RKMKE
1 semana hace
As a result of the foregoing, the net loss for the nine months ended September 30, 2024, was $2,041,882 as compared to the net loss of $2,462,799 during the nine months ended September 30, 2023.
Graber grabbing $$$$
LawgInn2024
2 meses hace
Here is OUR OPINION. There are MANY flaws in several of the statements below. First, the company will have no choice but to do the 1-5 reverse split that they have filed for, resulting in the OS going from 11.6 million to 2.6 million. If, by chance, the S-1 is even remotely successful (and that's a BIG IF), it will create MASSIVE, historical, sweeping dilution to existing and pre-raise shareholders. In addition, it appears that there are a significant number of convertibles that will induce even more painful dilution. There is SO much paper out there it's tough even to imagine the amount of dilution ahead, could be millions and millions, we can't keep track of the prinitng press anymore. In our opinion, this stock is uninvestable until the equity cap table is thoroughly flushed, they have the required working capital to execute, which could take years. This goes without saying that the "executive team", has to go as soon as possible and be replaced with professionals that know what they are doing and that have a history of success...the current group has neither. The last SPAC deal was terminated once they realized who would be at the wheel of this thing, from what we heard. These significant challenges (and there are many, many, many more) don't even take into consideration that the shine is off the lithium market. We have an oversupply and there's no indication that there's a meaningful amount of lithium in the BLTH claims and that these guys can extract it profitably. This is a 2026-27 story at best, if it ever even gets off the ground. In the meantime, in our opinion, this stock is untouchable and should be avoided...run, run, run...run away.
RKMKE
2 meses hace
A grant of discretionary authority to the Board of Directors or the executive officers of the Company to implement a reverse stock split of the outstanding shares of Common Stock on the basis of one post-reverse split share for up to every five (5) pre-reverse split shares (for example, if you own 5 shares now, you will own 1 share after the reverse stock split) to occur as soon as practicable, but in no event later than 120 days after the date of this Information Statement, with the exact time of the reverse stock split and the exchange ratio of the reverse split to be determined by the Board of Directors or the executive officers of the Company. A proposed 1-for-5 reverse stock split of the outstanding shares of Common Stock would reduce the outstanding shares of Common Stock from approximately 11.6 million shares to 2.3 million shares.
2. The filing of a Certificate of Amendment of the Certificate of Incorporation that will decrease the authorized number of shares of the Company’s Common Stock to One Hundred Million (100,000,000) shares.
3. The adoption of the Company’s 2024 Incentive Compensation Plan, under which 4,000,000 shares of common stock will be reserved for issuance thereunder.
https://www.sec.gov/Archives/edgar/data/1487718/000149315224036977/formpre14c.htm
exisnet
3 meses hace
PROSPECTUS SUMMARY
...In order to achieve our current objectives at the Lisbon Valley Lithium Project, our estimated pre-production phase timelines and significant milestones include (i) the processing and approval by the BLM during the third quarter of 2024 of our exploration permits to drill, (ii) the commencement of drilling exploration wells by the end of 2024, (iii) the preparation of our Regulation S-K Subpart 1300 technical report on our exploration results in late-2024, (iv) the selection of a DLE technology provider in early 2025, (v) the development and building of a pilot lithium extraction plant in the first half of 2025, and (vi) the commencement of drilling production wells by the end of 2025. Our production phase, which primarily includes the building of a permanent lithium extraction plant, is estimated to begin in 2026.
FORM S-1
exisnet
3 meses hace
In SEC filings, I'm not aware any drilling permit date change... Current filings:
We filed our initial applications in August 2023 with the UDOGM and the BLM. We received tentative UDOGM approval in April 2024. Conditions to obtaining final UDOGM approval include the completion of the review for the requirements of the National Environmental Policy Act (the “NEPA review”) by the BLM, the BLM’s concurrence on the amount of the surety bond that is required, our company paying the surety bond amount and providing additional requested information. The NEPA review, BLM’s concurrence on the amount of the surety bond, and the approval from the BLM are currently pending. It is anticipated that it will take 300 to 360 days for approval to drill once the initial application is filed and under review by each agency. The flow charts below outline the permit process for exploration of minerals (lithium well drilling), which is regulated by the UDOGM and the BLM.
insert-text-here