Bearing Announces October Dome Project Drill Results
03 Diciembre 2013 - 6:30PM
Marketwired
Bearing Announces October Dome Project Drill Results
VANCOUVER, BRITISH COLUMBIA--(Marketwired - Dec 3, 2013) -
Bearing Resources Ltd. ("Bearing", or the "Company")
(TSX-VENTURE:BRZ) is pleased to announce the drill results from the
Company's 2013 drill program at its 100% owned October Dome
copper-gold project, located 6 kilometres west of the town of
Likely, in the Cariboo Mining Division of British Columbia. The
October Dome copper-gold property forms part of Bearing's larger
landholdings in the area which are adjacent with both Imperial
Metals Corporation's Mount Polley porphyry copper-gold mine
property (10 kilometres to the south) and Barkerville Gold Mines
Ltd.'s QR skarn gold mine property (7 kilometres to the
northwest).
The 1,086 metre (6 hole) diamond drill program targeted the
northern end of a 4 kilometre long gold and arsenic soil anomaly
that is coincident with an induced polarization ("IP")
chargeability anomaly, some 1,200 to1,900 metres northwest of the
area drill tested in the 2012 drill pattern (see news release dated
November 8, 2012. Holes OD-5 through OD- 7 encountered diorite and
monzonite intrusions within hornfelsed sediments and propylitised
basalts. Alteration in the drill holes is pervasive, comprised of
intense propylitic alteration with pyrite, epidote and minor
chalcopyrite with elevated gold values throughout the holes. Hole
OD-6 encountered a 15 metre core length of massive magnetite skarn
with semi-massive pyrite layers accompanied by chalcopyrite,
epidote, and garnet at the sediment/basalt contact. A 9 metre
section of this skarn assayed 0.7 grams per tonne ("gpt") gold
("Au") including a 3 metre length that returned 1.3 gpt Au. Holes
OD-8 to OD-10 encountered similar altered rocks but returned no
significant intercepts.
Details of the recent drilling are presented below. Drill
intervals reported are core lengths and true widths for hole OD-6
are estimated to be 75% of core lengths. Other true widths are not
known. Collar locations are presented at the end of this
release.
Table 1: Significant Intersections |
|
Hole |
From (metres |
) |
To (metres |
) |
Core Length (metres |
) |
Gold (gpt |
) |
OD-5 |
76 |
|
80 |
|
4 |
|
1.1 |
|
OD-5 |
232 |
|
250 |
|
18 |
|
0.5 |
|
OD-6 |
98 |
|
100 |
|
2 |
|
5.2 |
|
OD-6 |
108 |
|
110 |
|
2 |
|
1.1 |
|
OD-6 |
210 |
|
219 |
|
9 |
|
0.7 |
|
Incl. |
212 |
|
215 |
|
3 |
|
1.3 |
|
The drill results from 2012 indicated an alkalic-style porphyry
copper-gold system in an area of extensive glacial till cover.
Drilling in 2013, in particular hole OD-6, encountered gold-rich
magnetite epidote skarn similar to that found in the nearby QR gold
deposit located 6 kilometres to the northwest. The target contact
remains open along strike and to depth.
QA/QC
NQ size drill core was largely sampled in two-metre intervals
with a manual core splitter except for a 36 metre run in hole OD-6
that was sampled in one-metre intervals. One-half of the core was
placed in sealed plastic bags and delivered to Acme Analytical
Laboratories Inc. ("Acme") in Vancouver for crushing and
pulverizing and then analysed following aqua regia digestion by
ICP-MS. As part of the company's QA/QC (quality assurance/quality
control) procedures, standards and blanks were inserted into the
sample batches. ACME is an ISO 9001-registered laboratory and has a
quality control program in place which includes the insertion of
standard, blank and duplicate samples, as well as conducting repeat
analyses. Field work and project management was under the direct
supervision of Robert Cameron, P.Geo., who is a qualified person
within the context of National Instrument 43-101. Robert Cameron
has read and takes responsibility for this news release.
Table 2: Drill Hole Locations (NAD83 Z10) |
|
Drill Hole |
Easting |
Northing |
Elevation (m |
) |
Length (m |
) |
Dip |
Azimuth |
OD-5 |
588234 |
5834421 |
877 |
|
250.0 |
|
-50 |
45 |
OD-6 |
587988 |
5834492 |
865 |
|
261.3 |
|
-50 |
40 |
OD-7 |
587988 |
5834492 |
865 |
|
121.0 |
|
-50 |
220 |
OD-8 |
588767 |
5834303 |
860 |
|
145.4 |
|
-60 |
320 |
OD-9 |
588767 |
5834303 |
860 |
|
157.6 |
|
-60 |
230 |
OD-10 |
589696 |
5833578 |
817 |
|
151.4 |
|
-60 |
225 |
BEARING RESOURCES LTD.
Robert Cameron, President & CEO
This news release includes certain "forward-looking statements"
under applicable Canadian securities legislation. Such
forward-looking statements or information, including but not
limited to, those drill results and their relation with respect to
potential future and exploration potential of anomalies and
properties involve known and unknown risks, uncertainties, and
other factors which may cause the actual results, performance or
achievements of Bearing to be materially different from any future
results, performance or achievements expressed or implied by such
forward-looking statements or information. Such factors include,
among others, the actual prices of commodities, the factual results
of current exploration, development and mining activities, changes
in project parameters as plans continue to be evaluated, as well as
those factors disclosed in documents filed from time to time with
the securities regulators in the applicable Provinces of British
Columbia and Alberta. Neither TSX Venture Exchange nor its
Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for
the adequacy or accuracy of this release.
Bearing Resources Ltd.Robert CameronPresident & CEO(604)
682-5546rcameronr@bearingresources.cawww.bearingresources.ca
Bearing Lithium (TSXV:BRZ)
Gráfica de Acción Histórica
De Nov 2024 a Dic 2024
Bearing Lithium (TSXV:BRZ)
Gráfica de Acción Histórica
De Dic 2023 a Dic 2024