Evrima Plc Investee Update: Kalahari Key, Drill Programme Results
27 Abril 2023 - 11:03AM
UK Regulatory
TIDMEVA
27 April 2023
Evrima plc
("Evrima" or the "Company")
Investee Update: Kalahari Key, Molopo Farms Complex, Botswana - Programme
Results
Evrima plc, the investment issuer focused on structuring investment
transactions in the mining and junior exploration has received a project-level
update in respect of assay results, from the sole operator of Kalahari Key
Mineral Exploration Pty Limited ("Kalahari Key") and its Molopo Farms Complex
project ("MFC"), AIM-listed Power Metal Resources plc (AIM: POW).
Power Metal has today provided an update on the results of a 2,402m diamond
drill programme at the Molopo Farms Complex Project ("Molopo Farms" or the
"Project") targeting a large-scale nickel and platinum group element ("PGE")
discovery in southwestern Botswana.
The full update can here seen here:
https://www.londonstockexchange.com/news-article/POW/
molopo-farms-complex-botswana-programme-results/15933619
Key highlights from Power Metals are as follows:
* During the 2022/2023 diamond core drilling campaign Power Metal
successfully completed a total of 2,402.8m of drilling across five
drillholes targeting four individual target areas including:
* DDH1-6B (650.2m), DDH1-6B(2) (300.2m), DDH1-14B (519.1m), DDH1-3 (450.1m)
and DDH2-3 (483.2m).
* Drilling at all target areas (T1-6, T1-14, T1-3, T2-3) was designed to test
geophysical conductors identified by the time-domain electromagnetic
("TDEM") geophysics surveys completed by Power Metal earlier in 2022.
* Multiple drillholes successfully intersected mineralised pyroxenites which
returned anomalous precious metal (gold (Au) + platinum (Pt) + palladium
(Pd)) mineralisation including 2.3m @ 0.56 g/t Pt+Pd+Au & 0.17% Ni from
497.2m downhole, including 0.8m @ 0.81 g/t Pt+Pd+Au & 0.18% Ni from 498.7m
downhole, in drillhole DDH1-6B.
* Downhole electromagnetic ("EM") survey completed on drillhole DDH1-14B
indicates that the superconductor targeted lies beyond the depth of the
current end of hole (519m) at a projected downhole depth of approximately
610m. Conductivity depth imaging completed previously under-estimated the
depth to the central part of this conductor. DDH1-14B would therefore need
to be extended to intersect the superconductor target.
* The 2022/2023 results achieved for nickel and precious metals are in line
or exceed some of the highest results achieved from the minimal historical
exploration that has been completed within the Molopo Farms Complex, and
although these grades are currently not a levels permitting economical
extraction, they are very encouraging. A detailed overview of the geology,
historical exploration, and next steps are included in the body of this
release and interested parties are encouraged to read through the below
section in its entirety.
The Directors of Evrima accept responsibility for this announcement.
This announcement contains information which, prior to its disclosure, was
inside information as stipulated under Regulation 11 of the Market Abuse
(Amendment) (EU Exit) Regulations 2019/310 (as amended).
Ends -
Enquiries :
Company:
Burns Singh Tennent-Bhohi (CEO & Director): burns@evrimaplc.com
Simon Grant-Rennick (Executive Chairman): simon@evrimaplc.com
Novum Securities Limited (AQSE Corporate Adviser):
David Coffman / George Duxberry : + 44 (0) 20 7399 9400
END
(END) Dow Jones Newswires
April 27, 2023 12:03 ET (16:03 GMT)
Evrima (AQSE:EVA)
Gráfica de Acción Histórica
De Oct 2024 a Nov 2024
Evrima (AQSE:EVA)
Gráfica de Acción Histórica
De Nov 2023 a Nov 2024