Kirkland Lake Gold Ltd. (“Kirkland Lake Gold” or
the “
Company”) (TSX:KL) (NYSE:KL) (ASX:KLA) today
announced results from
39 holes including
six wedge holes and
35,572.6 m of
drilling along the Detour Mine Trend (“DMT”) at the Detour Lake
property. The new holes being reported are the seventh batch of
results from the 2020/2021 exploration program and the first since
the October 15, 2021 filing of the updated 43-101 Technical Report
which incorporated ongoing drilling at Detour up to July 26, 2021.
The program is being completed to collect additional information
supporting and potentially expanding the recently released
10.1-million-ounce increase in Measured and Indicated (“M&I”)
Mineral Resources (the “Mid-Year 2021 Mineral Resource Estimates”).
The Company expects to convert a significant percentage of the
increased M&I Mineral Resources into Mineral Reserves as it
works to complete a new production plan, expected to be released in
early 2022. Most of the new holes announced today are from drilling
in the Saddle Zone, located between the existing Main Pit and
planned West Pit locations, which has been underexplored and has no
Mineral Reserves and from the future West Pit area.
Tony Makuch, President and CEO of Kirkland Lake
Gold, commented: “When we acquired Detour Lake we indicated that
the potential existed to substantially grow Mineral Resources and
Mineral Reserves and, with the extensive exploration success we are
achieving, we are well down the path to achieving that growth.
Today’s drill results include a number of wide, high-grade
intersections which highlight the opportunity we have to add
significant new Mineral Resources beyond the 10.1-million-ounce
increase that we recently reported. The results continue to confirm
the existence of a broad and continuous corridor of mineralization
extending over 4.0 km from the Main Pit through the Saddle Zone to
beyond the planned West Pit location to a depth of at least 800 m
below surface with the system remaining open.
“The new holes demonstrate the potential for
further growth in Mineral Resources both within and outside of the
existing resource pit shells. Also encouraging is that we continue
to extend the mineralization to depth. Our 2020/2021 drilling
program at Detour Lake is continuing with 12 surface drills in
operation, with approximately 300,000 m of total drilling expected
to be completed by the end of 2021.”
Saddle Zone
Drilling in the Saddle Zone included eight holes
(9,277.7 m), including two wedge holes and targeted areas along the
DMT directly to the west of the Main Pit Mineral Reserve shell.
Significant results from the drilling include:
20.10 gpt over 25.3 m, incl 67.03 gpt over 6.0 m
and incl 13.82 gpt over 6.3 m, 1.62 gpt over 35.7 m, 1.33
gpt over 87.0 m, incl 18.13 over 2.0 m and 1.30
gpt over 53.0 m, incl 12.84 gpt over 2.1 m from hole
DLM-21-295; 2.17 gpt over 26.0 m, incl 19.25 gpt over 2.0
m, 3.49 gpt over 16.0 m, incl 13.09 m over 3.0 m, 1.55 gpt over
54.0 and 1.18 gpt over 40.0 m from hole
DLM-21-259; 3.31 gpt over 30.0 m, incl 14.50 gpt over 2.0
m and incl 16.18 gpt over 3.0 m, 1.50 gpt over
20.0 m, 1.36 gpt over 41.0 m, incl 18.77 over 2.0 m from
hole DLM-21-259W; 1.22 gpt over 62.0 m, 1.37 gpt over 24.0
m, 1.23 gpt over 31.0 m and 1.89 gpt over 14.0
m from DLM-21-286; 1.36 gpt over 61.8 m, incl 6.05
gpt over 5.0 m, 2.71 over 21.9 m, 1.77 gpt over 30.0 m, 0.90 gpt
over 24.2 m and 17.49 gpt over 2.0 m from
hole DLM-21-289, 3.92 gpt over 34.0 m, incl 54.13 gpt over
2.0 m, 1.08 gpt over 32.9 m, and 19.70 gpt over
2.0 m from hole DLM-21-296. These holes were drilled to
target the DMT between 200 and 550 m below surface and continue to
confirm and identify new mineralization within untested gaps inside
the recently announced updated Mineral Resource pit
shells.
Additional significant intersections within the
Saddle Zone which identified mineralization outside and below the
October 15, 2021 Mineral Resource pit shell include: 3.95
gpt over 22.0 m, incl 12.30 gpt over 4.0 m from
DLM-21-264D; 2.83 gpt over 54.8 m, incl 10.39 gpt over 2.8
m and incl 32.30 gpt over 2.5 m from
DLM-21-289, and 2.85 gpt over 36.0 m, incl 18.71 gpt over
2.1 m and 1.58 gpt over 32.0 m from
DLM-21-296; 1.58 gpt over 41.4 m, incl 6.33 gpt over 8.0 m,
1.14 gpt over 37.5 m, from DLM-21-259W; and 0.93
gpt over 32.0 m and 0.89 gpt over 29.8 m
from DLM-21-286.
Results from all new holes in this area are
considered extremely encouraging as they continue to confirm the
presence of a broad corridor of mineralization extending between
the Main Pit and Mineral Reserve in the planned West Pit (a
distance of over 800 m) with the overall style of mineralization
and gold tenor being very similar to that found in existing Mineral
Reserves. Particularly encouraging is the identification of wide,
high-grade mineralization near the lower limits of the current
Mineral Resource pit shell, which indicates that a potential exists
to expand the pit shell to depth and to add significant new
open-pit Mineral Resources as well as to define underground Mineral
Resources below the pit.
Future West Pit
Drilling west of the Main Pit and Saddle Zone
areas in the future West Pit location included 31 holes (26,294.9
m) and four wedge holes.
Significant results from the drilling include:
3.23 gpt over 20.0 m, 1.09 gpt over 32.1 m, and
1.69 gpt over 16.8 m from hole
DLM-21-268B; 2.62 gpt over 48.0 m, incl 19.43 gpt over 3.7
m, 0.93 gpt over 12.0 m from DLM-21-269A; 2.41 gpt
over 10.0 m, 16.83 gpt over 2.0 m , 7.48 gpt over 3.0 m, 3.27 gpt
over 8.6 m and 0.88 gpt over 21.0 m, from
DLM-21-266; 1.69 gpt over 36.0 m, 1.01 gpt over 25.0 m,
26.07 gpt over 2.0 m , and 13.75 gpt over 3.0
m, from DLM-21-273; 1.18 gpt over 50.0 m, inc
13.15 gpt over 2.0 m, 0.97 gpt over 26.0 m from
DLM-21-290; 1.14 gpt over 75.0 m, 0.80 gpt over 98.0 m,
1.71 gpt over 18.4 m, 0.91 gpt over 19.0
m and 21.85 gpt over 2.0 m from
DLM-21-249; 1.16 gpt over 22.0 m and 0.92
gpt over 26.8 m from DLM-21-270; 1.08 gpt over
36.1 m, 0.99 gpt over 53.0 m and 0.86 gpt over
39.0 m from DLM-21-301A; 2.24 gpt over 15.3
m and 0.82 gpt over 25.0 m from
DLM-21-279; 2.07 gpt over 14.8 m, 52.90
gpt over 2.0 m and 18.26 gpt over 2.0 m
from DLM-21-291A; and 1.00 gpt over 23.6m, 0.82 gpt over
28.0 m from DLM-21-241D. These holes were drilled to
target the DMT between 200 and 500 m below surface and continue to
confirm and identify new mineralization within untested gaps inside
the recently announced updated Mineral Resource Pit shells.
North of the West Pit
Resource
Recent drilling targeting mineralization north
of the October 15, 2021 updated Mineral Resource in the West Pit
area continue to demonstrate potential both near surface and at
depth immediately to the north of the West Pit optimized Resource
Pit Shell.
Significant intercepts from this area include:
4.77 gpt over 32.0 m, incl 44.46 gpt over 3.0 m, 17.74 gpt
over 2.2 m, 17.17 gpt over 2.0 m, 1.07 gpt over 18.6 m and 0.88 gpt
over 18.0 m from DLM-21-300; 2.07 gpt over 21.0 m,
incl 4.04 gpt over 9.0 m from DLM-283A; 1.36 gpt
over 34.0 m, 1.18 gpt over 40.2 m, 1.71 gpt over
10.2 m from hole DLM-21-278; 77.27 gpt over 2.0
m from DLM-21-275, 0.87 gpt over 31.0 m,
1.16 gpt over 15.5 m, and 1.18 gpt over
10.0 m from DLM-21-271; and 0.90 gpt over 37.0 m,
incl 4.13 gpt over 3.0 m, 10.41 gpt over 2.0 m, 0.89 gpt over 15.0
m, and 0.87 gpt over 13.0 m from
DLM-21-294A.
Below West Pit ResourceDrilling
results below the West Pit area continue to demonstrate the
potential for additional resources below the updated Resource Pit
Shell.
Significant intercepts from this area, which
demonstrate significant grades between 600 and 800 m below surface,
include: 8.21 gpt over 10.0 m from DLM-21-279,
157.77 gpt over 2.0 m, 18.06 gpt over 2.0, 2.84 gpt over
12.0 m, incl 14.60 gpt over 2.0 m, and 0.93 gpt
over 15.9 m from DLM-21-241D; 7.46 gpt over 5.0
m, 1.43 gpt over 16.0 m from DLM-21-265;
7.99 gpt over 5.0 m, 1.25 gpt over 19.0, 1.64 gpt over 13.0
m and 1.04 gpt over 15.0 m from
DLM-21-269A; 1.81 gpt over 21.0 m from DLM-21-270;
1.37 gpt over 25.0 m and 0.88 gpt over
18.0 m from DLM-21-282A; 1.08 gpt over 50.5
m and 8.01 gpt over 2.7
m from DLM-21-266; 0.98 gpt over 95.5
m from DLM-21-268B, 0.80 gpt over 25.0 m
and 0.70 gpt over 38.0 m from DLM-21-280.
Results from the drilling are considered very
positive and continue to confirm the continuation of mineralization
through the west portion of the Saddle Zone and into the area under
the planned West Pit.
Based on assay results and other observations
obtained from the program to date, the outlook for the project
continues to be encouraging. The evidence of a broad and continuous
corridor of mineralization extending from the Main Pit through the
Saddle Zone to the planned West Pit is supported by the October 15,
2021 43-101 Technical Report with continued drilling intersecting
mineralization to a depth of at least 800 m below surface. The work
also suggests that mineralization within the corridor is very
similar to that found in existing Mineral Reserves and is hosted
within broad zones containing variable amounts of quartz and
pyrite, which are controlled mainly by east-west trending,
moderately north-dipping folds and shear structures which plunge at
a shallow angle to the west. Given results to date, the potential
to identify further extensions to mineralization as well as
additions to Mineral Resources and Mineral Reserves through
additional drilling is considered excellent.
The 2020/2021 exploration program is continuing
at Detour Lake with twelve drills current working and a total of
approximately 300,000 m expected to be completed by the end of
2021.
Qualified Persons
The Company’s exploration programs at Detour
Lake are conducted under the supervision of Eric Kallio, P.Geo.,
Senior Vice President, Exploration. Mr. Kallio, as well as Keith
Green, P.Geo., Director, Exploration, Canada, and Steve Gray,
P.Geo, Exploration Superintendent, Detour Lake Mine, are ‘qualified
persons’ for the purpose of National Instrument 43-101, Standards
of Disclosure for Mineral Projects, of the Canadian Securities
Administrators, and have reviewed and approved the scientific and
technical information in this news release.
QA/QC Controls
The Company has implemented a quality assurance
and control (“QA/QC”) program to ensure sampling and analysis of
all exploration work is conducted in accordance with best
practices. Samples are logged and sampled in a secure facility at
the Detour mine site and under supervision of Qualified Geologists.
NQ sized core is predominantly sawn in half with one half of the
core prepared for shipment, the other half of core retained for
future assay verification. Certified reference material (CRM)
standards and coarse blank material are inserted every 20 samples.
Core samples are shipped directly by courier and tracked via a
chain of custody from site to certified off-site analytical
laboratories for preparation and assaying.
Kirkland Lake Gold utilizes four accredited
external laboratories to manage the significant volume of sample
submissions. Each lab is certified by the Standards Council of
Canada (SCC) which conforms with ASB-RG Mineral Analysis Laboratory
for the Accreditation of Mineral Analysis Testing Laboratories and
CAN-P-4E ISO/IEC 17025: General Requirements for the Competence of
Testing and Calibration Laboratories.
Sample preparation includes crushing drill core
up to 80% passing 2 mm, riffle splitting 500 grams and pulverizing
to 95% passing 105 µm followed by both scheduled and specifically
requested silica sand cleaning. Gold Analysis involves Fire Assay –
Atomic Absorption (AA) technique from a 50-gram pulp sample with
grade ranges between 5 to 10,000 ppb. Samples greater than 10,000
ppb are analyzed with a gravimetric finish. Selected high grade
samples are also analyzed using the screen metallics procedure.
Contracted laboratories for the Kirkland Lake Gold’s Detour Project
include: ALS Global (sample preparation completed in Timmins,
Ontario with pulps sent to Vancouver, BC for analysis), Activation
Laboratories (sample preparation and analysis completed in Timmins,
Ontario), SGS Laboratories (sample preparation and analysis
completed in Cochrane, Ontario) and AGAT Laboratories (sample
preparation in Timmins and analysis in Mississauga).
About Kirkland Lake Gold
Ltd.
Kirkland Lake Gold Ltd. is a senior gold
producer operating in Canada and Australia that is targeting
1,300,000 – 1,400,000 ounces of production in 2021. The production
profile of the Company is anchored by three high-quality
operations, including the Macassa Mine and Detour Lake Mine, both
located in Northern Ontario, and the Fosterville Mine located in
the state of Victoria, Australia. Kirkland Lake Gold’s solid base
of quality assets is complemented by district scale exploration
potential, supported by a strong financial position with extensive
management expertise.
For further information on Kirkland Lake Gold
and to receive news releases by email, visit the website at
www.kl.gold.
Cautionary Note Regarding Forward-Looking
Information
This News Release includes certain
"forward-looking statements". All statements other than statements
of historical fact included in this release are forward-looking
statements that involve various risks and uncertainties. These
forward-looking statements include, but are not limited to,
statements with respect to planned the exploration program at the
Detour Lake Mine, costs and expenditures, the ability to
potentially expand Mineral Reserves, changes in Mineral Resources
and conversion of Mineral Resources to proven and probable
reserves, the ability to expand the current pit design of the mine,
the new mine plan and anticipated timing of the updated technical
report with respect to the Detour Lake Mine and the anticipated
benefits thereon, and other information that is based on forecasts
of future operational or financial results, estimates of amounts
not yet determinable and assumptions of management. These
forward-looking statements include, but are not limited to,
statements with respect to future exploration potential, project
economics, timing and scope of future exploration, anticipated
costs and expenditures, changes in Mineral Resources and conversion
of Mineral Resources to proven and probable reserves, and other
information that is based on forecasts of future operational or
financial results, estimates of amounts not yet determinable and
assumptions of management.
Any statements that express or involve
discussions with respect to predictions, expectations, beliefs,
plans, projections, objectives, assumptions or future events or
performance (often, but not always, using words or phrases such as
"expects" or "does not expect", "is expected", "anticipates" or
"does not anticipate", "plans", "estimates" or "intends", or
stating that certain actions, events or results "may", "could",
"would", "might" or "will" be taken, occur or be achieved) are not
statements of historical fact and may be "forward-looking
statements." Forward-looking statements are subject to a variety of
risks and uncertainties that could cause actual events or results
to differ from those reflected in the forward-looking statements.
Exploration results that include geophysics, sampling, and drill
results on wide spacings may not be indicative of the occurrence of
a mineral deposit. Such results do not provide assurance that
further work will establish sufficient grade, continuity,
metallurgical characteristics and economic potential to be classed
as a category of Mineral Resource. A Mineral Resource that is
classified as "Inferred" or "indicated" has a great amount of
uncertainty as to its existence and economic and legal feasibility.
It cannot be assumed that any or part of an "indicated Mineral
Resource" or "Inferred Mineral Resource" will ever be upgraded to a
higher category of resource. Investors are cautioned not to assume
that all or any part of mineral deposits in these categories will
ever be converted into proven and probable reserves.
There can be no assurance that forward-looking
statements will prove to be accurate and actual results and future
events could differ materially from those anticipated in such
statements. Important factors that could cause actual results to
differ materially from the Company’s expectations include, among
others, risks related to international operations, risks related to
obtaining the permits required to carry out planned exploration or
development work, the actual results of current exploration
activities, conclusions of economic evaluations and changes in
project parameters as plans continue to be refined as well as
future prices of gold, as well as those factors discussed in the
section entitled "Risk Factors" in the Company’s Annual Information
Form for the year ended December 31, 2020 and other disclosures of
"Risk Factors" by the Company and its predecessors, available on
SEDAR. Although Kirkland Lake Gold has attempted to identify
important factors that could cause actual results to differ
materially, there may be other factors that cause results not to be
as anticipated, estimated or intended. There can be no assurance
that such statements will prove to be accurate as actual results
and future events could differ materially from those anticipated in
such statements. Accordingly, readers should not place undue
reliance on forward-looking statements.
Cautionary Note to U.S. Investors -
Mineral Reserve and Resource Estimates
This press release has been prepared in
accordance with the requirements of the securities laws in effect
in Canada, which differ from the requirements of United States
securities laws. The terms “mineral reserve”, “proven mineral
reserve” and “probable mineral reserve” are Canadian mining terms
as defined in accordance with Canadian National Instrument
43-101-Standards of Disclosure for Mineral Projects (“NI 43-101”)
and the Canadian Institute of Mining, Metallurgy and Petroleum (the
“CIM”)-CIM Definition Standards on Mineral Resources and Mineral
Reserves, adopted by the CIM Council, as amended. These definitions
differ from the definitions in SEC Industry Guide 7 under the
United States Securities Act of 1993, as amended (the “Securities
Act”).
The SEC has adopted amendments to its disclosure
rules to modernize the mineral property disclosure requirements for
issuers whose securities are registered with the SEC under the
Securities Exchange Act of 1934 (“Exchange Act”). These amendments
became effective February 25, 2019 (the “SEC Modernization Rules”)
and, following a two-year transition period, the SEC Modernization
Rules will replace the historical property disclosure requirements
for mining registrants that were included in SEC Industry Guide 7.
Following the transition period, as a foreign private issuer that
files its annual report on Form 40-F with the SEC pursuant to the
multi-jurisdictional disclosure system, the Company is not required
to provide disclosure on its mineral properties under the SEC
Modernization Rules and will continue to provide disclosure under
NI 43-101 and the CIM Definition Standards. If the Company ceases
to be a foreign private issuer or loses its eligibility to file its
annual report on Form 40-F pursuant to the multi-jurisdictional
disclosure system, then the Company will be subject to the SEC
Modernization Rules which differ from the requirements of NI 43-101
and the CIM Definition Standards. The SEC Modernization Rules
include the adoption of terms describing mineral reserves and
mineral resources that are “substantially similar” to the
corresponding terms under the CIM Definition Standards. As a result
of the adoption of the SEC Modernization Rules, the SEC now
recognizes estimates of “measured mineral resources”, “indicated
mineral resources” and “inferred mineral resources”. In addition,
the SEC has amended its definitions of “proven mineral reserves”
and “probable mineral reserves” to be “substantially similar” to
the corresponding CIM Definitions. U.S. investors are cautioned
that while the above terms are “substantially similar” to CIM
Definitions, there are differences in the definitions under the SEC
Modernization Rules and the CIM Definition Standards. Accordingly,
there is no assurance any mineral reserves or mineral resources
that the Company may report as “proven mineral reserves”, “probable
mineral reserves”, “measured mineral resources”, “indicated mineral
resources” and “inferred mineral resources” under NI 43-101 would
be the same had the Company prepared the reserve or resource
estimates under the standards adopted under the SEC Modernization
Rules.
U.S. investors are also cautioned that while the
SEC will now recognize “measured mineral resources”, “indicated
mineral resources” and “inferred mineral resources”, investors
should not assume that any part or all of the mineralization in
these categories will ever be converted into a higher category of
mineral resources or into mineral reserves. Mineralization
described using these terms has a greater amount of uncertainty as
to its existence and feasibility than mineralization that has been
characterized as reserves. Accordingly, investors are cautioned not
to assume that any measured mineral resources, indicated mineral
resources, or inferred mineral resources that the Company reports
are or will be economically or legally mineable. Further, “inferred
mineral resources” have a greater amount of uncertainty as to their
existence and as to whether they can be mined legally or
economically. Therefore, U.S. investors are also cautioned not to
assume that all or any part of the “inferred mineral resources”
exist. Under Canadian securities laws, estimates of “inferred
mineral resources” may not form the basis of feasibility or
pre-feasibility studies, except in rare cases.
FOR FURTHER INFORMATION PLEASE
CONTACT
Anthony Makuch, President, Chief Executive
Officer & DirectorPhone: +1 416-840-7884, E-mail:
tmakuch@kl.gold
Mark Utting, Senior Vice President, Investor RelationsPhone: +1
416-840-7884, E-mail: mutting@kl.gold
Table 1. Detour Lake Mine – Significant Assay
Results
Hole Number |
Section East |
UTM NAD83 |
Hole Length (m) |
Azimuth (°) |
Dip (°) |
From (m) |
To (m) |
Length (m) |
Au (gpt) |
|
Easting |
Northing |
DLM-21-237 |
15660 |
587926 |
5541697 |
324.0 |
178 |
-56 |
306.0 |
312.0 |
6.0 |
1.36 |
West Pit |
DLM-21-241D |
15660 |
587925 |
5541734 |
702.0 |
178 |
-56 |
116.0 |
126.0 |
10.0 |
1.08 |
West pit |
|
|
|
|
|
|
|
162.0 |
172.0 |
10.0 |
1.53 |
|
|
|
|
|
|
|
190.4 |
214.0 |
23.6 |
1.00 |
|
|
|
|
|
|
|
378.0 |
406.0 |
28.0 |
0.82 |
|
|
|
|
|
|
|
443.0 |
458.9 |
15.9 |
0.93 |
|
|
|
|
|
|
|
569.1 |
621.0 |
51.9 |
0.50 |
|
|
|
|
|
|
|
631.0 |
633.0 |
2.0 |
157.77 |
|
|
|
|
|
|
|
648.0 |
650.0 |
2.0 |
18.06 |
|
|
|
|
|
|
|
660.0 |
672.0 |
12.0 |
2.84 |
INCL. |
|
|
|
|
|
|
660.0 |
662.0 |
2.0 |
14.60 |
DLM-21-249 |
15700 |
587965 |
5541725 |
705.0 |
178 |
-56 |
193.0 |
212.0 |
19.0 |
0.91 |
West Pit |
|
|
|
|
|
|
|
233.0 |
235.0 |
2.0 |
21.85 |
|
|
|
|
|
|
|
335.0 |
433.0 |
98.0 |
0.80 |
|
|
|
|
|
|
|
459.0 |
477.4 |
18.4 |
1.71 |
|
|
|
|
|
|
|
553.0 |
628.0 |
75.0 |
1.14 |
DLM-21-259 |
17460 |
589729 |
5541512 |
771.7 |
182 |
-53 |
473.0 |
513.0 |
40.0 |
1.18 |
Saddle |
|
|
|
|
|
|
|
538.0 |
592.0 |
54.0 |
1.55 |
|
|
|
|
|
|
|
638.0 |
654.0 |
16.0 |
3.49 |
INCL |
|
|
|
|
|
|
651.0 |
654.0 |
3.0 |
13.09 |
|
|
|
|
|
|
|
720.0 |
746.0 |
26.0 |
2.17 |
INCL |
|
|
|
|
|
|
724.0 |
726.0 |
2.0 |
19.25 |
DLM-21-259W |
17460 |
589729 |
5541512 |
451.0 |
182 |
-53 |
727.0 |
747.0 |
20.0 |
1.50 |
|
|
|
|
|
|
|
798.0 |
828.0 |
30.0 |
3.31 |
INCL. |
|
|
|
|
|
|
799.0 |
801.0 |
2.0 |
14.50 |
INCL. |
|
|
|
|
|
|
812.0 |
815.0 |
3.0 |
16.18 |
|
|
|
|
|
|
|
858.0 |
899.0 |
41.0 |
1.36 |
INCL. |
|
|
|
|
|
|
884.0 |
886.0 |
2.0 |
18.77 |
|
|
|
|
|
|
|
1018.0 |
1059.4 |
41.4 |
1.58 |
INCL. |
|
|
|
|
|
|
1045.0 |
1053.0 |
8.0 |
6.33 |
|
|
|
|
|
|
|
1072.5 |
1110.0 |
37.5 |
1.14 |
|
|
|
|
|
|
|
1122.0 |
1137.5 |
15.5 |
1.07 |
DLM-21-262 |
15980 |
588246 |
5541649 |
288.0 |
179 |
-54 |
123.0 |
125.0 |
2.0 |
21.71 |
West Pit |
DLM-21-262W |
15980 |
588246 |
5541649 |
266.0 |
179 |
-54 |
293.2 |
305.6 |
12.4 |
0.88 |
|
|
|
|
|
|
|
378.8 |
381.0 |
2.2 |
31.33 |
|
|
|
|
|
|
|
391.3 |
398.3 |
7.0 |
2.95 |
|
|
|
|
|
|
|
458.6 |
471.0 |
12.4 |
0.81 |
DLM-21-264D |
17740 |
590009 |
5541583 |
1254.0 |
182 |
-57 |
786.0 |
797.0 |
11.0 |
1.00 |
Saddle |
|
|
|
|
|
|
|
807.0 |
820.0 |
13.0 |
0.71 |
|
|
|
|
|
|
|
916.0 |
938.0 |
22.0 |
3.95 |
INCL. |
|
|
|
|
|
|
916.0 |
920.0 |
4.0 |
12.30 |
DLM-21-264DW |
17740 |
590009 |
5541583 |
961.0 |
178 |
-53 |
712.0 |
729.5 |
17.5 |
1.06 |
|
|
|
|
|
|
|
755.0 |
776.0 |
21.0 |
0.83 |
|
|
|
|
|
|
|
831.0 |
848.0 |
17.0 |
1.02 |
DLM-21-265 |
16460 |
588726 |
5541578 |
750.0 |
179 |
-59 |
503.0 |
505.0 |
2.0 |
13.23 |
West pit |
|
|
|
|
|
|
|
531.0 |
550.0 |
19.0 |
0.83 |
|
|
|
|
|
|
|
563.0 |
593.0 |
30.0 |
0.76 |
|
|
|
|
|
|
|
635.3 |
646.0 |
10.7 |
0.96 |
|
|
|
|
|
|
|
688.0 |
693.0 |
5.0 |
7.46 |
|
|
|
|
|
|
|
734.0 |
750.0 |
16.0 |
1.43 |
DLM-21-266 |
15980 |
588245 |
5541737 |
952.0 |
179 |
-55 |
297.0 |
299.0 |
2.0 |
16.83 |
West Pit |
|
|
|
|
|
|
|
339.0 |
342.0 |
3.0 |
7.48 |
|
|
|
|
|
|
|
362.4 |
371.0 |
8.6 |
3.27 |
|
|
|
|
|
|
|
482.8 |
496.0 |
13.2 |
1.21 |
|
|
|
|
|
|
|
574.0 |
595.0 |
21.0 |
0.88 |
|
|
|
|
|
|
|
696.0 |
706.0 |
10.0 |
2.41 |
|
|
|
|
|
|
|
732.8 |
735.5 |
2.7 |
8.01 |
|
|
|
|
|
|
|
753.0 |
803.5 |
50.5 |
1.08 |
DLM-21-267 |
17540 |
589808 |
5541530 |
651.0 |
180 |
-61 |
496.0 |
511.0 |
15.0 |
1.88 |
Saddle |
|
|
|
|
|
|
|
528.1 |
541.0 |
12.9 |
0.97 |
DLM-21-268B |
15900 |
588165 |
5541793 |
999.4 |
178 |
-58 |
378.9 |
411.0 |
32.1 |
1.09 |
West Pit |
|
|
|
|
|
|
|
433.0 |
453.0 |
20.0 |
3.23 |
|
|
|
|
|
|
|
541.5 |
558.3 |
16.8 |
1.69 |
|
|
|
|
|
|
|
782.0 |
877.5 |
95.5 |
0.98 |
DLM-21-269A |
15860 |
588123 |
5541831 |
999.0 |
179 |
-57 |
269.0 |
281.0 |
12.0 |
0.93 |
West Pit |
|
|
|
|
|
|
|
428.0 |
476.0 |
48.0 |
2.62 |
INCL. |
|
|
|
|
|
|
461.5 |
465.2 |
3.7 |
19.43 |
|
|
|
|
|
|
|
596.9 |
601.6 |
4.7 |
3.82 |
|
|
|
|
|
|
|
712.0 |
731.0 |
19.0 |
1.25 |
|
|
|
|
|
|
|
817.0 |
822.0 |
5.0 |
7.99 |
|
|
|
|
|
|
|
850.0 |
865.0 |
15.0 |
1.04 |
|
|
|
|
|
|
|
899.0 |
912.0 |
13.0 |
1.64 |
DLM-21-270 |
16260 |
588525 |
5541712 |
1069.0 |
181 |
-59 |
649.2 |
671.2 |
22.0 |
1.16 |
West Pit |
|
|
|
|
|
|
|
681.2 |
708.0 |
26.8 |
0.92 |
|
|
|
|
|
|
|
719.8 |
725.0 |
5.2 |
3.22 |
|
|
|
|
|
|
|
757.9 |
769.2 |
11.3 |
1.73 |
|
|
|
|
|
|
|
788.2 |
815.0 |
26.8 |
0.70 |
|
|
|
|
|
|
|
973.4 |
994.4 |
21.0 |
1.81 |
|
|
|
|
|
|
|
1026.9 |
1038.9 |
12.0 |
1.09 |
DLM-21-271 |
15980 |
588243 |
5541827 |
921.0 |
178 |
-57 |
584.0 |
599.5 |
15.5 |
1.16 |
West Pit |
|
|
|
|
|
|
|
656.5 |
671.0 |
14.5 |
0.67 |
|
|
|
|
|
|
|
692.0 |
702.0 |
10.0 |
1.18 |
|
|
|
|
|
|
|
767.0 |
798.0 |
31.0 |
0.87 |
DLM-21-273 |
16300 |
588565 |
5541718 |
882.0 |
180 |
-59 |
93.0 |
96.0 |
3.0 |
13.75 |
West pit |
|
|
|
|
|
|
|
183.0 |
185.0 |
2.0 |
26.07 |
|
|
|
|
|
|
|
318.9 |
354.9 |
36.0 |
1.69 |
|
|
|
|
|
|
|
581.0 |
606.0 |
25.0 |
1.01 |
|
|
|
|
|
|
|
629.0 |
643.8 |
14.8 |
0.84 |
|
|
|
|
|
|
|
668.0 |
712.0 |
44.0 |
0.62 |
DLM-21-274 |
17060 |
589331 |
5541417 |
1053.0 |
182 |
-58 |
209.0 |
212.0 |
3.0 |
7.11 |
Saddle |
|
|
|
|
|
|
|
351.0 |
363.1 |
12.1 |
0.79 |
|
|
|
|
|
|
|
447.0 |
471.0 |
24.0 |
1.09 |
|
|
|
|
|
|
|
630.0 |
643.0 |
13.0 |
1.27 |
|
|
|
|
|
|
|
745.0 |
755.0 |
10.0 |
0.90 |
|
|
|
|
|
|
|
969.6 |
981.5 |
11.9 |
1.49 |
DLM-21-275 |
16140 |
588404 |
5541781 |
619.0 |
179 |
-58 |
553.0 |
555.0 |
2.0 |
77.27 |
West Pit |
DLM-21-275W |
16140 |
588404 |
5541781 |
549.0 |
179 |
-58 |
733.0 |
762.0 |
29.0 |
1.38 |
|
|
|
|
|
|
|
820.0 |
831.0 |
11.0 |
0.88 |
DLM-21-276 |
15260 |
587534 |
5541264 |
162.0 |
178 |
-52 |
NSV |
West Pit |
DLM-21-277 |
15620 |
587886 |
5541677 |
627.0 |
178 |
-56 |
339.0 |
357.0 |
18.0 |
0.86 |
West Pit |
|
|
|
|
|
|
|
614.0 |
626.0 |
12.0 |
1.91 |
DLM-21-278 |
15820 |
588084 |
5541811 |
999.0 |
178 |
-61 |
284.0 |
291.0 |
7.0 |
3.11 |
West Pit |
|
|
|
|
|
|
|
439.7 |
463.4 |
23.7 |
1.48 |
INCL. |
|
|
|
|
|
|
439.7 |
441.7 |
2.0 |
10.25 |
|
|
|
|
|
|
|
600.0 |
610.2 |
10.2 |
1.71 |
|
|
|
|
|
|
|
674.1 |
677.8 |
3.7 |
4.77 |
|
|
|
|
|
|
|
691.0 |
721.0 |
30.0 |
0.55 |
|
|
|
|
|
|
|
752.8 |
793.0 |
40.2 |
1.18 |
|
|
|
|
|
|
|
820.0 |
850.0 |
30.0 |
0.66 |
|
|
|
|
|
|
|
877.0 |
911.0 |
34.0 |
1.36 |
DLM-21-279 |
16100 |
588365 |
5541745 |
1074.0 |
179 |
-56 |
193.0 |
204.0 |
11.0 |
1.18 |
West Pit |
|
|
|
|
|
|
|
350.7 |
366.0 |
15.3 |
2.24 |
|
|
|
|
|
|
|
664.0 |
689.0 |
25.0 |
0.82 |
|
|
|
|
|
|
|
757.9 |
770.0 |
12.1 |
1.39 |
|
|
|
|
|
|
|
778.8 |
788.9 |
10.1 |
1.03 |
|
|
|
|
|
|
|
1023.0 |
1033.0 |
10.0 |
8.21 |
DLM-21-280 |
15660 |
587924 |
5541767 |
747.5 |
178 |
-56 |
274.0 |
285.9 |
11.9 |
2.04 |
West Pit |
|
|
|
|
|
|
|
405.0 |
456.1 |
51.1 |
0.63 |
|
|
|
|
|
|
|
490.1 |
506.8 |
16.7 |
0.69 |
|
|
|
|
|
|
|
601.0 |
639.0 |
38.0 |
0.70 |
|
|
|
|
|
|
|
695.0 |
720.0 |
25.0 |
0.80 |
DLM-21-281 |
15260 |
587533 |
5541316 |
153.0 |
178 |
-52 |
76.1 |
78.5 |
2.4 |
18.71 |
West Pit |
DLM-21-282A |
15776 |
588040 |
5541785 |
909.0 |
177 |
-61 |
152.0 |
154.0 |
2.0 |
17.59 |
West Pit |
|
|
|
|
|
|
|
192.0 |
203.0 |
11.0 |
0.90 |
|
|
|
|
|
|
|
412.0 |
414.0 |
2.0 |
14.84 |
|
|
|
|
|
|
|
439.0 |
452.0 |
13.0 |
1.81 |
|
|
|
|
|
|
|
466.0 |
475.0 |
9.0 |
2.94 |
|
|
|
|
|
|
|
575.0 |
577.0 |
2.0 |
9.14 |
|
|
|
|
|
|
|
640.0 |
651.0 |
11.0 |
0.87 |
|
|
|
|
|
|
|
673.0 |
691.0 |
18.0 |
0.88 |
|
|
|
|
|
|
|
701.0 |
726.0 |
25.0 |
1.37 |
|
|
|
|
|
|
|
774.8 |
800.0 |
25.2 |
0.71 |
|
|
|
|
|
|
|
857.0 |
874.0 |
17.0 |
0.76 |
DLM-21-283A |
15900 |
588162 |
5541854 |
561.0 |
178 |
-60 |
469.0 |
490.0 |
21.0 |
2.07 |
West Pit |
INCL. |
|
|
|
|
|
|
479.0 |
488.0 |
9.0 |
4.04 |
DLM-21-284 |
15260 |
587532 |
5541363 |
201.0 |
178 |
-52 |
50.4 |
56.0 |
5.6 |
2.93 |
West Pit |
DLM-21-285A |
16060 |
588324 |
5541752 |
1050.0 |
180 |
-56 |
347.7 |
365.0 |
17.3 |
0.84 |
West Pit |
|
|
|
|
|
|
|
502.3 |
514.3 |
12.0 |
1.01 |
|
|
|
|
|
|
|
692.0 |
713.5 |
21.5 |
1.17 |
|
|
|
|
|
|
|
731.1 |
742.0 |
10.9 |
0.95 |
DLM-21-286 |
17220E |
589494 |
5541253 |
903.0 |
178 |
-67 |
44.0 |
58.0 |
14.0 |
1.89 |
Saddle |
|
|
|
|
|
|
|
174.0 |
236.0 |
62.0 |
1.22 |
INCL. |
|
|
|
|
|
|
189.0 |
194.0 |
5.0 |
3.92 |
|
|
|
|
|
|
|
346.0 |
370.0 |
24.0 |
1.37 |
|
|
|
|
|
|
|
501.0 |
532.0 |
31.0 |
1.23 |
|
|
|
|
|
|
|
536.5 |
552.0 |
15.5 |
1.09 |
|
|
|
|
|
|
|
594.0 |
623.8 |
29.8 |
0.89 |
|
|
|
|
|
|
|
640.0 |
672.0 |
32.0 |
0.93 |
|
|
|
|
|
|
|
860.0 |
888.0 |
28.0 |
0.73 |
DLM-21-287C |
16520 |
587884 |
5541718 |
442.5 |
178 |
-58 |
189.6 |
215.0 |
25.4 |
0.72 |
West Pit |
|
|
|
|
|
|
|
231.1 |
243.1 |
12.0 |
1.19 |
|
|
|
|
|
|
|
309.0 |
321.0 |
12.0 |
1.27 |
|
|
|
|
|
|
|
396.0 |
410.0 |
14.0 |
1.11 |
|
|
|
|
|
|
|
430.0 |
442.5 |
12.5 |
0.66 |
DLM-21-287CW |
16520 |
587884 |
5541718 |
267.0 |
178 |
-58 |
437.0 |
464.9 |
27.9 |
1.09 |
|
|
|
|
|
|
|
578.0 |
609.0 |
31.0 |
0.66 |
|
|
|
|
|
|
|
618.0 |
637.0 |
19.0 |
0.85 |
|
|
|
|
|
|
|
662.0 |
688.0 |
26.0 |
0.69 |
DLM-21-288 |
16580 |
588846 |
5541671 |
598.0 |
179 |
-60 |
94.7 |
109.0 |
14.3 |
0.60 |
West Pit |
|
|
|
|
|
|
|
469.4 |
480.3 |
10.9 |
1.19 |
DLM-21-288W |
16580 |
588846 |
5541671 |
408.0 |
179 |
-60 |
629.0 |
641.0 |
12.0 |
0.93 |
|
|
|
|
|
|
|
694.4 |
724.0 |
29.6 |
1.15 |
|
|
|
|
|
|
|
739.4 |
750.0 |
10.6 |
1.02 |
DLM-21-289 |
17060 |
589331 |
5541416 |
1062.0 |
182 |
-60 |
366.0 |
378.9 |
12.9 |
0.76 |
Saddle |
|
|
|
|
|
|
|
416.0 |
418.0 |
2.0 |
17.49 |
|
|
|
|
|
|
|
434.0 |
449.0 |
15.0 |
1.47 |
|
|
|
|
|
|
|
496.0 |
520.2 |
24.2 |
0.90 |
|
|
|
|
|
|
|
682.5 |
744.3 |
61.8 |
1.36 |
INCL. |
|
|
|
|
|
|
694.6 |
699.6 |
5.0 |
6.05 |
|
|
|
|
|
|
|
754.0 |
775.9 |
21.9 |
2.71 |
|
|
|
|
|
|
|
797.0 |
827.0 |
30.0 |
1.77 |
|
|
|
|
|
|
|
880.0 |
898.2 |
18.2 |
0.75 |
|
|
|
|
|
|
|
919.2 |
974.0 |
54.8 |
2.83 |
INCL. |
|
|
|
|
|
|
919.2 |
922.0 |
2.8 |
10.39 |
INCL. |
|
|
|
|
|
|
943.4 |
945.9 |
2.5 |
32.30 |
DLM-21-290 |
15940 |
588204 |
5541849 |
894.0 |
178 |
-54 |
438.0 |
464.0 |
26.0 |
0.97 |
West Pit |
|
|
|
|
|
|
|
592.0 |
603.6 |
11.6 |
1.19 |
|
|
|
|
|
|
|
789.0 |
839.0 |
50.0 |
1.18 |
INCL. |
|
|
|
|
|
|
811.0 |
813.0 |
2.0 |
13.15 |
DLM-21-291A |
15740 |
588002 |
5541873 |
1017.5 |
178 |
-57 |
364.0 |
366.0 |
2.0 |
18.26 |
West Pit |
|
|
|
|
|
|
|
493.6 |
508.0 |
14.4 |
1.26 |
|
|
|
|
|
|
|
617.0 |
631.8 |
14.8 |
2.07 |
|
|
|
|
|
|
|
664.0 |
666.0 |
2.0 |
52.90 |
|
|
|
|
|
|
|
754.0 |
766.0 |
12.0 |
0.75 |
|
|
|
|
|
|
|
862.0 |
883.0 |
21.0 |
0.64 |
DLM-21-292 |
16060 |
588322 |
5541854 |
1008.0 |
180 |
-57 |
311.0 |
329.0 |
18.0 |
0.78 |
West Pit |
|
|
|
|
|
|
|
715.0 |
732.0 |
17.0 |
0.80 |
|
|
|
|
|
|
|
772.0 |
813.0 |
41.0 |
0.62 |
|
|
|
|
|
|
|
830.0 |
849.0 |
19.0 |
0.99 |
|
|
|
|
|
|
|
871.0 |
890.0 |
19.0 |
0.83 |
DLM-21-293A |
16100 |
588362 |
5541881 |
1176.0 |
180 |
-58 |
753.0 |
804.0 |
51.0 |
0.88 |
West Pit |
|
|
|
|
|
|
|
827.0 |
849.0 |
22.0 |
0.80 |
|
|
|
|
|
|
|
883.0 |
895.0 |
12.0 |
0.75 |
DLM-21-294A |
16020 |
588283 |
5541815 |
1164.0 |
177 |
-58 |
241.0 |
252.0 |
11.0 |
1.04 |
West Pit |
|
|
|
|
|
|
|
580.9 |
582.9 |
2.0 |
10.41 |
|
|
|
|
|
|
|
658.0 |
673.0 |
15.0 |
0.89 |
|
|
|
|
|
|
|
686.0 |
699.0 |
13.0 |
0.87 |
|
|
|
|
|
|
|
762.0 |
799.0 |
37.0 |
0.90 |
INCL. |
|
|
|
|
|
|
762.0 |
765.0 |
3.0 |
4.13 |
DLM-21-295 |
17220 |
589494 |
5541253 |
978.0 |
178 |
-72 |
184.0 |
237.0 |
53.0 |
1.30 |
Saddle |
INCL. |
|
|
|
|
|
|
221.9 |
224.0 |
2.1 |
12.84 |
|
|
|
|
|
|
|
248.7 |
276.0 |
27.3 |
0.82 |
|
|
|
|
|
|
|
355.0 |
377.0 |
22.0 |
0.63 |
|
|
|
|
|
|
|
448.0 |
473.3 |
25.3 |
20.10 |
INCL. |
|
|
|
|
|
|
448.0 |
454.0 |
6.0 |
67.02 |
INCL. |
|
|
|
|
|
|
467.0 |
473.3 |
6.3 |
13.82 |
|
|
|
|
|
|
|
610.3 |
646.0 |
35.7 |
1.62 |
|
|
|
|
|
|
|
699.0 |
786.0 |
87.0 |
1.33 |
INCL. |
|
|
|
|
|
|
709.0 |
711.0 |
2.0 |
18.13 |
DLM-21-296 |
16940 |
589208 |
5541566 |
1104.0 |
180 |
|
25.0 |
27.0 |
2.0 |
19.7 |
Saddle |
|
|
|
|
|
|
|
394.1 |
427.0 |
32.9 |
1.08 |
|
|
|
|
|
|
|
475.0 |
486.0 |
11.0 |
1.07 |
|
|
|
|
|
|
|
585.0 |
619.0 |
34.0 |
3.92 |
INCL. |
|
|
|
|
|
|
604.3 |
606.3 |
2.0 |
54.13 |
|
|
|
|
|
|
|
662.3 |
673.0 |
10.7 |
0.89 |
|
|
|
|
|
|
|
846.0 |
857.0 |
11.0 |
0.82 |
|
|
|
|
|
|
|
882.0 |
914.0 |
32.0 |
1.58 |
|
|
|
|
|
|
|
965.0 |
1001.0 |
36.0 |
2.85 |
INCL. |
|
|
|
|
|
|
974.9 |
977.0 |
2.1 |
18.71 |
DLM-21-300 |
16020 |
588282 |
5541844 |
1176.0 |
177 |
-58 |
93.0 |
125.0 |
32.0 |
4.77 |
West Pit |
INCL. |
|
|
|
|
|
|
100.0 |
103.0 |
3.0 |
44.46 |
|
|
|
|
|
|
|
251.0 |
253.0 |
2.0 |
17.17 |
|
|
|
|
|
|
|
405.8 |
408.0 |
2.2 |
17.74 |
|
|
|
|
|
|
|
708.0 |
726.0 |
18.0 |
0.88 |
|
|
|
|
|
|
|
770.0 |
788.6 |
18.6 |
1.07 |
|
|
|
|
|
|
|
834.0 |
859.0 |
25.0 |
0.78 |
DLM-21-301A |
16980 |
589246 |
5541635 |
777.0 |
181 |
-58 |
429.0 |
443.5 |
14.5 |
0.76 |
West Pit |
|
|
|
|
|
|
|
470.0 |
506.1 |
36.1 |
1.08 |
|
|
|
|
|
|
|
575.0 |
587.0 |
12.0 |
0.71 |
|
|
|
|
|
|
|
642.0 |
646.0 |
4.0 |
4.06 |
|
|
|
|
|
|
|
657.0 |
710.0 |
53.0 |
0.99 |
|
|
|
|
|
|
|
732.0 |
771.0 |
39.0 |
0.86 |
Notes:
1. Assays are reported
uncut. 2.
Assay Intervals are reported as drill
thickness. 3.
nsv - no significant value. 4.
An additional 947 m drilled from 20 abandoned/restarted holes not
reported in table.
Figure
1. https://www.globenewswire.com/NewsRoom/AttachmentNg/920a863e-b5b6-427a-9679-1b19cd797953
Figure
2. https://www.globenewswire.com/NewsRoom/AttachmentNg/555e344c-be34-4040-b604-7e2f356b21a5
Figure
3. https://www.globenewswire.com/NewsRoom/AttachmentNg/4f2a7abb-84bc-49dc-9639-0b156d8b0d53
Kirkland Lake Gold (NYSE:KL)
Gráfica de Acción Histórica
De Dic 2024 a Ene 2025
Kirkland Lake Gold (NYSE:KL)
Gráfica de Acción Histórica
De Ene 2024 a Ene 2025