09 April 2024
CENTRAL ASIA METALS
PLC
('CAML'
or the 'Company')
Q1 2024
Operations Update
Central Asia Metals plc (AIM: CAML) provides a
Q1 2024 operations update for the Kounrad dump leach, solvent
extraction and electro-winning ('SX-EW') copper recovery plant in
Kazakhstan ('Kounrad') and the Sasa zinc-lead mine in North
Macedonia ('Sasa').
Summary
-
Zero lost time injuries ('LTIs') at Kounrad or
Sasa
-
Kounrad copper production of 3,120 tonnes
-
Sasa zinc in concentrate production of 4,741
tonnes
-
Sasa lead in concentrate production of 6,529
tonnes
Outlook
-
Full year 2024 guidance
o Copper: 13,000
to 14,000 tonnes
o Zinc in
concentrate: 19,000 to 21,000 tonnes
o Lead in
concentrate: 27,000 to 29,000 tonnes
CAML production summary
Metal production (tonnes)
|
Q1
2024
|
Q1
2023
|
Copper
|
3,120
|
3,336
|
Zinc
|
4,741
|
4,917
|
Lead
|
6,529
|
6,618
|
Nigel Robinson, Chief Executive Officer, commented:
"We have had a good start to 2024
with no LTIs and a solid first quarter of production at both sites
despite some challenging winter weather conditions and the
continued construction activity on site at Sasa. We have made
significant progress towards the completion of the infrastructure
required to transition to paste fill mining and remain on track for
completion during H2 2024.
"Once the construction activity has
been completed it will enable the site team to focus on the
operational management of the transition to paste fill mining and
this will facilitate the higher levels of production planned for H2
2024.
"During the quarter, we were pleased
to have been able to announce our intention
to invest up to £5 million in Scottish copper and nickel explorer,
Aberdeen Minerals."
Health and Safety
In Q1 2024, there were no LTIs at
either Kounrad or Sasa.
Kounrad
Production and sales
update
Kounrad Q1 2024 copper production was 3,120
tonnes and copper sales during Q1 2024 were 2,998
tonnes.
Sasa
Production and sales
update
In Q1 2024, mined ore
and processed ore were 184,127 tonnes and 184,079
tonnes respectively. The average head grades for the period
were 3.00% zinc
and 3.75% lead. Q1 2024 metallurgical
recoveries were 85.9% for zinc and
94.7% for lead.
Sasa produces a zinc concentrate and a separate
lead concentrate. In Q1 2024,
9,494 tonnes of concentrate
containing
49.9% zinc and
9,177 tonnes of concentrate containing
71.1% lead were produced.
Sasa typically receives from smelters
approximately 84% of the value of its zinc in concentrate and
approximately 95% of the value of its lead in concentrate.
Accordingly, Q1 2024 payable production was 3,982 tonnes of zinc
and 6,202 tonnes of lead. Payable base metal in concentrate sales
for the quarter were 3,840 tonnes of zinc and 6,382 tonnes of
lead.
During Q1 2024, Sasa sold 89,933
ounces of payable silver to Osisko Gold Royalties, in accordance
with its streaming agreement.
|
Units
|
Q1 2024
|
Q1 2023
|
Ore
mined
|
t
|
184,127
|
196,503
|
Plant
feed
|
t
|
184,079
|
195,968
|
Zinc
grade
|
%
|
3.00
|
2.95
|
Zinc
recovery
|
%
|
85.9
|
85.2
|
Lead
grade
|
%
|
3.75
|
3.59
|
Lead
recovery
|
%
|
94.7
|
94.2
|
Zinc
concentrate
|
t (dry)
|
9,494
|
9,716
|
-
Grade
|
%
|
49.9
|
50.6
|
-
Contained
zinc
|
t
|
4,741
|
4,917
|
Lead
concentrate
|
t (dry)
|
9,177
|
9,282
|
-
Grade
|
%
|
71.1
|
71.3
|
-
Contained
lead
|
t
|
6,529
|
6,618
|
Capital projects - the transition to
paste fill mining
During Q1 2024, the Paste Backfill
Plant has operated consistently with the
ongoing placement of paste fill between the 990 and 910 metre
levels. The training of employees for long
hole stoping has also been completed.
The construction of the Dry Stack
Tailings Plant remains on track with dry commissioning and the
initial placement of filter cake on the engineered landform
scheduled for H2 2024.
A total of 2,894 metres of the
Central Decline have now been developed and connection to the 750
metre level is planned for Q4 2024.
For further
information contact:
Central Asia Metals
|
Tel: +44 (0) 20 7898 9001
|
Nigel Robinson
|
|
CEO
|
|
Gavin Ferrar
|
|
CFO
|
|
Louise Wrathall
|
louise.wrathall@centralasiametals.com
|
Director of
Corporate Development
|
|
Emma Chetwynd Stapylton
|
emma.chetwyndstapylton@centralasiametals.com
|
Investor
Relations Manager
|
|
|
|
Peel Hunt (Nominated Advisor and Joint
Broker)
|
Tel: +44 (0) 20 7418 8900
|
Ross Allister
|
|
David McKeown
Georgina Langoulant
|
|
|
|
BMO
Capital Markets (Joint Broker)
|
Tel: +44 (0) 20 7236 1010
|
Thomas Rider
|
|
Pascal Lussier Duquette
|
|
|
|
BlytheRay (PR
Advisors)
|
Tel: +44 (0) 20 7138 3204
|
Tim Blythe
|
|
Megan Ray
|
|
|
|
Note to editors:
Central Asia Metals, an AIM-listed UK company
based in London, owns 100% of the Kounrad SX-EW copper project in
central Kazakhstan and 100% of the Sasa zinc-lead mine in North
Macedonia. The CAML Exploration subsidiary was recently formed to
progress early exploration opportunities in Kazakhstan.
For further information, please
visit www.centralasiametals.com and
follow CAML on Twitter at @CamlMetals and on LinkedIn
at Central Asia Metals Plc