Prime Mining Corp. (“
Prime” or the
“
Company”)
(TSX: PRYM) (OTCQX: PRMNF)
(Frankfurt: 04V3) announces that it has
granted a total of 991,626 incentive stock options (the
“
Options”), 455,846 restricted share units (the
“
RSUs”) and 661,202 deferred share units (the
“
DSUs”) in accordance with the long-term incentive
plan (the “Plan”) adopted by the Company.
The Options were granted to Management of the
Company and are exercisable at the price of $1.83 per share. The
Options will vest and become exercisable over a three year period,
with one-third vesting on the first year anniversary of the grant,
one-third on the second year anniversary, and one-third on the
third year anniversary.
The RSUs were granted to the Management of the
Company with each RSU equivalent to one Common Share or, at the
Corporation's option, a cash payment equal to the Fair Market Value
(as defined in the Plan) of such Common Share (with the additional
option of receiving any combination of cash and Common Shares). The
RSUs will vest over a three year period, with one-third vesting on
the first year anniversary of the grant, one-third on the second
year anniversary, and one-third on the third year anniversary.
Settlement will occur at the end of the third year.
The DSUs were granted to the Board of Directors
and will vest after twelve months, or upon the adoption of a
revised long-term incentive plan which permits earlier vesting.
Settlement will occur when a director resigns from or ceases to be
a member of the Board, or in connection with a change of control,
and is payable in either cash or commons shares at the discretion
of the board of directors on the settlement date.
About the Los Reyes Gold and Silver
Project
Los Reyes is a rapidly evolving high-grade, low
sulphidation epithermal gold-silver project located in Sinaloa
State, Mexico. Since acquiring Los Reyes in 2019, Prime has spent
approximately CAD$48 million on direct exploration activities and
has completed over 168,000 m of drilling. On May 2, 2023, Prime
announced an updated multi-million-ounce high-grade open pit
constrained resource (see below, and refer to the May 2, 2023 press
release for more details).
May 2, 2023 Resource
Statement
Drilling is ongoing and suggests that the three
known main deposit areas (Guadalupe, Central and Z-T) are larger
than previously reported. Potential also exists for new discoveries
where mineralized trends have been identified outside of the
currently defined resource areas.
Historic operating results indicate that an
estimated 1 million ounces of gold and 60 million ounces of silver
were recovered from five separate operations at Los Reyes between
1770 and 1990. Prior to Prime’s acquisition, recent operators of
Los Reyes had spent approximately US$20 million on exploration,
engineering, and prefeasibility studies.
Qualified PersonScott Smith,
P.Geo., Executive Vice President of Exploration, is a qualified
person for the purposes of National Instrument 43-101 and has
reviewed and approved the technical content in this news
release.
About Prime Mining
Prime is managed by an ideal mix of successful
mining executives, strong capital markets personnel and experienced
local operators all focused on unlocking the full potential of the
Los Reyes Project. The Company has a well-planned capital structure
with a strong management team and insider ownership. Prime is
targeting a material resource expansion at Los Reyes through a
combination of new generative area discoveries and growth, while
also building on technical de-risking activities to support
eventual project development.
ON BEHALF OF THE BOARD OF DIRECTORS
Daniel KunzChief Executive
Officer
For further information, please contact:
Daniel KunzChief Executive
Officer and DirectorTelephone: +1 (208) 926-6379 officeemail:
daniel@primeminingcorp.ca
Scott HicksExecutive Vice
President and DirectorTelephone: +1 (604) 428-6128 officeemail:
scott.hicks@primeminingcorp.ca
Prime Mining Corp.710 – 1030 West Georgia
St.Vancouver, BC V6E 2Y3 Canada+1(604)
428-6128info@primeminingcorp.ca
Cautionary Notes to U.S. Investors
Concerning Resource EstimatesThis news release has been
prepared in accordance with the requirements of the securities laws
in effect in Canada, which differ from the requirements of the U.S.
securities laws. In particular, and without limiting the generality
of the foregoing, the terms “mineral reserve”, “proven mineral
reserve”, “probable mineral reserve”, “inferred mineral resources,”
“indicated mineral resources,” “measured mineral resources” and
“mineral resources” used or referenced in this presentation are
Canadian mineral disclosure terms as defined in accordance with
National Instrument 43-101 – Standards of Disclosure for Mineral
Projects (“NI 43-101”) under the guidelines set out in the 2014
Canadian Institute of Mining, Metallurgy and Petroleum Standards
for Mineral Resources and Mineral Reserves, Definitions and
Guidelines, May 2014 (the “CIM Standards”). The CIM Standards
differ from the mineral property disclosure requirements of the
U.S. Securities and Exchange Commission (the “SEC”) in Regulation
S-K Subpart 1300 (the “SEC Modernization Rules”) under the U.S.
Securities Act of 1933, as amended (the “Securities Act”). As a
foreign private issuer that is eligible to file reports with the
SEC pursuant to the multijurisdictional disclosure system, the
Company is not required to provide disclosure on its mineral
properties under the SEC Modernization Rules and will continue to
provide disclosure under NI 43-101 and the CIM Standards.
Accordingly, the Company’s disclosure of mineralization and other
technical information may differ significantly from the information
that would be disclosed had the Company prepared the information
under the standards adopted under the SEC Modernization Rules.
Forward Looking Information
This news release contains certain
“forward-looking information” and “forward-looking statements”
within the meaning of Canadian securities legislation as may be
amended from time to time, including, without limitation,
statements regarding the perceived merit of the Company’s
properties, including additional exploration potential of Los
Reyes, potential quantity and/or grade of minerals, the potential
size of the mineralized zone, metallurgical recoveries, and the
Company’s exploration and development plans in Mexico.
Forward-looking statements are statements that are not historical
facts which address events, results, outcomes, or developments that
the Company expects to occur. Forward-looking statements are based
on the beliefs, estimates and opinions of the Company’s management
on the date the statements are made, and they involve several risks
and uncertainties. Certain material assumptions regarding such
forward-looking statements were made, including without limitation,
assumptions regarding the price of gold, silver and copper; the
accuracy of mineral resource estimations; that there will be no
material adverse change affecting the Company or its properties;
that all required approvals will be obtained, including concession
renewals and permitting; that political and legal developments will
be consistent with current expectations; that currency and exchange
rates will be consistent with current levels; and that there will
be no significant disruptions affecting the Company or its
properties. Consequently, there can be no assurances that such
statements will prove to be accurate and actual results and future
events could differ materially from those anticipated in such
statements. Forward-looking statements involve significant known
and unknown risks and uncertainties, which could cause actual
results to differ materially from those anticipated. These risks
include, but are not limited to: risks related to uncertainties
inherent in the preparation of mineral resource estimates,
including but not limited to changes to the cost assumptions,
variations in quantity of mineralized material, grade or recovery
rates, changes to geotechnical or hydrogeological considerations,
failure of plant, equipment or processes, changes to availability
of power or the power rates, ability to maintain social license,
changes to interest or tax rates, changes in project parameters,
delays and costs inherent to consulting and accommodating rights of
local communities, environmental risks, title risks, including
concession renewal, commodity price and exchange rate fluctuations,
risks relating to COVID-19, delays in or failure to receive access
agreements or amended permits, risks inherent in the estimation of
mineral resources; and risks associated with executing the
Company’s objectives and strategies, including costs and expenses,
as well as those risk factors discussed in the Company's most
recently filed management's discussion and analysis, as well as its
annual information form dated August 21, 2023, available on
www.sedarplus.ca. Except as required by the securities disclosure
laws and regulations applicable to the Company, the Company
undertakes no obligation to update these forward-looking statements
if management’s beliefs, estimates or opinions, or other factors,
should change.
A photo accompanying this announcement is
available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/a733d00b-9b58-4297-a63c-246d1da2a1fb
Prime Mining (TSX:PRYM)
Gráfica de Acción Histórica
De Nov 2024 a Dic 2024
Prime Mining (TSX:PRYM)
Gráfica de Acción Histórica
De Dic 2023 a Dic 2024