Piedmont Lithium Submits Permit Applications
09 Enero 2019 - 6:42PM
Piedmont Lithium Limited
(“Piedmont” or
“Company”) is pleased to announce that it has submitted a
Section 404 Standard Individual Permit application to the US Army
Corps of Engineers (USACE) for the Company’s Piedmont Lithium
Project located in the historic Carolina Tin-Spodumene Belt in
North Carolina, USA. The USACE is the lead agency that will
review the Company’s permit applications at the federal level.
The Company also concurrently submitted an
application for a Section 401 Individual Water Quality
Certification to the North Carolina Division of Water Resources
(NCDWR). The Section 404 and 401 permits are typical
requirements for the type of operation proposed by Piedmont
Lithium. HDR Engineering’s Charlotte Office acted as lead
consultant in the preparation of both applications.
These important applications were completed and
submitted in accordance with the Company’s previously announced
estimated permitting timeline (refer to updated Scoping Study
announced September 13, 2018), allowing Piedmont to maintain its
overall project development schedule.
A graphic accompanying this announcement is available
at
http://www.globenewswire.com/NewsRoom/AttachmentNg/6ec5e745-29af-42f5-b948-5a0c51e7e598
Piedmont expects to submit the balance of permit
applications required to commence mining operations to various
state and local agencies within the first half of 2019.
For further information, contact:
Keith D. Phillips
Anastasios (Taso)
Arima President & CEO
Executive Director T: +1 973 809 0505
T: +1 347 899
1522E: kphillips@piedmontlithium.com
E: tarima@piedmontlithium.com
Piedmont Lithium Ltd (NASDAQ:PLLL)
Gráfica de Acción Histórica
De Dic 2024 a Ene 2025
Piedmont Lithium Ltd (NASDAQ:PLLL)
Gráfica de Acción Histórica
De Ene 2024 a Ene 2025
Real-Time news about Piedmont Lithium Limited (delisted) (NASDAQ): 0 recent articles
Más de Artículos de Noticias