Critical Elements Corporation (TSX VENTURE:CRE)(OTCQX:CRECF)(FRANKFURT:F12) ("Critical Elements") is pleased to announce the most recent results of summer exploration work on its Rose tantalum-lithium project. The work done during the brief 15-day prospecting program identified at least five new zones that returned grades of up to 806 ppm Ta2O5and 2.27% Li2O in grab samples. All samples were taken from an area of approximately 10 square kilometres, at spacings of from a few metres to a few kilometres. The most significant results are shown in the table below. (Grab samples are selective by nature and are unlikely to represent average grades of the deposits).

UPDATE

Prefeasibility Study:

The Company also wishes to provide an update on the ongoing prefeasibility study. A Lidar airborne topographic study is now underway. This survey will be very useful in the final assessment of where to locate the various elements of the mine site, as well as for the impact study. The Company has also retained Les services d'ingenierie Mine-Concept to carry out a geotechnical study on the entire deposit and mine site. Six oriented core holes (630 metres of drilling) have been drilled to carry out various geotechnical tests (constraints, fracture orientation, etc.). These tests will all be incorporated into the final prefeasibility study, scheduled for completion at the end of the fourth quarter.

Impact Study:

The Company confirms that it has filed a notice of project with the environment ministry and the COMEV regarding its intention to open and operate a mine producing 1,500,000 tonnes per year, with an initial resource of 26,500,000 tonnes, an expected mine life of 20 years and production of approximately 225,000 tonnes per year of spodumene (lithium oxide, Li2O) concentrate to produce 30,000 tonnes per year of lithium carbonate (Li2CO3). The final figures will be determined by under the prefeasibility study. The environmental impact study will be completed during the month of September 2012 under the supervision of Genivar, a Montreal-based engineering firm.

The best results obtained from the summer exploration program on the Rose tantalum-lithium project are:


Sample       Li  Li2O      Sample       Ta Ta205      Sample       Ta  Ta205
          (ppm)    (%)               (ppm) (ppm)                (ppm)  (ppm)
----------------------------------------------------------------------------
                                                                            
286213    10550   2.27     286420      660    806     286369      130    159
----------------------------------------------------------------------------
286212     9780   2.11     286322      500    611     286206      120    147
----------------------------------------------------------------------------
286361     8920   1.92     286320      370    452     286307      120    147
----------------------------------------------------------------------------
286318     8840   1.90     286203      290    354     286404      120    147
----------------------------------------------------------------------------
286359     8370   1.80     286205      290    354     286314      110    134
----------------------------------------------------------------------------
286314     7770   1.67     286367      290    354     286372       99    121
----------------------------------------------------------------------------
286215     7030   1.51     286212      280    342     286210       96    117
----------------------------------------------------------------------------
286363     6690   1.44     286216      280    342     286315       96    117
----------------------------------------------------------------------------
286201     6530   1.41     286218      270    330     286363       96    117
----------------------------------------------------------------------------
286232     6190   1.33     286204      250    305     286311       95    116
----------------------------------------------------------------------------
286364     6020   1.30     286309      240    293     286201       93    113
----------------------------------------------------------------------------
286315     5840   1.26     286354      240    293     286365       91    112
----------------------------------------------------------------------------
286202     5570   1.20     286208      220    269     286355       90    110
----------------------------------------------------------------------------
286312     4320   0.93     286371      210    256     286209       90    110
----------------------------------------------------------------------------
286204     4250   0.92     286202      200    244     286312       89    108
----------------------------------------------------------------------------
286214     4100   0.88     286418      190    232     286214       83    101
----------------------------------------------------------------------------
286305     3630   0.78     286419      190    232     286373       77     94
----------------------------------------------------------------------------
286233     3540   0.76     286213      170    208     286313       76     93
----------------------------------------------------------------------------
286206     3480   0.75     286230      170    208     286349       75     92
----------------------------------------------------------------------------
286319     3390   0.73     286302      170    208                           
------------------------------------------------------                      
286313     3260   0.70     286366      170    208                           
------------------------------------------------------                      
286306     2980   0.64     286301      160    195                           
------------------------------------------------------                      
286365     2280   0.49     286215      150    183                           
------------------------------------------------------                      
286360     1720   0.37     286346      150    183                           
------------------------------------------------------                      
286368     1500   0.32     286217      140    171                           
------------------------------------------------------                      
286211     1240   0.27     286306      140    171                           
------------------------------------------------------                      
286404     1200   0.26     286321      130    159                           
------------------------------------------------------                      
286310      940   0.20     286341      130    159                           
------------------------------------------------------                      
286205      860   0.19     286361      130    159                           
------------------------------------------------------                      
286203      780   0.17                                                      
------------------------------------------------------                      
                                                                            
- Grab samples are selective by nature and are unlikely to represent average
grades of the deposits.                                                     

"I am really very pleased, because these latest results once again show the strong potential for substantially increasing the tantalum and lithium resource at the Rose project," said Jean-Sebastien Lavallee, President and Chief Executive Officer of Critical Elements Corporation.

ABOUT CRITICAL ELEMENTS CORPORATION

Critical Elements is actively developing its 100%-owned Rose lithium-Tantalum flagship project in Quebec. The project hosts a current new NI 43-101 compliant Indicated resource of 26.5 million tonnes of 1.30% Li2O Eq. or 0.98% Li2O and 163 ppm Ta2O5and Inferred resource of 10.7 million tonnes of 1.14% Li2O Eq. or 0.86% Li2O and 145 ppm Ta2O5.

Critical Elements has commissioned a prefeasibility study for the project from Genivar, one of the largest independent engineering firms in Canada. Genivar is also doing an environmental study, and Acme Metallurgical Ltd. of Vancouver is carrying out project metallurgy.

Critical Elements' portfolio also includes rare-earth and tantalum-niobium projects in the Rocky Mountains of British Columbia and in Quebec, as well as a 50% interest in the Croinor project, which is located in Quebec and hosts a current NI 43-101-compliant measured and indicated resource of 814,228 tonnes at 9.11 g/t Au, for 238,414 ounces of gold at a 5 g/t cut-off.

Jean-Sebastien Lavallee (OGQ #773), geologist, shareholder and president and chief executive officer of the Company and a Qualified Person under NI 43-101, has reviewed and approved the technical content of this release.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts: Critical Elements Corporation shareholders: Jean-Sebastien Lavallee, P.Geo. President and CEO 819 824-2425president@cecorp.cawww.cecorp.ca Paradox Public Relations Jean-Francois Meilleur 514-341-0408

Critical Elements Lithium (QX) (USOTC:CRECF)
Gráfica de Acción Histórica
De May 2024 a Jun 2024 Haga Click aquí para más Gráficas Critical Elements Lithium (QX).
Critical Elements Lithium (QX) (USOTC:CRECF)
Gráfica de Acción Histórica
De Jun 2023 a Jun 2024 Haga Click aquí para más Gráficas Critical Elements Lithium (QX).