Goldrush Resources Ltd. (TSX VENTURE:GOD)(OTCQX:GDRRF) ("Goldrush" or the
"Company") is pleased to announce the results of the initial Ouavousse permit
drilling on seven previously identified gold bearing areas. The program
consisted of a 30 hole, 2,820 metre reverse circulation ("RC") drilling program
on the 244 square kilometer permit in central Burkina Faso, West Africa, and
highlighted the Kooligri South area for detailed evaluation. Highlights of the
drilling results include:




--  5.01 g/t Au over 5 metres, in RC hole OUKR11-029, including 20.1 g/t Au
    (vg) over 1.0 metres. 
--  8.67 g/t Au over 2 metres, in RC hole OUKR11-001 
--  1.07 g/t Au over 4 metres, in RC hole OUKR11-006 



Commenting on the drill results, Goldrush President and CEO Len Brownlie said:
"In only 30 holes of the first drilling carried out on the Ouavousse permit,
Goldrush has successfully discovered an open mineralized structure over a strike
length of 160 metres at the Kooligri South artisanal site where the highest
grade intersection occurs in the northeastern most hole (-029) and is open in
all directions. This part of the Ouavousse permit has been added to the
Company's list of attractive targets for follow-up exploration. A program of
mapping and soil sampling is currently underway to assist in the delination of
additional drill targets."


It is noteworthy that the Ouavousse permit is immediately west of, and crossed
in part, by the interpreted corridor of the Markoye Fault, a major NNE trending
structural zone (and possible Porcupine-Destor Fault analogue). The Markoye
Fault corridor which has been traced for over 400 kilometres in Burkina Faso and
lies adjacent to several substantial gold deposits, including Iamgold's Essakane
mine, High River Gold's Taparko mine, Volta's Kiaka gold deposit, and Orezone's
Bombore project.


RC holes -027, -028 and -029 were drilled on 80 metre centres at the Kooligri
South artisanal site. All three holes intersected the mineralized structure
consisting of quartz veining hosted in a deformed, silicified granodiorite with
pyritized vein selvages. At 650 metres north of Kooligri South, RC hole
OUKR11-030 intersected 1.09 g/t Au over 3 metres, with quartz veining hosted in
a strongly deformed sericitized schist. Previous rock sampling (two samples)
from this Kooligri North site had produced a best value of 1.58 g Au/t, while
seven samples from Kooligri South had returned a high value of 9.77 g Au/t. 


The remaining 26 exploration holes drilled on six additional orpailleur
(artisanal mining) sites (Ouavousse North, Ouavousse South, OTR 1, Poessin 1,
Poessin 2 and Poessin 3) intersected generally short, lower grade sections from
areas which had been quite substantially pitted by the orpailleurs.


Assay Results

Significant intersections are noted above and in the following table:



----------------------------------------------------------------------------
                                                Total            Inter-     
HOLE ID     X-WGS84 Y-WGS84      Target Azimuth Depth  From  To    val    Au
----------------------------------------------------------------------------
                                                   (m)   (m) (m)    (m)  g/t
----------------------------------------------------------------------------
OUOR11-001   767621 1417348 OUAVOUSSE S       5   133    13  14      1  0.72
----------------------------------------------------------------------------
and                                                      40  41      1   0.8
----------------------------------------------------------------------------
and                                                      85  87      2  8.67
----------------------------------------------------------------------------
and                                                      92  93      1  0.69
----------------------------------------------------------------------------
OUOR11-004   767562 1417459 OUAVOUSSE S     185    91    50  51      1  0.68
----------------------------------------------------------------------------
and                                                      59  60      1  1.08
----------------------------------------------------------------------------
OUOR11-006   768757 1417821       OTR 1     325    81    54  58      4  1.07
----------------------------------------------------------------------------
OUOR11-009   767764 1417681 OUAVOUSSE N       5   127    44  46      2  1.13
----------------------------------------------------------------------------
and                                                      57  58      1  1.53
----------------------------------------------------------------------------
and                                                      88  89      1  0.58
----------------------------------------------------------------------------
OUOR11-011   767692 1417694 OUAVOUSSE N       5   110    19  20      1  1.01
----------------------------------------------------------------------------
and                                                      51  52      1  0.95
----------------------------------------------------------------------------
OUOR11-013   767536 1417688  OUVOUSSE N       5    97    49  50      1  1.73
----------------------------------------------------------------------------
OUPR11-018   761321 1420045   POESSIN-2     340   110    40  41      1  3.34
----------------------------------------------------------------------------
OUPR11-023   761011 1420224   POESSIN-3     340    80    12  13      1  0.52
----------------------------------------------------------------------------
and                                                      16  18      2  0.88
----------------------------------------------------------------------------
OUPR11-024   760936 1420195   POESSIN-3     340    80    13  16      3  0.97
----------------------------------------------------------------------------
OUPR11-025   760869 1420148   POESSIN-3     340    80    21  24      3  1.14
----------------------------------------------------------------------------
OUKR11-027   761287 1425093  KOOLIGRI S     165   102    63  64      1  1.08
----------------------------------------------------------------------------
and                                                      69  70      1   0.9
----------------------------------------------------------------------------
OUKR11-028   761362 1425131  KOOLIGRI S     165   100    82  83      1  2.78
----------------------------------------------------------------------------
and                                                      91  92      1  0.83
----------------------------------------------------------------------------
OUKR11-029   761440 1425142  KOOLIGRI S     165    97    74  79      5  5.01
----------------------------------------------------------------------------
including                                                77  78      1  20.1
----------------------------------------------------------------------------
and                                                      84  89      5  0.78
----------------------------------------------------------------------------
OUKR11-030   761458 1425823  KOOLIGRI N     165    80    23  26      3  1.09
----------------------------------------------------------------------------



All holes were drilled at an inclination of -60 degrees. True widths are unknown
at this time. A total of 2,820 metres were drilled in the 30 RC holes which were
continuously sampled at one metre intervals for assaying.


Quality Assurance/Quality Control

Goldrush maintains a rigorous quality control program involving the use of
certified standards from an accredited Canadian laboratory, inserted blanks, and
the use of repeat assays. Details of Goldrush's quality control program were
provided in the Company's News Release #2010-13, dated October 25, 2010.


The SGS laboratory in Ouagadougou, Burkina Faso was used for sample analysis.
Samples are assayed using standard fire assay techniques on a 50 gram charge
with an atomic absorption finish. For its internal control, SGS inserted two
certified standards and one blank, and analyzed one random duplicate for
approximately each 25 samples submitted. For its certified standard and blank
samples included in the QA-QC procedure, Goldrush averaged 11.5% of the total
samples submitted.


The RC drilling was contracted to Forages Technic-Eau/Burkina sarl based in
Ouagadougou, Burkina Faso.


Mr. Driffield Cameron, P. Geo., Vice President, Exploration of Goldrush, is the
Qualified Person for this press release for the purposes of National Instrument
43-101 and has reviewed the technical information herein.


About Goldrush: Goldrush is a Canadian mineral exploration company which has
successfully focused on gold exploration in West Africa, where the company has
discovered, and is currently expanding and defining the 249,000 ounce (inferred
resource of 5.9 million tones at a grade of 1.31 g/t Au) Ronguen gold deposit in
Burkina Faso.


For further information on Goldrush Resources Ltd., shareholders and other
interested parties are invited to visit the Company's website at
www.goldrushresources.ca.


ON BEHALF OF THE BOARD OF DIRECTORS, 

GOLDRUSH RESOURCES LTD. 

Len Brownlie, President and Chief Executive Officer

FORWARD-LOOKING STATEMENTS: This news release contains certain "forward-looking
statements" within the meaning of Section 21E of the United States Securities
Exchange Act of 1934, as amended. Except for statements of historical fact
relating to the company, certain information contained herein constitutes
forward-looking statements. Forward-looking statements are frequently
characterized by words such as "plan", "expect", "project", "intend", "believe",
"anticipate", "estimate" and other similar words, or statements that certain
events or conditions "may" or "will" occur. Forward-looking statements are based
on the opinions and estimates of management at the date the statements are made,
and are subject to a variety of risks and uncertainties and other factors that
could cause actual events or results to differ materially from those projected
in the forward-looking statements. These factors include the inherent risks
involved in the exploration and development of mineral properties, the
uncertainties involved in interpreting drilling results and other geological
data, fluctuating metal prices, the possibility of project cost overruns or
unanticipated costs and expenses, uncertainties relating to the availability and
costs of financing needed in the future and other factors. The Company
undertakes no obligation to update forward-looking statements if circumstances
or management's estimates or opinions should change. The reader is cautioned not
to place undue reliance on forward-looking statements.


Goldrush Resources Ltd. (TSXV:GOD)
Gráfica de Acción Histórica
De May 2024 a Jun 2024 Haga Click aquí para más Gráficas Goldrush Resources Ltd..
Goldrush Resources Ltd. (TSXV:GOD)
Gráfica de Acción Histórica
De Jun 2023 a Jun 2024 Haga Click aquí para más Gráficas Goldrush Resources Ltd..