Integra Resources Corp. (“Integra” or the “Company”) (TSXV:
ITR; NYSE American: ITRG) is pleased to announce that it
has filed a technical report (the “Report”) for the updated Mineral
Resource Estimate (“MRE”) at the DeLamar and Florida Mountain
Project (“DeLamar” or the “Project”) located in southwestern Idaho.
The MRE incorporates the results from the highly
successful stockpile drill program completed in April 2023. The
stockpile drill program added an Indicated resource of 504,000
ounces (“oz”) gold equivalent (“AuEq”)1 and an Inferred resource of
46,000 oz AuEq. Subject to further economic studies, the
mineralized stockpile and backfill material that was incorporated
into the updated MRE demonstrates the potential for this material
to significantly increase the heap leach mine life in future
production phases. The updated MRE increased the total heap
leachable oxide-and-mixed ounces within the Measured and Indicated
(“M&I”) category by ~25% and increased the total Inferred
ounces by ~31%. In total, ~90% of the updated MRE falls within the
M&I category, highlighting the quality and scarcity of projects
such as DeLamar in the prolific Great Basin mining district of the
USA.
DeLamar Technical Report
Highlights:
-
Including the 2023 DeLamar MRE, Integra now controls a
total M&I resource of 6.2 million ounces (“Moz”) AuEq and a
total Inferred resource of 0.9Moz AuEq across its key projects
located in Idaho and Nevada, representing one of the
largest resource endowments in the Great Basin of the USA not
controlled by a major mining company2.
-
Stockpile & Backfill Resource Update:
-
The maiden stockpile resource estimate contains an
Indicated resource of 504 thousand ounces (“koz”) AuEq at
0.37 grams per tonne (“g/t”) AuEq, including 296koz gold
(“Au”) and 16.1Moz silver (“Ag”) and an Inferred resource
of 46koz AuEq at 0.30 g/t AuEq, including 26koz Au and
1.5Moz Ag.
-
The Company allocated a total of ~US$4.6 million to the stockpile
drill program which successfully resulted in the addition of
>500kozs AuEq (M&I), representing the lowest discovery cost
per ounce in the history of DeLamar.
-
A portion of the mineralized stockpile and backfill material was
moved as a pre-stripping cost in the 2022 Pre-feasibility Study
(“PFS”), however this material is expected to be processed in
future economic studies. The stockpile and backfill material is
also expected to reduce the overall mining cost as the material is
located at surface and was previously mined, reducing or
eliminating additional blasting costs.
-
Total DeLamar and Florida Mountain Resource Update:
-
The total DeLamar M&I resource contains 4.8Moz AuEq at
0.60 g/t AuEq, including 2.9Moz Au and 142.7Moz Ag.
-
The total DeLamar Inferred resource contains 621koz AuEq at
0.45 g/t AuEq, including 428koz Au and 15.0Moz Ag.
-
Oxide-mixed Heap Leach Resource Update:
-
The oxide and mixed heap leach portion of the M&I
resource contains 2.6Moz AuEq at 0.50 g/t AuEq, including
1.6Moz Au and 73.9Moz Ag.
-
The oxide and mixed heap leach portion of the Inferred
resource contains 284koz AuEq at 0.36 g/t AuEq, including
199koz Au and 6.6Moz ounces Ag.
-
The significantly increased oxide and mixed resource at DeLamar
demonstrates the potential for an extended heap leach mine life in
future phases of operations.
-
The Company anticipates filing the Mine Plan of Operations
(“MPO”) for DeLamar in Q4 2023, making DeLamar one of the only
precious metal development projects in the Western United States
that is actively being advanced towards a production
permit.
Notes:
- AuEq = Au + (Ag / 77.7)
- Please reference the "Technical
Report Preliminary Economic Assessment for the Wildcat &
Mountain View Projects, Pershing and Washoe Counties, Nevada, USA",
dated July 30, 2023, with an effective date of June 28, 2023",
available under Integra's SEDAR+ profile at www.sedarplus.ca and
EDGAR profile at www.sec.gov.
Integra’s President, CEO & Director,
Jason Kosec commented: “The updated MRE at DeLamar
represents a significant milestone for the Company and further
solidifies Integra’s position as an industry leading exploration
and development company focused in the Great Basin. The highly
successful stockpile drill program increased the oxide-and-mixed
M&I resource at DeLamar by ~25%, validating the Company’s
belief that the mineralized stockpile and backfill material at
surface has the potential to significantly expand the heap leach
mine life in future phases of operation. The team is now focused on
finalizing the MPO for DeLamar which will be submitted in Q4 2023,
representing another important step toward the Company’s vision of
becoming a leading USA focused gold and silver producer.”
Table 1: 2023 DeLamar Project MRE: Measured,
Indicated and Inferred
Type |
Category |
Tonnes |
Au g/t |
Au oz |
Ag g/t |
Ag oz |
AuEq g/t |
AuEq oz |
Oxide |
Measured |
6,313,000 |
0.36 |
74,000 |
16.9 |
3,427,000 |
0.58 |
118,000 |
Indicated |
42,346,000 |
0.35 |
471,000 |
13.4 |
18,291,000 |
0.52 |
706,000 |
M&I |
48,659,000 |
0.35 |
545,000 |
13.9 |
21,718,000 |
0.53 |
825,000 |
Inferred |
11,132,000 |
0.28 |
99,000 |
7.8 |
2,795,000 |
0.38 |
135,000 |
|
|
|
|
|
|
|
|
|
Mixed |
Measured |
10,043,000 |
0.42 |
136,000 |
21.8 |
7,032,000 |
0.70 |
227,000 |
Indicated |
60,136,000 |
0.35 |
672,000 |
15.0 |
29,010,000 |
0.54 |
1,045,000 |
M&I |
70,179,000 |
0.37 |
808,000 |
16.5 |
36,042,000 |
0.58 |
1,272,000 |
Inferred |
8,533,000 |
0.27 |
74,000 |
8.4 |
2,302,000 |
0.38 |
104,000 |
|
|
|
|
|
|
|
|
|
Non-OxideDeLamar |
Measured |
16,541,000 |
0.54 |
288,000 |
38.1 |
20,249,000 |
1.03 |
549,000 |
Indicated |
48,608,000 |
0.45 |
710,000 |
26.4 |
41,292,000 |
0.79 |
1,241,000 |
M&I |
65,149,000 |
0.48 |
998,000 |
29.38 |
61,541,000 |
0.85 |
1,790,000 |
Inferred |
11,797,000 |
0.41 |
157,000 |
17.0 |
6,456,000 |
0.63 |
240,000 |
|
|
|
|
|
|
|
|
|
Type |
Category |
Tonnes |
Au g/t |
Au oz |
Ag g/t |
Ag oz |
AuEq g/t |
AuEq oz |
Non-OxideFlorida Mountain |
Measured |
4,515,000 |
0.39 |
57,000 |
13.4 |
1,949,000 |
0.56 |
82,000 |
Indicated |
16,878,000 |
0.43 |
233,000 |
9.9 |
5,348,000 |
0.56 |
302,000 |
M&I |
21,393,000 |
0.42 |
290,000 |
10.61 |
7,297,000 |
0.56 |
384,000 |
Inferred |
6,764,000 |
0.33 |
72,000 |
8.8 |
1,915,000 |
0.44 |
97,000 |
|
|
|
|
|
|
|
|
|
Stockpiles |
Measured |
- |
- |
- |
- |
- |
- |
- |
Indicated |
42,455,000 |
0.22 |
296,000 |
11.8 |
16,149,000 |
0.37 |
504,000 |
M&I |
42,455,000 |
0.22 |
296,000 |
11.8 |
16,149,000 |
0.37 |
504,000 |
Inferred |
4,877,000 |
0.17 |
26,000 |
9.8 |
1,535,000 |
0.30 |
46,000 |
|
|
|
|
|
|
|
|
|
Total Heap Leach |
Measured |
16,356,000 |
0.40 |
210,000 |
19.9 |
10,459,000 |
0.66 |
345,000 |
Indicated |
144,937,000 |
0.31 |
1,439,000 |
13.6 |
63,450,000 |
0.48 |
2,256,000 |
M&I |
161,293,000 |
0.32 |
1,649,000 |
14.3 |
73,909,000 |
0.50 |
2,600,000 |
Inferred |
24,542,000 |
0.25 |
199,000 |
8.4 |
6,632,000 |
0.36 |
284,000 |
|
|
|
|
|
|
|
|
|
Total Resources |
Measured |
37,412,000 |
0.46 |
554,000 |
27.2 |
32,657,000 |
0.81 |
974,000 |
Indicated |
210,424,000 |
0.35 |
2,381,000 |
16.3 |
110,091,000 |
0.56 |
3,798,000 |
M&I |
247,836,000 |
0.37 |
2,935,000 |
18.1 |
142,748,000 |
0.60 |
4,772,000 |
Inferred |
43,101,000 |
0.31 |
428,000 |
10.8 |
15,002,000 |
0.45 |
621,000 |
Notes:
- Mineral Resources that are not
Mineral Reserves do not have demonstrated economic viability.
- Michael Gustin, MDA a division of
RESPEC of Reno, Nevada, is a Qualified Person as defined in NI
43-101, is responsible for reporting Mineral Resources for DeLamar.
Mr. Gustin is independent of the Company.
- In-Situ Oxide and Mixed and
Stockpile Mineral Resources are reported at a 0.17 and 0.1 g/t AuEq
cut-off, respectively, in consideration of potential open-pit
mining and heap-leach processing.
- Non-Oxide Mineral Resources are
reported at a 0.3 g/t AuEq cut-off at DeLamar and 0.2 g/t AuEq at
Florida Mountain in consideration of potential open pit mining and
grinding, flotation, ultra-fine regrind of concentrates, and either
Albion or agitated cyanide-leaching of the reground
concentrates.
- The Mineral Resources are
constrained by pit optimizations set out in the Technical
Report.
- Gold equivalent grades were
calculated using the metal prices and recoveries presented in the
Technical Report.
- Rounding as required by reporting
guidelines may result in apparent discrepancies between tonnes,
grades, and contained metal content.
- The Effective Date of the MRE is
August 25, 2023.
- The estimate of Mineral Resources
may be materially affected by geology, environment, permitting,
legal, title, taxation, sociopolitical, marketing, or other
relevant issues.
The Report is titled “Technical Report for the
DeLamar and Florida Mountain Gold-Silver Project, Owyhee County,
Idaho, USA” and has been prepared in accordance with National
Instrument 43-101 – Standards of Disclosure for Mineral Projects
(“NI 43-101”). The key results from the Report were summarized in
the Company’s news release dated September 26, 2023. A copy of
the full Report is available on the Company’s website and
has been filed on SEDAR+ at www.sedarplus.ca and EDGAR
at www.sec.gov.
The results of the PFS on DeLamar included in
the technical report titled “Technical Report and Preliminary
Feasibility Study for the DeLamar and Florida Mountain Gold-Silver
project, Owyhee County, Idaho, USA” dated March 22, 2022 with an
effective date of January 24, 2022, remain unaffected by this MRE
update and have been included in the Report.
Sampling and QA/QC
Procedure
Thorough QA/QC protocols are followed on the
Project, including insertion of duplicate, blank and standard
samples in the assay stream for all drill holes. The samples are
submitted directly to American Assay Labs in Reno, Nevada for
preparation and analysis. Analysis of gold is performed using fire
assay method with atomic absorption finish on a 1 assay ton
aliquot. Gold results over 5 g/t are re-run using a
gravimetric finish. Silver analysis is performed using ICP for
results up to 100 g/t on a 5-acid digestion, with a fire
assay, gravimetric finish for results over 100 g/t silver.
Qualified Persons
The scientific and technical information
contained in this news release has been reviewed and approved by
Raphael Dutaut, Ph.D (P.Geo), Integra’s Vice President, Exploration
and Tim Arnold (PE, SME), Integra’s Chief Operating Officer. Both
individuals are “Qualified Persons” (“QP”) as defined in NI
43-101.
Michael Gustin, C.P.G., of RESPEC, Reno, Nevada
is an independent Qualified Person as defined by NI 43-101 and has
reviewed and approved the contents of this news release.
DeLamar Project Overview
The past producing DeLamar project, which
includes the adjacent DeLamar and Florida Mountain gold and silver
deposits, is located in Owyhee County in southwest Idaho. Since
acquiring the Project in 2017, the Company has demonstrated
significant resource growth and conversion while providing robust
economic studies in its maiden Preliminary Economic Assessment and
PFS. A copy of the full Report is available on the
Company’s website and has been filed on SEDAR+
at www.sedarplus.ca and EDGAR
at www.sec.gov.
About Integra Resources
Integra is one of the largest precious metals
exploration and development companies in the Great Basin of the
Western USA. Integra is currently focused on advancing its three
flagship oxide heap leach projects: the past producing DeLamar
Project located in southwestern Idaho and the Wildcat and Mountain
View Projects located in western Nevada. The Company also holds a
portfolio of highly prospective early-stage exploration projects in
Idaho, Nevada, and Arizona. Integra’s long-term vision is to become
a leading USA focused mid-tier gold and silver producer.
ON BEHALF OF THE BOARD OF
DIRECTORS
Jason KosecPresident, CEO and Director
CONTACT INFORMATION
Corporate Inquiries: ir@integraresources.comCompany website:
www.integraresources.comOffice phone: 1 (604) 416-0576
Forward Looking and Other Cautionary
Statements
Certain information set forth in this news
release contains “forward‐looking statements” and “forward‐looking
information” within the meaning of applicable Canadian securities
legislation and applicable United States securities laws (referred
to herein as forward‐looking statements). Except for statements of
historical fact, certain information contained herein constitutes
forward‐looking statements which includes, but is not limited to,
statements with respect to: the future financial or operating
performance of the Company and the Company’s mineral properties and
project portfolio; the results from work performed to date; the
estimation of mineral resources and reserves; the realization of
mineral resource and reserve estimates; the development,
operational and economic results of technical reports on mineral
properties referenced herein; magnitude or quality of mineral
deposits; the anticipated advancement of the Company’ mineral
properties and project portfolios including, but not limited to,
submission of MPO for DeLamar; exploration expenditures, costs and
timing of the development of new deposits; underground exploration
potential; costs and timing of future exploration; the completion
and timing of future development studies; estimates of
metallurgical recovery rates; exploration prospects of mineral
properties; requirements for additional capital; the future price
of metals; government regulation of mining operations;
environmental risks; the timing and possible outcome of pending
regulatory matters; timing and completion of technical reports; the
development, operational and economic results of the Preliminary
Economic Assessment for the Wildcat & Mountain View Projects
and the MRE for the DeLamar project; the realization of the
expected economics of mineral properties; future growth potential
of mineral properties; and future development plans.
Forward-looking statements are often identified
by the use of words such as “may”, “will”, “could”, “would”,
“anticipate”, “believe”, “expect”, “intend”, “potential”,
“estimate”, “budget”, “scheduled”, “plans”, “planned”, “forecasts”,
“goals” and similar expressions. Forward-looking statements are
based on a number of factors and assumptions made by management and
considered reasonable at the time such information is provided.
Assumptions and factors include: the Company’s ability to complete
its planned exploration programs; the absence of adverse conditions
at mineral properties; no unforeseen operational delays; no
material delays in obtaining necessary permits; the price of gold
remaining at levels that render mineral properties economic; the
Company’s ability to continue raising necessary capital to finance
operations; and the ability to realize on the mineral resource and
reserve estimates. Forward‐looking statements necessarily involve
known and unknown risks and uncertainties, which may cause actual
performance and financial results in future periods to differ
materially from any projections of future performance or result
expressed or implied by such forward‐looking statements. These
risks and uncertainties include, but are not limited to:
integration risks; general business, economic and competitive
uncertainties; the actual results of current and future exploration
activities; conclusions of economic evaluations; meeting various
expected cost estimates; benefits of certain technology usage;
changes in project parameters and/or economic assessments as plans
continue to be refined; future prices of metals; possible
variations of mineral grade or recovery rates; the risk that actual
costs may exceed estimated costs; geological, mining and
exploration technical problems; failure of plant, equipment or
processes to operate as anticipated; accidents, labour disputes and
other risks of the mining industry; delays in obtaining
governmental approvals or financing; the speculative nature of
mineral exploration and development (including the risks of
obtaining necessary licenses, permits and approvals from government
authorities); title to properties; and management’s ability to
anticipate and manage the foregoing factors and risks. Although the
Company has attempted to identify important factors that could
cause actual actions, events or results to differ materially from
those described in the forward-looking statements, there may be
other factors that cause actions, events or results not to be as
anticipated, estimated or intended. Readers are advised to study
and consider risk factors disclosed in Integra’s annual report on
Form 20-F dated March 17, 2023 for the fiscal year ended December
31, 2022, and Millennial Precious Metals Corp.’s management’s
discussion and analysis dated April 28, 2023 for the fiscal year
ended December 31, 2022.
There can be no assurance that forward‐looking
statements will prove to be accurate, as actual results and future
events could differ materially from those anticipated in such
statements. The Company undertakes no obligation to update
forward‐looking statements if circumstances or management’s
estimates or opinions should change except as required by
applicable securities laws. The forward-looking statements
contained herein are presented for the purposes of assisting
investors in understanding the Company’s plans, objectives and
goals, and may not be appropriate for other purposes.
Forward-looking statements are not guarantees of future performance
and the reader is cautioned not to place undue reliance on
forward‐looking statements. This news release also contains or
references certain market, industry and peer group data, which is
based upon information from independent industry publications,
market research, analyst reports, surveys, continuous disclosure
filings and other publicly available sources. Although the Company
believes these sources to be generally reliable, such information
is subject to interpretation and cannot be verified with complete
certainty due to limits on the availability and reliability of raw
data, the voluntary nature of the data gathering process and other
inherent limitations and uncertainties. The Company has not
independently verified any of the data from third party sources
referred to in this news release and accordingly, the accuracy and
completeness of such data is not guaranteed.
Cautionary Note for U.S. Investors
Concerning Mineral Resources and Reserves
NI 43-101 is a rule of the Canadian Securities
Administrators which establishes standards for all public
disclosure an issuer makes of scientific and technical information
concerning mineral projects. Technical disclosure contained in this
news release has been prepared in accordance with NI 43-101 and the
Canadian Institute of Mining, Metallurgy and Petroleum
Classification System. These standards differ from the requirements
of the U.S. Securities and Exchange Commission (“SEC”) and resource
information contained in this news release may not be comparable to
similar information disclosed by domestic United States companies
subject to the SEC's reporting and disclosure requirements.
Neither the TSX Venture Exchange nor its
Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for
the adequacy or accuracy of this release.
Integra Resources (TSXV:ITR)
Gráfica de Acción Histórica
De Nov 2024 a Dic 2024
Integra Resources (TSXV:ITR)
Gráfica de Acción Histórica
De Dic 2023 a Dic 2024