UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 6-K
REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of November 2024
Commission File Number: 001-42015
Solaris Resources Inc.
(Translation of registrant's name into English)
Suite 555, 999 Canada Place
Vancouver, British Columbia, Canada V6C 3E1
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Form 20-F [ ] Form 40-F [ X ]
The following documents are being submitted herewith:
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
| | Solaris Resources Inc. |
| | (Registrant) |
| | |
| | |
Date: November 12, 2024 | | /s/ Purni Parikh |
| | Purni Parikh |
| | SVP Corporate Affairs and Corporate Secretary |
| | |
EXHIBIT 99.1
Solaris Provides Warintza Operations Update, 2024 Drilling to Exceed
75,000m and Early Works Infrastructure Development Underway
QUITO, Ecuador, Nov. 12, 2024 (GLOBE NEWSWIRE) -- Solaris Resources Inc. (TSX: SLS; NYSE: SLSR) (“Solaris”
or the “Company”) is pleased to provide a Warintza Project (“Warintza” or “the Project”) update, including
the latest assay results from its ongoing 2024 drilling program, now set to exceed 75,000m, and report on technical programs and early
works infrastructure development.
Project Update
Drilling
- Solaris achieved the 60,000m of planned meterage for its 2024 drilling program by the end of October,
and is now set to exceed 75,000m by the end of the year
- Drilling continues with nine rigs primarily focused on extension and infill of the 2024 Mineral Resource
Estimate (“MRE”), while also testing its connection to the Warintza West deposit, which lies outside the MRE and could
deliver significant growth in an expanded pit shell
Infrastructure Development
- The Company has advanced early works infrastructure development, including the improvement of 25km of
road access connecting the Project to the highway grid and recent construction of 8km of new roads to support drilling activities, logistics,
and mobilization (refer to Figure 1)
- Construction continues on a further 7km of roads strategically located to support future mining operations
and access to the anticipated pre-stripping and drilling areas, process plant, Waste Rock Facility (“WRF”) and Tailings Management
Facility (“TMF”)
Technical Programs
- Geotechnical and hydrogeological drilling, field testing, sampling and instrumentation programs have been
completed for the anticipated TMF, and are underway for the anticipated open pit, WRF, process plant and internal infrastructure and expected
to be completed by year-end
- Knight Piésold Consulting is in the process of completing engineering studies for the anticipated
TMF and Water Permit, with the final reports expected to be completed in the coming weeks to support the Environmental Impact Assessment
review period
Metallurgical and Processing Studies
- The metallurgical drilling program to supplement prior test work (refer to press release dated January
23, 2023) has been completed
- Comminution testing has been completed and has returned a more detailed profile with reduced hardness
in the upper part of the deposit than prior test work had suggested
- Next steps are additional flotation tests with a focus on reagent optimization for recovery improvement
which is expected to be completed by year-end
- Ausenco Engineering is working on the process plant design and a preliminary flowsheet has been established,
with prior test work returning high quality concentrates for copper (gold) and molybdenum
Figure 1 – Aerial View of Warintza Project Looking East
Assay Results
Drill results continue to build on the MRE, with holes SLS-111 and SLS-107 improving upon the modelled grade
in its vicinity, while holes SLS 110, SLS 113-116 and SLSE-64 encountered mineralization partially outside of the MRE in
the southern and northeastern sectors.
- SLS-111 (drilled southeast): 90m of 1.12% CuEq² within 475m of 0.46% CuEq² from surface
- SLS-107 (drilled northeast): 96m of 0.82% CuEq² within 543m of 0.51% CuEq² from surface
Step-out exploration drilling to the northwest of the MRE testing its connection to the Warintza West deposit
has been completed with assays expected in the coming weeks, representing an opportunity for expansion of the MRE in an enlarged
pit.
Figure 2 – Warintza Drilling and Targets
Table 1 – Mineral Resource Extension, Infill and Condemnation Results
Hole
ID |
Date
Reported |
From
(m) |
To
(m) |
Interval
(m) |
Cu
(%) |
Mo
(%) |
Au
(g/t) |
CuEq²
(%) |
Comments |
SLS-116 |
Nov 12, 2024
|
0 |
475 |
475 |
0.22 |
0.00 |
0.02 |
0.23 |
Southern sector - Infill / Extensional
|
Including |
|
12 |
108 |
96 |
0.41 |
0.00 |
0.02 |
0.42 |
|
Including |
|
12 |
252 |
240 |
0.29 |
0.00 |
0.02 |
0.31 |
|
SLS-115 |
|
0 |
469 |
469 |
0.23 |
0.00 |
0.03 |
0.25 |
Southern sector - Infill / Extensional
|
Including |
|
42 |
249 |
207 |
0.36 |
0.00 |
0.02 |
0.38 |
|
Including |
|
42 |
393 |
351 |
0.28 |
0.00 |
0.03 |
0.30 |
|
SLS-114 |
|
0 |
563 |
563 |
0.21 |
0.00 |
0.03 |
0.24 |
Southern sector - Infill / Extensional
|
Including |
|
63 |
563 |
500 |
0.24 |
0.00 |
0.03 |
0.26 |
|
Including |
|
96 |
165 |
69 |
0.49 |
0.00 |
0.02 |
0.50 |
|
Including |
|
96 |
309 |
213 |
0.31 |
0.00 |
0.02 |
0.33 |
|
SLS-113 |
|
0 |
656 |
656 |
0.17 |
0.00 |
0.03 |
0.19 |
Southern sector - Infill / Extensional
|
Including |
|
117 |
375 |
258 |
0.25 |
0.00 |
0.03 |
0.27 |
|
Including |
|
159 |
342 |
183 |
0.31 |
0.00 |
0.03 |
0.33 |
|
Including |
|
342 |
656 |
314 |
0.14 |
0.00 |
0.03 |
0.17 |
|
SLS-111 |
|
0 |
475 |
475 |
0.36 |
0.01 |
0.04 |
0.46 |
Central sector – infill
|
Including |
|
0 |
384 |
384 |
0.43 |
0.01 |
0.05 |
0.54 |
|
Including |
|
60 |
150 |
90 |
0.99 |
0.02 |
0.06 |
1.12 |
|
Including |
|
60 |
243 |
183 |
0.70 |
0.02 |
0.05 |
0.83 |
|
SLS-110 |
|
0 |
671 |
671 |
0.13 |
0.00 |
0.02 |
0.15 |
Southern sector - Infill / Extensional
|
Including |
|
117 |
303 |
186 |
0.22 |
0.00 |
0.02 |
0.24 |
|
Including |
|
117 |
671 |
554 |
0.14 |
0.00 |
0.02 |
0.16 |
|
SLS-108 |
|
0 |
513 |
513 |
0.48 |
0.02 |
0.04 |
0.63 |
Central sector – Infill
|
Including |
|
0 |
435 |
435 |
0.49 |
0.02 |
0.04 |
0.65 |
|
Including |
|
228 |
303 |
75 |
0.68 |
0.02 |
0.04 |
0.81 |
|
SLS-107 |
|
0 |
543 |
543 |
0.26 |
0.04 |
0.05 |
0.51 |
Northwest sector – Infill
|
Including |
|
0 |
96 |
96 |
0.62 |
0.03 |
0.09 |
0.82 |
|
Including |
|
0 |
147 |
147 |
0.42 |
0.04 |
0.08 |
0.68 |
|
Including |
|
204 |
543 |
339 |
0.23 |
0.04 |
0.04 |
0.47 |
|
SLS-106 |
|
0 |
230 |
230 |
0.18 |
0.03 |
0.04 |
0.39 |
Northwest sector – Infill
|
Including |
|
0 |
204 |
204 |
0.19 |
0.04 |
0.04 |
0.42 |
|
Including |
|
42 |
90 |
48 |
0.39 |
0.04 |
0.05 |
0.65 |
|
Including |
|
42 |
138 |
96 |
0.30 |
0.04 |
0.04 |
0.53 |
|
SLS-105 |
|
0 |
323 |
323 |
0.19 |
0.03 |
0.04 |
0.37 |
Northwest sector – Infill
|
Including |
|
0 |
210 |
210 |
0.22 |
0.04 |
0.04 |
0.45 |
|
Including |
|
42 |
111 |
69 |
0.37 |
0.05 |
0.04 |
0.68 |
|
SLSE-70 |
|
0 |
394 |
394 |
0.38 |
0.01 |
0.06 |
0.49 |
Eastern sector - Infill
|
Including |
|
24 |
99 |
75 |
0.60 |
0.01 |
0.05 |
0.71 |
|
Including |
|
24 |
210 |
186 |
0.44 |
0.02 |
0.05 |
0.56 |
|
Including |
|
210 |
394 |
184 |
0.35 |
0.01 |
0.07 |
0.47 |
|
SLSE-69 |
|
0 |
208 |
208 |
0.07 |
0.00 |
0.02 |
0.10 |
Eastern sector - Condemnation |
SLSE-64 |
|
0 |
391 |
391 |
0.10 |
0.00 |
0.02 |
0.14 |
Northeast sector - Infill / Extensional |
SLSE-63 |
|
0 |
251 |
251 |
0.09 |
0.00 |
0.03 |
0.12 |
Northeast sector - Condemnation |
SLSE-59 |
|
0 |
410 |
410 |
0.09 |
0.00 |
0.02 |
0.12 |
Northeast sector - Condemnation |
SLST-06 |
|
0 |
200 |
200 |
0.10 |
0.00 |
0.05 |
0.13 |
Southern sector - Infill |
SLST-05 |
|
0 |
400 |
400 |
0.10 |
0.00 |
0.03 |
0.13 |
Southern sector - Infill |
SLST-04 |
|
0 |
500 |
500 |
0.10 |
0.00 |
0.04 |
0.13 |
Southern sector - Infill |
Notes to Table 1: True widths are interpreted to be very close to drilled widths due to the bulk-porphyry style mineralized
zones at Warintza.
Table 2 - Collar Locations
Hole
ID |
Easting |
Northing |
Elevation
(m) |
Depth
(m) |
Azimuth
(degrees) |
Dip (degrees) |
SLS-116 |
800,241 |
9,647,745 |
1,710 |
475 |
243 |
-74 |
SLS-115 |
800,239 |
9,647,740 |
1,710 |
469 |
240 |
-46 |
SLS-114 |
800,235 |
9,647,740 |
1,709 |
563 |
66 |
-71 |
SLS-113 |
800,239 |
9,647,739 |
1,710 |
656 |
61 |
-48 |
SLS-111 |
800,385 |
9,648,301 |
1,411 |
475 |
117 |
-55 |
SLS-110 |
800,235 |
9,647,735 |
1,707 |
671 |
38 |
-54 |
SLS-108 |
800,383 |
9,648,303 |
1,411 |
513 |
180 |
-65 |
SLS-107 |
799,760 |
9,648,031 |
1,575 |
543 |
45 |
-60 |
SLS-106 |
799,567 |
9,648,148 |
1,402 |
230 |
233 |
-46 |
SLS-105 |
799,568 |
9,648,147 |
1,403 |
323 |
220 |
-60 |
SLSE-70 |
801,262 |
9,648,122 |
1,282 |
394 |
90 |
-87 |
SLSE-69 |
801,710 |
9,647,937 |
1,199 |
208 |
65 |
-62 |
SLSE-64 |
801,799 |
9,648,247 |
1,101 |
391 |
300 |
-50 |
SLSE-63 |
801,805 |
9,648,237 |
1,099 |
251 |
270 |
-76 |
SLSE-59 |
801,160 |
9,648,332 |
1,313 |
410 |
62 |
-68 |
SLST-06 |
800,210 |
9,647,529 |
1,601 |
200 |
90 |
-47 |
SLST-05 |
800,201 |
9,647,526 |
1,599 |
400 |
250 |
-60 |
SLST-04 |
800,207 |
9,647,528 |
1,600 |
500 |
0 |
-80 |
Notes to Table 2: The coordinates are in WGS84 17S Datum.
Endnotes
- Refer to the technical report entitled “Mineral Resource Estimate Update - NI 43-101 Technical Report,
Warintza Project, Ecuador” with an effective date of July 1, 2024 and available on SEDAR+ under the Company’s profile at www.sedarplus.ca
and on the Company’s website.
- Copper-equivalence grade calculation for reporting assumes metal prices of US$4.00/lb Cu, US$20.00/lb
Mo, and US$1,850/oz Au, and recoveries of 90% Cu, 85% Mo, and 70% Au based on preliminary metallurgical testwork. CuEq formula: CuEq (%)
= Cu (%) + 5.604 × Mo (%) + 0.623 × Au (g/t).
Technical Information and Quality Control & Quality Assurance
Sample assay results have been
independently monitored through a quality control/quality assurance (“QA/QC”) program that includes the insertion of blind
certified reference materials (standards), blanks and field duplicate samples. Logging and sampling are completed at a secure Company
facility located on site. Drill core is cut in half on site and samples are securely transported to ALS Labs in Quito. Sample pulps are
sent to ALS Labs in Lima, Peru and Vancouver, Canada for analysis. Total copper and molybdenum contents are determined by four-acid digestion
with AAS finish. Gold is determined by fire assay of a 30-gram charge. In addition, selected pulp check samples are sent to Bureau Veritas
lab in Lima, Peru. Both ALS Labs and Bureau Veritas lab are independent of Solaris. Solaris is not aware of any drilling, sampling, recovery
or other factors that could materially affect the accuracy or reliability of the data referred to herein. Heliborne magnetic, LIDAR and
other layers of data quality for Warintza district exploration were validated by a qualified external professional using data validation
procedures under high industry standards and the Company therefore did not require such data to be further verified by a “Qualified
Person” as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects. The remaining scientific
and technical information, including the drillhole data, has been verified by Jorge Fierro, M.Sc., DIC, PG, using data validation and
quality assurance procedures under high industry standards. The verification activities included a search for factual errors, completeness
of the lithological and assay data, and suitability of the primary data. As part of the database verification activities, the assay information
and certificates obtained directly from the analytical laboratory have been examined as well.
Qualified Person
The scientific and technical content of this press release has been reviewed and approved by Jorge Fierro, M.Sc., DIC,
PG, Vice President Exploration of Solaris who is a “Qualified Person” as defined in National Instrument 43-101 Standards
of Disclosure for Mineral Projects. Jorge Fierro is a Registered Professional Geologist through the SME (registered member #4279075).
On behalf of the Board of Solaris Resources Inc.
“Daniel Earle”
President & CEO, Director
For Further Information
Jacqueline Wagenaar, VP Investor Relations
Direct: 416-366-5678 Ext. 203
Email: jwagenaar@solarisresources.com
About Solaris Resources Inc.
Solaris is advancing a portfolio of copper and gold assets in the Americas, which includes a world class copper resource
with expansion and discovery potential at its Warintza Project in Ecuador; a series of grass roots exploration projects with discovery
potential in Peru and Chile; and significant leverage to increasing copper prices through its 60% interest in the La Verde joint-venture
project with a subsidiary of Teck Resources in Mexico.
Cautionary Notes and Forward-looking Statements
This document contains certain forward-looking information and forward-looking statements within the meaning
of applicable securities legislation (collectively “forward-looking statements”). The use of the words “will”
and “expected” and similar expressions are intended to identify forward-looking statements. These statements include statements
that planned meterage for its 2024 drilling program is now set to exceed 75,000m by the end of the year, drilling continues with nine
rigs primarily focused on extension and infill of the 2024 MRE, while also testing its connection to the Warintza West deposit, which
lies outside the MRE and could deliver significant growth in an expanded pit shell, construction continues on a further 7km of roads strategically
located to support future mining operations and access to the anticipated pre-stripping and drilling areas, process plant, WRF and TMF,
geotechnical and hydrogeological drilling, field testing, sampling and instrumentation programs are underway for the anticipated open
pit, WRF, process plant and internal infrastructure and expected to be completed by year-end, Knight Piésold Consulting is in the
process of completing engineering studies for the anticipated TMF and Water Permit, with the final reports expected to be completed in
the coming weeks to support the Environmental Impact Assessment review period, additional flotation tests being conducted with a focus
on reagent optimization for recovery improvement which is expected to be completed by year-end, Ausenco Engineering is working on the
process plant design and a preliminary flowsheet has been established, with prior test work returning high quality concentrates for copper
(gold) and molybdenum, drill results continue to build on the MRE, with holes SLS-111 and SLS-107 improving upon the modelled grade in
its vicinity, while holes SLS 110, SLS 113-116 and SLSE-64 encountered mineralization partially outside of the MRE in the southern and
northeastern sectors, and step-out exploration drilling to the northwest of the MRE testing its connection to the Warintza West deposit
has been completed with assays expected in the coming weeks, representing an opportunity for expansion of the MRE in an enlarged pit.
Although Solaris believes that the expectations reflected in such forward-looking statements and/or information are reasonable, readers
are cautioned that actual results may vary from the forward-looking statements. The Company has based these forward-looking statements
and information on the Company’s current expectations and assumptions about future events including assumptions regarding the exploration
and regional programs. These statements also involve known and unknown risks, uncertainties and other factors that may cause actual results
or events to differ materially from those anticipated in such forward-looking statements, including the risks, uncertainties and other
factors identified in the Solaris Management’s Discussion and Analysis, for the year ended December 31, 2023 available at www.sedarplus.ca.
Furthermore, the forward-looking statements contained in this news release are made as at the date of this news release and Solaris does
not undertake any obligation to publicly update or revise any of these forward-looking statements except as may be required by applicable
securities laws.
Photos accompanying this announcement are available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/27adaf0b-6dc1-411a-ab37-5e9b8bebd77f
https://www.globenewswire.com/NewsRoom/AttachmentNg/6a754d5d-7171-4c99-a715-d8a97e8537fb
Solaris Resources (AMEX:SLSR)
Gráfica de Acción Histórica
De Nov 2024 a Dic 2024
Solaris Resources (AMEX:SLSR)
Gráfica de Acción Histórica
De Dic 2023 a Dic 2024