AWS Launches Native 400G Direct Connect at CoreSite’s Silicon Valley and Northern Virginia Campuses
01 Octubre 2024 - 10:00AM
Business Wire
CoreSite Among Select Data Center Providers for
Initial Access
Ultra-High-Bandwidth and Low Latency to AWS
Regions
Ideal for Machine Learning (ML) and Large
Language Model (LLM) Training, Advanced Driver Assistance Systems
(ADAS) for Autonomous Vehicles
CoreSite, a leading hybrid IT solutions provider and subsidiary
of American Tower Corporation (NYSE: AMT) (“American Tower”), today
announced that AWS Direct Connect launched native 400 Gbps (400G)
Dedicated Connections at four select locations in the United States
including CoreSite’s Silicon Valley and Northern Virginia data
center campuses, making them the optimal locations to deploy the
most demanding hybrid applications. CoreSite’s Silicon Valley and
Northern Virginia markets are located near Amazon Web Services
(AWS) availability zones and provide customers with exceptional
network performance and low latency.
AWS Direct Connect provides private, high-bandwidth connectivity
between AWS and enterprises’ on-premises data centers, offices or
colocation facilities like CoreSite. Native 400G connections
provide higher bandwidth, without the operational overhead of
managing multiple 100G connections in a link aggregation group.
“CoreSite’s robust ecosystem of native cloud onramps and
scalable data center campuses offer a unique capability to
customers deploying hybrid applications,” said Juan Font, President
and CEO of CoreSite, SVP of American Tower. “The new 400G Direct
Connect from AWS is particularly beneficial to customer
applications that transfer large-scale datasets for large language
model training and real-time applications like advanced driver
assistance systems.”
CoreSite’s Silicon Valley data center campus provides scalable
colocation and networking options well-suited to meet the most
demanding business needs. With the addition of the new
240,000-square-foot, purpose-built data center SV9, which is
expected to be completed in the fourth quarter of 2024, the
company’s Silicon Valley campus will be comprised of nine
interconnected facilities and have 1.179 million total square feet
of data center space. SV9 has been certified as part of the NVIDIA
DGX-Ready Data Center program and will offer customers a prime
location to deploy an artificial intelligence (AI)-powered, 400G
solution.
As one of only two providers in Northern Virginia to offer
direct connections to all the major cloud providers, CoreSite’s
Northern Virginia campus includes three interconnected data centers
totaling more than 1.3 million square feet and a dense ecosystem
ideal for maximizing the value of hybrid IT strategies.
To learn more about AWS Direct Connect, visit AWS Direct Connect
Locations.
Additional Resources
- Watch What is Cloud Direct Connection and How Can It Support
Your Hybrid IT Strategy
- Read more about AWS Direct Connect at CoreSite
- Download The 2024 State of the Data Center Report to see
industry trends and insights from IT leaders
About CoreSite
CoreSite, an American Tower company (NYSE: AMT), provides hybrid
IT solutions that empower enterprises, cloud, network and IT
service providers to monetize and future-proof their digital
business. Our highly interconnected data center campuses offer a
native digital supply chain featuring direct cloud onramps to
enable our customers to build customized hybrid IT infrastructure
and accelerate digital transformation. For more than 20 years,
CoreSite’s team of technical experts has partnered with customers
to optimize operations, elevate customer experience, dynamically
scale, and leverage data to gain competitive edge. For more
information, visit CoreSite.com and follow us on LinkedIn and
X.
Forward-Looking Statements
This press release contains statements about future events and
expectations, or “forward-looking statements,” all of which are
inherently uncertain. We have based those forward-looking
statements on management’s current expectations and assumptions and
not on historical facts. These forward-looking statements involve a
number of risks and uncertainties. For important factors that may
cause actual results to differ materially from those indicated in
our forward-looking statements, we refer you to the information set
forth under the caption “Risk Factors” in Item 1A of American
Tower’s most recent annual report on Form 10-K, and other risks
described in documents American Tower subsequently files from time
to time with the Securities and Exchange Commission. Neither we nor
American Tower undertake any obligation to update the information
contained in this press release to reflect subsequently occurring
events or circumstances.
View source
version on businesswire.com: https://www.businesswire.com/news/home/20241001129994/en/
Megan Ruszkowski Vice President of Marketing
and Sales Development 720-446-2014
Megan.Ruszkowski@CoreSite.com
American Tower (NYSE:AMT)
Gráfica de Acción Histórica
De Oct 2024 a Nov 2024
American Tower (NYSE:AMT)
Gráfica de Acción Histórica
De Nov 2023 a Nov 2024