Edf: EDF estimates higher nuclear power generation in France for 2024
02 Septiembre 2024 - 1:39PM
UK Regulatory
Edf: EDF estimates higher nuclear power generation in France for
2024
EDF estimates higher nuclear power
generation in France for 2024
Thanks to the good industrial performance of
France's nuclear fleet, EDF revises higher its estimate nuclear
power generation in France for 2024. Initially estimated between
315-345TWh, nuclear power generation is now estimated between
340-360TWh1.
This higher nuclear power generation estimate is
based on improved performance of outages and industrial control of
stress corrosion inspections and repair work, and the absence of
major climatic event during summer.
The Group has implemented the START2
2025 action plan aimed at improving the operational efficiency of
outages, since 2019. It covers various areas: industrialisation,
capitalisation, and standardisation of outages preparation methods,
a refined strategy for allocating resources and skills, including
the setting up of pooled teams and more employee training in
sensitive actions.
Since early 2024, eleven reactors have been
reconnected to the grid before the scheduled date.
About EDF
The EDF Group is a key player in the energy transition, as an
integrated energy operator engaged in all aspects of the energy
business: power generation, distribution, trading, energy sales and
energy services. The Group is a world leader in low-carbon energy,
with a low carbon output of 434TWh (1), a diverse generation mix
based mainly on nuclear and renewable energy (including
hydropower). It is also investing in new technologies to support
the energy transition. EDF’s raison d’être is to build a net
zero energy future with electricity and innovative solutions and
services, to help save the planet and drive well-being and economic
development. The Group supplies energy and services to
approximately 40.9 million customers (2) and generated consolidated
sales of €139.7 billion in 2023.
(1) See EDF’s 2024 URD sections 1.2.3, 1.3.2 and
3.1
(2) Customers are counted per delivery site. A customer may have
two delivery points.
1 Nuclear power generation estimated for its facilities
currently in service (Detailed information on the Flamanville 3
project on REMIT publication sites).
2 START: Let’s all ensure successful unit shutdowns
- PR-2024 Nuclear output estimate
Electricite de France SA... (EU:EDFBP)
Gráfica de Acción Histórica
De Ene 2025 a Feb 2025
Electricite de France SA... (EU:EDFBP)
Gráfica de Acción Histórica
De Feb 2024 a Feb 2025