Valero Corpus 340.0 Complex 1, 3 and 6 Units re- March 11
Christi starting March 11; maintenance
began on Feb. 26.
20,000-b/d FCCU in East n/a
Plant shut; West Plant
50,000-b/d FCCU at reduced
rates since mid-Dec for
economic reasons.
36,000-b/d HCU in West Plant March
restarted, Co. said March 16,
after about 18 days of work
delayed from Feb.
Valero Norco, LA 250.0 Entire plant resumed normal March 19
the Co. said March 19, follow-
ing plantwide turnaround since
early Feb.
Upgrade project to build 2012
a new diesel hydrotreater
unit moved from 2010 to
4Q 2012.
Valero Port Arthur 325.0 FCCU at planned rates after
Tx work lasting about 44 days, Co.
said March 15.
Hydrocracker turnaround lasting
38 days has begun, Co. said
March 15.
77,000-b/d FCCU at reduced n/a
rates since mid-Dec for
economic reasons.
45,000 b/d HCU to undergo Spring
38 days of work in March.
Valero Sunray, TX 170.0 55,000-b/d FCCU at reduced n/a
rates since mid-Dec for
economic reasons.
Valero Texas City 245.0 Repaired an exchanger leak
TX found in the alkylation unit
located at Complex 2, Co.
said March 15.
MIDWEST
BP Toledo, OH 155.0 $400 million upgrade 2012
to start 2010.
Valero Memphis, TN 195.0 Plant will completely restart End
by end-April after over-haul of April
FCCU, alkylation unit. The plant
has been off-line since March 14.
Marathon Catlettsburg 226.0 Turnaround maintenance at un- n/a
KY specified units starts March
10. No restart estimate.
ROCKY MOUNTAIN
Western Bloomfield, 16.8 Co. announced plans Nov. 9
NM to idle plant and shift
production to Gallup plant.
Suncor Commerce 93.0 No. 2 Crude unit will shut for Mar 3
City, CO planned maintenance on Feb 28;
restart on Mar 3.
No. 1 Crude unit will shut for Mar 22
planned maintenance on Mar 6;
restart Mar 22.
Cryo Unit will shut for planned Apr 4
maintnenance Mar 20; restart
April 4.
Planned work at reformer unit Fall
deferred to Fall 2010 from Feb 2010
28 start date.
Tesoro Salt Lake 58.0 Major turnaround work will
City, Utah begin in 1Q 2010, the Co. said
on Feb 3.
Tesoro Mandan, N.D. 60.0 Planned turnaround will 2Q
begin 2Q 2010, the Co. said
on Feb 3.
Frontier Cheyenne 52.0 Production expected to be
Co fall by 4,800 b/d to 35,000 b/d
for February, Co. reported Feb. 8.
WEST COAST
Exxon Torrance, CA 150.0 40-day turnaround on 100,000-
b/d FCCU and alkylation unit
beginning first week of March,
trading and marketing sources
said Feb. 11.
Conoco Rodeo, CA 120.0 Start-up of a process unit caused
flaring, a March 12 filing said.
Tesoro Golden Eagle 166.0 Turnaround work began in early n/a
Martinez, Dec at FCCU and alkylation
CA unit, the Co. said on Feb 3.
Restart timing unclear.
Other major turnaround mainte- 2011
nance deferred to 2011 from
late 2009, the Co. said Feb 3.
Tesoro Oahu, HI 94.0 Planned turnaround work will
Kapolei begin 3Q, 2010, the Co. said
on Feb 3.
Order free Annual Report for BP plc
Visit http://djnewswires.ar.wilink.com/?link=BP or call
1-888-301-0513
Order free Annual Report for ConocoPhillips
Visit http://djnewswires.ar.wilink.com/?link=COP or call
1-888-301-0513
Order free Annual Report for Hess Corporation
Visit http://djnewswires.ar.wilink.com/?link=HES or call
1-888-301-0513
Order free Annual Report for Holly Corp.
Visit http://djnewswires.ar.wilink.com/?link=HOC or call
1-888-301-0513
Order free Annual Report for Marathon Oil Corporation
Visit http://djnewswires.ar.wilink.com/?link=MRO or call
1-888-301-0513
Order free Annual Report for Suncor Energy Inc.
Visit http://djnewswires.ar.wilink.com/?link=SU or call
1-888-301-0513
Order free Annual Report for Tesoro Corporation
Visit http://djnewswires.ar.wilink.com/?link=TSO or call
1-888-301-0513
Order free Annual Report for Exxon Mobil Corporation
Visit http://djnewswires.ar.wilink.com/?link=XOM or call
1-888-301-0513
Order free Annual Report for BP plc
Visit http://djnewswires.ar.wilink.com/?link=BP or call
1-888-301-0513
Order free Annual Report for ConocoPhillips
Visit http://djnewswires.ar.wilink.com/?link=COP or call
1-888-301-0513
Order free Annual Report for Hess Corporation
Visit http://djnewswires.ar.wilink.com/?link=HES or call
1-888-301-0513
Order free Annual Report for Holly Corp.
Visit http://djnewswires.ar.wilink.com/?link=HOC or call
1-888-301-0513
Order free Annual Report for Marathon Oil Corporation
Visit http://djnewswires.ar.wilink.com/?link=MRO or call
1-888-301-0513
Order free Annual Report for Suncor Energy Inc.
Visit http://djnewswires.ar.wilink.com/?link=SU or call
1-888-301-0513
Order free Annual Report for Tesoro Corporation
Visit http://djnewswires.ar.wilink.com/?link=TSO or call
1-888-301-0513
Order free Annual Report for Exxon Mobil Corporation
Visit http://djnewswires.ar.wilink.com/?link=XOM or call
1-888-301-0513
Order free Annual Report for BP plc
Visit http://djnewswires.ar.wilink.com/?link=BP or call
1-888-301-0513
Order free Annual Report for ConocoPhillips
Visit http://djnewswires.ar.wilink.com/?link=COP or call
1-888-301-0513
Order free Annual Report for Hess Corporation
Visit http://djnewswires.ar.wilink.com/?link=HES or call
1-888-301-0513
Order free Annual Report for Holly Corp.
Visit http://djnewswires.ar.wilink.com/?link=HOC or call
1-888-301-0513
Order free Annual Report for Marathon Oil Corporation
Visit http://djnewswires.ar.wilink.com/?link=MRO or call
1-888-301-0513
Order free Annual Report for Suncor Energy Inc.
Visit http://djnewswires.ar.wilink.com/?link=SU or call
1-888-301-0513
Order free Annual Report for Tesoro Corporation
Visit http://djnewswires.ar.wilink.com/?link=TSO or call
1-888-301-0513
Order free Annual Report for Exxon Mobil Corporation
Visit http://djnewswires.ar.wilink.com/?link=XOM or call
1-888-301-0513