 145 N Sierra Madre Blvd, Pasadena, CA 91107, USA.

The registered address of Pyromex AG is Chollerstrasse 3, CH-6300, Zug, Switzerland.

The registered address of Powerhouse Energy UK Limited is 15 Victoria Mews, Mill Field Road, Cottingley Business Park, Bingley BD16 1PY.

Waste2Tricity Limited, which was acquired in 2020, was incorporated in the UK and on 1 January 2021 the Company owned 100 per cent of its common stock and voting rights. It was dissolved on 1 June 2021.

(ii) Acquisition of interest in Engsolve Limited

On 12 August 2021, the Company acquired 48.39% of the share capital of Engsolve Limited for cash consideration of GBP99,990. Engsolve Limited is incorporated and operates in the UK. Summary financial information of Engsolve Limited at acquisition and balance sheet dates is provided below:

 
                             31 Dec 2022  31 Dec 2021 
                                     GBP          GBP 
Summarised balance sheet 
Fixed assets                       6,221        7,848 
Cash and cash equivalents        400,073      317,423 
Other current assets              86,632       99,845 
Current liabilities            (109,457)    (138,981) 
                             -----------  ----------- 
Net assets                       383,469      286,135 
Company share                     48.39%       48.39% 
Share of net assets              185,550      138,452 
                             -----------  ----------- 
 
 
 
Summarised Income statement 
 - post acquisition 
Revenue                               976,182  402,122 
                                     --------  ------- 
Profit from continuing operations     101,334   83,804 
Profit from discontinued                    -        - 
 operations 
Other comprehensive income                  -        - 
                                     --------  ------- 
Total comprehensive income            101,334   83,804 
                                     --------  ------- 
 
Company Share of pre-tax 
 profit                                60,326   50,062 
Company share of tax                 (11,293)  (9,512) 
Dividends received                      1,935   GBPnil 
 
 
 

The Company incurred advisory costs associated with the acquisition which were expensed in 2021.

(iii) Other investments

During 2021, the Company's investment in Waste2Tricity International (Thailand) Limited was transferred into a new Thailand based entity, Altec Energy Limited ("Altec"). The Company has not taken part in fund raises investment made by Altec subsequent to its formation. In the previous year's accounts the interest was identified as being reduced to 33.8% as at 31 December 2021 and to 30.4% since December 2021. We have been recently informed that the audit of Altec accounts picked up an error in these calculations. The share holding was in fact 33.5% as at December 2021 and 30.1% since December 2021 (a 0.3% error in the calculation). PHE Due to the passive nature of the Company's involvement, the interest is held in other investments.

   14.    Loans receivable 
 
                             2022       2021 
                              GBP        GBP 
 
  Loans advanced        2,077,600  1,150,000 
  Accrued interest         81,674     15,286 
  Loan provision      (2,159,274)          - 
                                -  1,165,286 
                      -----------  --------- 
 

On 12 May 2021, the Company agreed to provide a loan facility for up to GBP3.8m to Protos Plastics to Hydrogen No 1 Limited, the Peel NRE special purpose vehicle and owner of the development of the Protos plant. The loan was to provide support to the plant construction and to secure long lead time items and project design services. The loan facility was made available for an initial 6-month period, accruing interest daily at the Bank of England base rate plus 2%. The availability period for the facility was subsequently extended until 28 April 2023 at which point Powerhouse Energy Group Plc acquired 100% of the share capital of Protos Plastics to Hydrogen No1 Limited for GBP1. From October 2022 to the year end, the directors were seeking a 50/50 JV with Peel NRE and there had been other indicators of a change in the risk profile. The directors in note 11 have assumed a discount rate of 35% for the project with Peel NRE, due to the change in the risk profile. Accordingly, the Directors have impaired the loan in full. The Directors have also applied the same approach to the trade debtor balance of GBP986,392 which existed between Powerhouse Energy Group Plc and Protos Plastics to Hydrogen No 1 Limited and have subsequently impaired the trade debtor balance also to GBPNil value at the year end.

   15.    Trade and other receivables 
 
                                        2022     2021 
                                         GBP      GBP 
 
  Trade receivables                        -  447,967 
  Other receivables                  342,021  177,513 
  Prepayments and accrued income      61,226  338,168 
                                     403,247  963,648 
                                     -------  ------- 
 
   16.    Corporation tax 
 
                                     2022     2021 
                                      GBP      GBP 
 
  Corporation tax recoverable     166,318  155,227 
 
                                  166,318  155,227 
                                  -------  ------- 
 
   17.    Cash and cash equivalents 
 
                         2022       2021 
                          GBP        GBP 
 
  Cash balances     5,882,897  9,637,460 
 
                    5,882,897  9,637,460 
                    ---------  --------- 
 
   18.    Trade and other payables: amounts falling due within one year 
 
                                      2022     2021 
                                       GBP      GBP 
 
  Trade payables                   116,560  144,105 
  Lease liability                        0   23,455 
  Other creditors and accruals     148,563  238,955 
  Other taxes                       10,677  156,642 
  Pensions payable                   3,506      624 
                                   279,306  563,781 
                                   -------  ------- 
 
   19.    Financial assets and financial liabilities 
 
   Financial assets                             2022        2021 
                                                 GBP         GBP 
   Financial assets at amortised cost: 
 - Trade receivables                               -     447,967 
 - Other financial assets at amortised 
  cost                                             -   1,165,286 
 - Cash and cash equivalents               5,882,897   9,637,460 
                                           5,882,897  11,250,713 
                                           ---------  ---------- 
 
 
  Financial liabilities                2022     2021 
                                        GBP      GBP 
  Liabilities at amortised cost 
      - Trade payables              116,560  144,105 
     - Other creditors              148,563  238,955 
     - Taxes - VAT & payroll         10,677  156,642 
     - Pensions payable               3,506      624 
     - Lease liabilities                  0   23,455 
 
                                    279,306  563,781 
                                    -------  ------- 
 
   20.    Leases 

The Company has leased offices at the location of its research facility for a duration less than one year. The lease is reflected in the accounts as an expense on the income statement.

20.1 Amounts recognised in the balance sheet

Right of use assets relate to leased properties that do not meet the definition of investment property and are presented within tangible fixed assets per Note 11.

 
                                         2022      2021 
                                          GBP       GBP 
Right of use assets 
Balance at 1 January                   22,573    47,198 
Additions to right of use assets            -         - 
Depreciation charge for the year     (22,573)  (24,625) 
Balance at 31 December                      -    22,573 
                                     --------  -------- 
 
 
                                                      2022    2021 
           Future minimum rentals payable are as       GBP     GBP 
           follows: 
         Amounts payable: 
         Within one year                                 -  24,310 
         Later than one year and not later than          -       - 
          five years 
                                                     -----  ------ 
         Total gross payments                            -  24,310 
         Impact of finance expenses                      -   (855) 
         Carrying value of liability                     -  23,455 
                                                       ---  ------ 
 

20.2 Amounts recognised in income statement

 
                                               2022    2021 
                                                GBP     GBP 
 
  Depreciation charge                        22,573  24,625 
  Interest on lease liabilities                 855   2,638 
  Expenses relating to short term leases        120       - 
                                             23,548  27,263 
                                             ------  ------ 
 

20.3 Amounts recognised in statement of cashflows

 
                                    2022    2021 
                                     GBP     GBP 
 
Interest on lease liabilities        855   2,638 
Repayment of lease principal      23,455  23,882 
 
Total cash outflow for leases     24,310  26,520 
                                  ------  ------ 
 
   21.    Share capital 

(i) Number of shares

 
                           0.5 p Ordinary  0.5 p Deferred  4.5 p Deferred  4.0 p Deferred 
                                   shares          shares          shares          shares 
 
  Shares at 1 January 
   2021                     3,715,100,693     388,496,747      17,373,523       9,737,353 
 
  Issue of shares             242,313,442               -               -               - 
 
  Shares at 31 December 
   2021                     3,957,414,135     388,496,747      17,373,523       9,737,353 
                           --------------  --------------  --------------  -------------- 
 
  Issue of shares                       -               -               -               - 
 
  Shares at 31 December 
   2022                     3,957,414,135     388,496,747      17,373,523       9,737,353 
                           --------------  --------------  --------------  -------------- 
 
 

( ii) Value in GBP

 
                       0.5 p Ordinary  0.5 p Deferred  4.5 p Deferred  4.0 p Deferred  Share Capital 
                               shares          shares          shares          shares 
                                  GBP             GBP             GBP             GBP            GBP 
 
  At 1 January 2021        18,575,503       1,942,483         781,808         389,494     21,689,288 
 
  Issue of shares           1,211,568               -               -               -      1,211,568 
  At 31 December 
   2021                    19,787,071       1,942,483         781,808         389,494     22,900,856 
                       --------------  --------------  --------------  --------------  ------------- 
 
  Issue of shares                   -               -               -               -              - 
 
  At 31 December 
   2022                    19,787,071       1,942,483         781,808         389,494     22,900,856 
                       --------------  --------------  --------------  --------------  ------------- 
 

All ordinary shares of the Company rank pari-passu in all respects.

The deferred shares do not carry any voting rights or any entitlement to attend general meetings of the Company. They carry only a right to participate in any return of capital once an amount of GBP100 has been paid in respect of each ordinary share.

On 21 January 2021, the Company issued 181,818,182 ordinary shares of 0.5p each ("Ordinary shares") in the Company at a price of 5.5p each amounting to GBP10,000,000 before issue costs. The Company also granted 9,090,910 warrants to subscribe for Ordinary Shares at the issue price of 5.5p to its broker.

On 26 January 2021, the Company issued 4,895,260 ordinary shares of 0.5p each in the Company further to the exercise of warrants for proceeds amounting to GBP122,382.

On 9 February 2021, the Company issued 6,000,000 ordinary shares of 0.5p each in the Company further to the exercise of options for proceeds amounting to GBP36,000.

On 24 February 2021, the Company issued 1,600,000 ordinary shares of 0.5p each in the Company further to the exercise of options for proceeds amounting to GBP12,000.

On 4 March 2021, the Company issued 6,000,000 ordinary shares of 0.5p each in the Company further to the exercise of options for proceeds amounting to GBP45,000.

On 17 March 2021, the Company issued 500,000 ordinary shares of 0.5p each in the Company further to the exercise of options for proceeds amounting to GBP3,000.

On 19 April 2021, the Company issued 6,000,000 ordinary shares of 0.5p each in the Company further to the exercise of options for proceeds amounting to GBP36,000.

On 22 July 2021, the Company issued 8,000,000 ordinary shares of 0.5p each in the Company further to the exercise of options for proceeds amounting to GBP48,000.

On 19 August 2021, the Company issued 13,500,000 ordinary shares of 0.5p each in the Company further to the exercise of options for proceeds amounting to GBP81,000.

On 7 October 2021, the Company issued 7,000,000 ordinary shares of 0.5p each in the Company further to the exercise of options for proceeds amounting to GBP42,000.

On 9 December 2021, the Company issued 7,000,000 ordinary shares of 0.5p each in the Company further to the exercise of options for proceeds amounting to GBP42,000.

   22.    Other reserves 
 
                                           Merger relief  Share premium 
                                                 reserve        account 
                                                     GBP            GBP 
 
  As at 1 January 2021                        36,117,711     52,592,934 
  Issue of shares                                      -      9,519,495 
  Share issue costs                                    -      (822,719) 
  Reserve transfer - goodwill impairment               -              - 
                                           -------------  ------------- 
  At 31 December 2021                         36,117,711     61,291,710 
                                           -------------  ------------- 
  Issue of shares                                      -              - 
  Share issue costs                                    -              - 
  Reserve transfer - goodwill impairment    (36,117,711)              - 
  At 31 December 2022                                  -     61,291,710 
                                           -------------  ------------- 
 
   23.    Accumulated deficit 
 
                                                   2022          2021 
                                                    GBP           GBP 
 
  As at 1 January                          (65,224,306)  (63,544,097) 
  Loss for the year                        (46,198,679)   (1,870,496) 
  Share based payments                         (18,629)       190,287 
  Reserve transfer - goodwill impairment     36,117,711             - 
                                            (75,323,903 
  At 31 December                                      )  (65,224,306) 
                                           ------------  ------------ 
 
   24.    Share based payments 

The expense recognized for share-based payments during the year is shown in the following table:

 
                                                             2022       2021 
                                                              GBP        GBP 
   Share based payment charge recognised in Income 
    Statement 
Expense arising from equity-settled share-based 
 payment transactions: 
        - Share options for Directors and employees             -     34,829 
        - Shares issued for third party services                -          - 
                                                         --------  --------- 
Total share-based payment charge in Income 
 Statement                                                      -     34,829 
 
   Share based payment charge recognised in Share 
    Premium Account 
     Warrants for third party services                          -    419,138 
                                                         --------  --------- 
     Total share-based payment charge in Share Premium 
      Account                                                   -    419,138 
 
   Total share-based payment charges recognised                 -    453,967 
 
   Other share-based payment movement 
     Exercise of share options by Directors and 
      employees                                                 -  (186,982) 
     Exercise of warrants for third party services              -   (76,698) 
     Shares option lapsed in Jan 22                      (18,629)          - 
                                                         --------  --------- 
   Total share-based payment                             (18,629)  (190,287) 
                                                         --------  --------- 
 

There were no liabilities recognised in relation to share based payment transactions.

25.1 Share options for Directors and employees

The Company has put in place various options schemes for Directors and employees as follows:

On 8 December 2014, the Company granted 11,000,000 options over ordinary shares to the Board. The options may be exercised between the grant date and the tenth anniversary of the grant date and will lapse if not exercised during that period.

On 7 March 2016, the Company granted 15,000,000 options over ordinary shares to the Board. The options may be exercised between the grant date and the fifth anniversary of the grant date and will lapse if not exercised during that period.

On 6 March 2018, the Company granted 32,100,000 options over ordinary shares to employees, including a Board member, under the Powerhouse Energy Group PLC 2018 EMI Option Scheme. The options vest to the employees over a period of 24 months and are exercisable between the relevant vesting dates and the tenth anniversary of the grant date and will lapse if not exercised during that period. These options had all been exercised or forfeited by 31 December 2019.

On 6 March 2018, the Company granted 60,000,000 options over ordinary shares to Board members under the Powerhouse Energy Group PLC 2018 non-employee Share Option Plan. The options vest to the Board members over a period of 24 months and are exercisable between the relevant vesting dates and the tenth anniversary of the grant date and will lapse if not exercised during that period.

On 23 April 2021, the Company granted 1,773,239 share options in ordinary shares of 0.5p each in the Company to two Directors of the Company in lieu of part or all of their fees to which they are entitled. The options have an exercise price of 6.3p each and lapse 3 years from the date of grant.

The movement of share options in the year are as follows:

 
                        2022          2022           2021           2021 
                       Number     WAEP (pence)      Number      WAEP (pence) 
                    -----------  -------------  -------------  ------------- 
 Outstanding at 
  1 January          16,062,692       1.33        75,000,000        0.77 
 Granted during 
  the year               -             -          1,773,239         6.3 
 Forfeited during 
  the year           (481,337)        6.3        (5,100,547)        2.55 
 Exercised during 
  the year               -             -         (55,600,000)       0.62 
                    -----------  -------------  -------------  ------------- 
 Outstanding at 
  31 December        15,581,355       1.13        16,062,692        1.33 
                    -----------  -------------  -------------  ------------- 
 
 Exercisable at 
  31 December        15,581,355       1.13        16,062,692        1.33 
 

The weighted average remaining contractual life for the share options outstanding as at 31 December 2022 was 4.4 years (2021: 5.3 years)

No share options were granted during the year (2021: 1,773,239).

The range of exercise prices for options outstanding at the year-end was 0.6p to 6.3p (2021: 0.6p to 6.3p).

The number of options outstanding at 31 December 2022 and the movements in the year are as follows:

 
 Date       Granted     Share price    Exercised      Forfeited      At 31      Exercise       Exercise 
  of                      on grant                                     Dec        price          period 
  grant                                                               2022 
 
                                                                                             9 Dec 2014 
 8 Dec                                                                                      until 8 Dec 
  2014     6,000,000      1.875p           -         (3,000,000)   3,000,000      2.5p             2024 
 
                                                                                             8 Mar 2016 
 7 Mar                                                                                            until 
  2016     9,000,000       0.55p      (7,600,000)    (1,400,000)       -         0.75p       7 Mar 2021 
 
                                                                                             7 Mar 2018 
 6 Mar                                                                                            until 
  2018     60,000,000      0.57p      (48,000,000)        -        12,000,000     0.6p        8 Dec 24* 
                                                                                            23 Apr 2021 
 22 Apr                                                                                           until 
  2021     1,773,239       5.58p           -         (1,191,884)    581,355       6.3p      22 Apr 2024 
          -----------  ------------  -------------  ------------  ----------- 
 Total     76,773,729   (55,600,00)   (5,591,884)                  15,581,355 
          ----------- 
 

*The expiry date of the option granted on 6 March 2018 was adjusted by the board due to a director leaving the Company in June 2022. The expiry date was adjusted from 6 Mar 2028 to the 8 Dec 2024. Refer to note 27 in the financial statements.

The estimated fair value of the options issued was calculated by applying the Black-Scholes option pricing model. The assumptions used in the calculation were as follows:

 
                             8 December 2014   6 March 2018   22 April 2021 
 
     Options in issue 31 
      December 2022                3,000,000     12,000,000         581,355 
     Exercise price                     2.5p           0.6p            6.3p 
     Expected volatility             127.56%       70.00%**        214.8%** 
     Contractual life               10 years       10 years         3 years 
     Risk free rate                       2%          1.49%           0.15% 
     Estimated fair value              1.79p         0.32p*          3.87p* 
      of each option 
 

* the calculation applies a 25% discount for small companies

** expected volatility based on historic volatility at the point of grant.

25.2 Warrants for third party services

The Company has issued warrants in respect of services provided by consultants as part of their service arrangements. It has also issued warrants to participating shareholders in respect of certain fund raises. No share-based payment charge is recognised for warrants issued to participating shareholders as they are outside of the scope of IFRS 2.

Details of warrants which have been issued during the year are as follows:

On 15 September 2020, the Company granted 5,395,260 warrants to the Company's broker as part of its service arrangement in relation to the fund raise arising on that date. The options may be exercised between the grant date and the third anniversary of the grant date and will lapse of not exercised during that period. At the date of grant the share price was 3.3p and the warrants have an exercise price of 2.5p per share.

On 21 January 2021, the Company granted 9,090,910 warrants to the Company's broker as part of its service arrangement in relation to the fund raise arising on that date. The options may be exercised between the grant date and the third anniversary of the grant date and will lapse of not exercised during that period. At the date of grant the share price was 8.6p and the warrants have an exercise price of 5.5p per share.

Warrants in respect of services provided:

The movement of warrants issued for share-based payments in the year are as follows:

 
                                     2022          2022          2021           2021 
                                    Number     WAEP (pence)     Number      WAEP (pence) 
     Outstanding at 1 January      9,590,910       5.3         5,395,260        2.5 
     Granted during the year           -            -          9,090,910        5.5 
     Forfeited during the              -            -              -             - 
      year 
     Exercised during the 
      year                             -            -         (4,895,260)       2.5 
                                  ----------  -------------  ------------  ------------- 
     Outstanding at 31 December    9,590,910       5.3         9,590,910        5.3 
                                  ----------  -------------  ------------  ------------- 
 
     Exercisable at 31 December    9,590,910       5.3         9,590,910        5.3 
 

The weighted average remaining contractual life for the share warrants outstanding as at 31 December 2022 was 1.0 years (2021: 2.1 years)

The range of exercise prices for warrants outstanding at the year-end was 2.5p to 5.5p (2021: 2.5p to 5.5p).

The number of warrants, which have been included for share-based payment purposes, outstanding at 31 December 2022 and the movements in the year are as follows:

 
     Date of         Granted       Share     Exercised   Forfeited     At 31     Exercise       Exercise 
      grant                        price                                Dec        Price          period 
                                  on grant                              2022 
                                                                                             16 Sep 2020 
                                                                                                until 15 
     15 Sep 2020    5,395,260      3.3p          -           -        500,000      2.5p         Sep 2023 
 
                                                                                             22 Jan 2021 
                                                                                                   until 
     21 Jan 2021    9,090,910      8.6p          -           -       9,090,910     5.5p      21 Jan 2024 
-----------------  -----------  ----------  ----------  ----------  ----------  ---------  ------------- 
     Total          14,486,170                   -           -       9,590,910 
 
 

The Company is required to assess the fair value of instruments issued in respect of services received, with such value charged to the Income Statement. The estimated fair value of the warrants issued during the year was calculated by applying the Black-Scholes option pricing model. The assumptions used in the calculation were as follows:

 
     Warrants issued for     15 Sep 2020   21 Jan 2021 
      services 
 
     In issue 31 December 
      2022                       500,000     9,090,910 
     Exercise price                 2.5p          5.5p 
     Expected volatility*         92.10%        161.6% 
     Contractual life            3 years       3 years 
     Risk free rate                0.07%       (0.07%) 
     Estimated fair value 
      of each option               1.57p          4.6p 
 

* expected volatility based on historic volatility at the point of grant.

Warrants issued to participating shareholders

Warrants issued to participating shareholders are outside the scope of IFRS 2 and no share-based payment charges have been recognised on them. On initial recognition the warrants' cost was deducted from equity as it represents the cost of shares issued to investors. As the agreements had a fixed-for-fixed requirement, they are also recognised as equity at the same time. As such, there is GBPnil net impact on equity and has not been included in the statement of changes in equity.

The number of warrants issued to participating shareholders, which have not been included for share-based payment purposes, outstanding at 31 December 2022 and the movements in the year are as follows:

 
 Date           Granted       Share     Exercised   Forfeited    At 31 Dec    Exercise      Exercise 
  of grant                    price                                 2022        price         period 
                             on grant 
 
                                                                                         16 Sep 2020 
 15 Sep                                                                                     until 15 
  2020        371,510,069     3.3p          -           -       371,510,069    2.75p        Sep 2022 
 
 Total        371,510,069                   -           -       371,510,069 
 
 

The estimated fair value of the warrants issued was calculated by applying the Black-Scholes option pricing model. The assumptions used in the calculation were as follows:

 
  Warrants issued to participating     15 Sep 2020 
   shareholders 
 
  In issue 31 December 2022            371,510,069 
  Exercise price                             2.75p 
  Expected volatility*                     106.20% 
  Contractual life                         2 years 
  Risk free rate                             0.04% 
  Estimated fair value of each 
   option                                    1.46p 
 

* expected volatility based on historic volatility at the point of grant.

All warrants

The number of all warrants outstanding at 31 December 2022 and the movements in the year are as follows:

 
 Date        Granted        Share        As at      Exercised   Forfeited      At 31      Exercise        Exercise 
  of                        price        1 Jan                                Dec 2021      price           period 
  grant                    on grant       2022 
 
                                                                                                     16 Sep 
                                                                                                      2020 until 
 15 Sep                                                                                               15 Sep 
  2020      5,395,260       3.3p        500,000         -           -         500,000       2.5p      2023 
 
                                                                                                     16 Sep 
 15 Sep                                                                                               2020 until29 
  2020     371,510,069*     3.3p      371,510,06        -           -       371,510,069    2.75p      Apr 2023 
 
                                                                                                     22 Jan 
                                                                                                      2021 until 
 21 Jan                                                                                               21 Jan 
  2021      9,090,910       8.6p       9,090,910        -           -        9,090,910      5.5p      2024 
 
 Total     385,996,239                381,100,979       -           -       381,100,979 
 

*Please see the Post Balance Sheet Event note on Peel warrants

   26.    Material risks 

The Company is subject to various risks relating to political, economic, legal, social, industry, business and financial conditions. Risk assessment and evaluation is an essential part of the Company's planning and an important aspect of the Company's internal control system. The Company's approach to these risks is detailed in the Strategic Report.

   27.    Directors' remuneration and share interests 

The Directors who held office at 31 December 2022 had the following interests, including any interests of a connected party in the ordinary shares of the Company:

 
               Number of ordinary shares  Percentage of 
                      of 0.5p each         voting rights 
-----------  ---------------------------  -------------- 
 
Keith Riley          12,128,986                <0.5 
 
 
 

The remuneration of the Directors of the Company paid or payable for the year or since date of appointment, if later, to 31 December 2022 is:

 
                                     2022      2022          2022    2022     2022     2021 
                                      GBP       GBP           GBP     GBP      GBP      GBP 
                               Salary/Fee   Pension   Share based   Other    Total    Total 
                                                         payments 
----------------------------  -----------  --------  ------------  ------  -------  ------- 
 
Tim Yeo                            54,000         -             -   5,500   59,500  127,944 
David Ryan                              -         -             -       -        -   97,996 
William Cameron Davies                  -         -             -       -        -    7,500 
Paul Emmitt                        64,906     2,000             -       -   66,906        - 
James John Pryn Greenstreet        15,000         -             -       -   15,000   30,000 
Hugh Mcallister                    27,232         -             -       -   27,232        - 
Paul Drennan-Durose               251,026     8,714             -       -  259,740        - 
Gillian Weeks                      24,296         -             -       -   24,296        - 
Russell Ward                       18,899         -             -       -   18,899        - 
Myles Howard Kitcher               25,667         -             -       -   25,667        - 
Allan Vlah                          7,500         -             -       -    7,500   37,500 
Kirsten Gogan                           -         -             -       -        -   23,468 
Keith Riley                        92,546         -             -       -   92,546    8,167 
Mark Berry                              -         -             -       -        -   17,500 
----------------------------  -----------  --------  ------------  ------  -------  ------- 
Total                             581,072    10,714             -   5,500  597,286  350,075 
----------------------------  -----------  --------  ------------  ------  -------  ------- 
 

Total remuneration includes share-based payments arising from the issue of options amounting to nil in 2022 (2021: GBP40,000). There have been no awards of shares to Directors under long term incentive plans during the year.

The Directors' social security costs for the year amounted to GBP54,026 (2021: GBP29,965) resulting in a total remuneration expense of GBP651,312 (2020: GBP380,040).

Prior to their resignations from the Board, Tim Yeo, William Cameron Davies, James John Pryn Greenstreet, Allan Vlah, Kirsten Gogan and Mark Berry had service contracts that could be terminated by the provision of three months' notice. David Ryan had a service contract that could be terminated by the provision of six months' notice.

Keith Riley has a service contract which can be terminated by providing three months' written notice.

Rivermill Partners Limited, a company wholly owned by Tim Yeo and his associates, provided executive corporate management services during the year the value of which is included in the above remuneration. These services are contracted for on an annual basis as required.

Share options held by the Directors who served during the year are as follows:

 
                     Options  Forfeited  Exercised       Options  Exercise       Earliest and 
                          at                         at 31/12/22     price        latest date 
                      1/1/22                                                      of exercise 
----------------  ----------  ---------  ---------  ------------  --------  ----------------- 
Options granted 
 8 Dec 2014 
 
James John Pryn 
 Greenstreet       3,000,000          -          -     3,000,000      2.5p  9/12/14 - 8/12/24 
 
 
                     Options  Forfeited  Exercised       Options  Exercise       Earliest and 
                          at                         at 31/12/22     price        latest date 
                      1/1/22                                                      of exercise 
----------------  ----------  ---------  ---------  ------------  --------  ----------------- 
Options granted 
 6 March 2018 
James John Pryn 
 Greenstreet      12,000,000          -          -    12,000,000      0.6p  7/3/18 - 8/12/24* 
 
 
                     Options  Forfeited  Exercised                Exercise       Earliest and 
                     granted     or not                  Options     price        latest date 
                       /1/22     vested              at 31/12/22                  of exercise 
----------------  ----------  ---------  ---------  ------------  --------  ----------------- 
Options granted 
 22 April 2021 
Allan Vlah           581,355          -          -       581,355      6.3p  23/4/21 - 22/4/24 
----------------  ----------  ---------  ---------  ------------  --------  ----------------- 
 
 
 
 

*On the 29(th) September 2022 the board agreed to align the termination/expiry dates for both sets of options for James Greenstreet to 8(th) Dec 2024

Highest Paid Director

Paul Drennan-Durose was the highest paid Director in the year. There were no shares received or receivable by him in respect of qualifying services under long term incentive schemes.

   28.    Related parties 

Rivermill Partners Limited, a corporate management services company, wholly owned by Tim Yeo and his associates, was a related party for the 12 month period after which Tim Yeo was a Director of the Company. During that period, Rivermill provided executive corporate management services amounting to GBP54,000 (2021: GBP48,000) and the Company agreed a termination settlement of GBP5,500.

Engsolve Limited, an engineering solutions company, was a related party until 30 June 2021 due to a Director's family member being part of its key management personnel, and from 12 August 2021 when the Company acquired 48.39% of its share capital. Engsolve provided engineering services to the Company during the year amounting to GBP596,172 (2021: GBP621,968). Amounts outstanding at year end for services provided and included in these accounts amounted to GBP31,778 (2021: GBP41,058).

During 2021 Hydrogen Utopia International entered into an exclusivity agreement with Powerhouse Energy Group Plc. This exclusivity agreement covered Hungry, Greece & Poland. During 2022 Hydrogen Utopia International paid GBP38,983 for this Exclusivity Agreement (2021 GBP71,829). This exclusivity agreement covering Hungary, Greece and Poland ended in March 2022.

Keith Riley was a Non-Executive Director, Interim Chairman and acting Chief Executive Officer of the Company during 2022. Keith was also an active director in Engsolve Ltd in 2022. Keith joined Hydrogen Utopia PLC as Technical Director on 6th January 2022 and resigned on 26th May 2023. Keith was also a director of HU2021 International UK Ltd from 18th January 2022 until 31st May 23.

Howard White is a shareholder in the Company and also a strategic Consultant to the Company, having received GBP60,000.00 for his services in 2022. Howard White is also an active Board Member and shareholder of Hydrogen Utopia International.

Hugh McAlister was a Non-Executive Director of the Company during 2022 and also owned shares in Hydrogen Utopia International.

   29.    Events after the reporting period 

On 16 March 2023 the Company entered into a lease agreement for a building to house the forthcoming Powerhouse Technology Centre. The lease term is 10 years with a break option at 5 years, at a rental of GBP46,000 per annum.

On 21 March 2023, the Company announced it had entered into a Joint Venture agreement with Hydrogen Utopia International Plc for the proposed joint development of a non-recyclable plastic waste-to-hydrogen facility site at Longford, County Longford in the Republic of Ireland. The joint venture is entered into with equal shareholding by each party and development costs being contributed on a 50:50 basis. PHE has agreed to pay HUI a non-returnable payment of up to GBP400,000 in cash in recognition of HUI's contribution to identifying the Longford Project, securing the option to lease and progressing the project. This cash payment comprises an initial payment of GBP100,000 on signing the heads of terms and a further payment of GBP100,000 upon finalisation of the project documentation between HUI and PHE - principally comprising a development agreement and a shareholder agreement. PHE has agreed to make a further payment of GBP200,000 in cash to HUI once planning permission has been granted for the Longford Project on the Longford Site.

The Company announced that it had acquired full ownership of Protos Plastics to Hydrogen No.1 Ltd on 28 April 2023 from Peel NRE Ltd for a nominal payment of GBP1. The Protos Plastics to Hydrogen Peel NRE is a special purpose vehicle and owner of the development of the Protos plant, the first proposed commercial application of the Company's DMG (TM) technology. Powerhouse Energy Group Plc had previously provided a loan facility of GBP3.8m to support the Protos plant development and construction. Loans made under the facility at Dec 22 amounted to GBP2.159m (incl. Loan interest) and trade debtors amounted to GBP1.18m. Due to the acquisition of the Protos SPV by the company the loan balance of GBP2.159m and the debtors balance of GBP1.18m were impaired as at December 2022.

On 2 May 2023 the Company announced that the subscription and warrant agreement dated September 2020 made between Peel holdings (IOM) Ltd and the Company had expired on 29 April 2023. This warrant agreement included 371,510,069 options exercisable at 2.75p.

On 30 May 2023, the Company announced that it had entered into an agreement with Noage Energy Ltd to act as representative of PHE in Northern Ireland. PHE paid Noage a fee of GBP50,000 on entering the agreement. Noage will also receive a number of success related fees, payable on completion of specified milestones, giving it the possibility of receiving total fees of GBP1.725 million for a fully implemented project (including the initial fee).The Agreement has an initial term of five years, but can be extended for a further two years on the request of Noage. Under the arrangement, however, all contractual commitments with third parties will be with PHE directly and Noage will not be able to give commitments on PHE's behalf.

On 12 August 2021, the Company acquired a 48.39% interest in Engsolve Limited, an engineering consultancy company incorporated and operating in the UK. On 21 June 2023, the Company completed the acquisition of the entire outstanding shareholding of Engsolve for a cash consideration of GBP572,896. The Company considers this a strategic acquisition as it brings Engineering expertise in house and enables it to generate a regular income stream through the providing and development of Engineering Services into the UK market.

   30.    Ultimate controlling party 

There is no controlling party of the Company.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

FR ZZGZVNLNGFZM

(END) Dow Jones Newswires

June 30, 2023 02:00 ET (06:00 GMT)

Powerhouse Energy (LSE:PHE)
Gráfica de Acción Histórica
De Abr 2024 a May 2024 Haga Click aquí para más Gráficas Powerhouse Energy.
Powerhouse Energy (LSE:PHE)
Gráfica de Acción Histórica
De May 2023 a May 2024 Haga Click aquí para más Gráficas Powerhouse Energy.