Amador Gold Corp. (TSX VENTURE:AGX) is pleased to announce the commencement of
diamond drilling at their Silverclaim Lake Ag/Co/Ni property. The claims are
favourably situated in Mickle Township, in the heart of the Elk Lake silver camp
and are easily accessed by Highway 560 approximately 7.5 kilometres west from
Elk Lake then a few hundred metres north of the highway on a good dirt road.


The Silverclaim Lake property is the location of the historic Cotley/Shane-
Darragh/Cameron mine site. During its production history, the mine produced some
63,470 oz of silver, representing more than half of the roughly 110,000 oz Elk
Lake Camp silver production. Silver mineralization appears to be associated with
the differentiation of the Nipissing Diabase intrusive. This has given rise to
characteristic high grade silver veins accompanied by significant silver tenors
within the diabase host rock.


Previous diamond drilling programs identified two vein systems striking roughly
north -south in the area of the mine workings. This year's program, nine holes
totaling 750 metres, is currently a shallow program, designed to test depth
extensions to the 75 metre level and strike extensions to the 25 metre level.
Assay results will be released as they become available. A second phase of
drilling will follow compilation of this program's data.


Roger MacDonald P.Geo has reviewed the technical information in this news release.

The statements made in this Press Release may contain forward-looking statements
that may involve a number of risks and uncertainties. Actual events or results
could differ materially from the Company's expectations and projections.


Silver X Mining (TSXV:AGX)
Gráfica de Acción Histórica
De May 2024 a Jun 2024 Haga Click aquí para más Gráficas Silver X Mining.
Silver X Mining (TSXV:AGX)
Gráfica de Acción Histórica
De Jun 2023 a Jun 2024 Haga Click aquí para más Gráficas Silver X Mining.