Red Pine Exploration Inc. (
TSXV: RPX,
OTCQB: RDEXF) (“Red Pine” or the “Company”) continues to
report new assay results from its ongoing exploration program.
These new results expand the exploration potential at depth in the
Jubilee Shear and continue to expand the footprint of gold
mineralization within gaps/hole of the existing Surluga resource.
-
Intersection of significant mineralization in the Jubilee Shear
outside the footprint of the existing resource
-
3.80 g/t gold over 36.94 metres including 24.04 g/t gold over 1.71
metres and 46.9 g/t gold over 1.04 metres in SD-23-456
-
Extension of mineralization 370 metres down-dip of the existing
resource and 400 metres north of the Surluga South discovery in the
Jubilee Shear in SD-23-448
- 5.33 g/t gold over 2.09 m in
SD-23-448 approximately 80 metres north from the intersection 5.61
g/t gold over 7.85 m including 21.6 g/t gold over 1.35 m in
SD-23-455 (see press release of November 15, 2023)
- Support the presence of a zone of
significant gold mineralization at depth north of the Surluga South
discovery.
-
Continue to expand the footprint of mineralization in the Minto B
and Minto C Shear system above the Jubilee Shear (Figures 1 and 2)
-
3.91 g/t gold over 3.90 m including 9.13 g/t gold over 1.21 metres
in the Minto C Shear system in SD-23-452
-
1.27 g/t gold over 21.96 metres in a zone of IRGS mineralization
deformed in the Minto B Shear in the foot wall of the Surluga
resource.
Quentin Yarie, President and CEO of Red Pine
Exploration commented:
“The intersection of further continuous
mineralization is a reminder of our continued positive results from
our ongoing exploration program. As we expand our focus in the
Jubilee Shear we remain on track for our revised resource in Q3 of
2024.”
Table 1– Highlights from drilling in the Wawa Gold
Corridor (Figure 1)
Hole |
From (m) |
To |
Length (m)* |
Visible Gold |
Gold (g/t) |
Zone |
|
|
(m) |
|
|
|
|
SD-23-448 |
532.9 |
534.2 |
1.30 |
|
1.75 |
|
551.39 |
552.61 |
1.22 |
|
0.78 |
|
631.44 |
632.89 |
1.45 |
|
0.68 |
Jubilee Shear |
649.49 |
651.58 |
2.09 |
|
5.33 |
SD-23-452 |
100.01 |
103.91 |
3.90 |
|
3.91 |
Minto C Shear |
Including |
102.7 |
103.91 |
1.21 |
|
9.13 |
212.48 |
213.57 |
1.19 |
|
4.41 |
Minto B/Minto C Shear |
289.6 |
294.21 |
4.61 |
|
0.90 |
Jubilee Shear |
352.58 |
357.63 |
5.05 |
|
0.91 |
439.67 |
441 |
1.33 |
|
6.34 |
Lower Jubilee Shear |
SD-23-454 |
188.79 |
190.76 |
1.97 |
|
0.82 |
Minto B/Minto C Shear |
366.1 |
375.08 |
8.98 |
|
0.43 |
Jubilee Shear |
386.11 |
387.11 |
1.00 |
|
2.03 |
SD-23-456 |
42.00 |
50.77 |
8.77 |
|
1.10 |
Minto B Shear |
Including |
49.53 |
50.77 |
1.24 |
|
6.03 |
242.7 |
279.64 |
36.94 |
VG |
3.80 |
Jubilee Shear |
Including |
249.12 |
250.03 |
0.91 |
VG |
5.21 |
251.85 |
253.56 |
1.71 |
|
24.04 |
256.29 |
257.45 |
1.16 |
|
15.00 |
278.6 |
279.64 |
1.04 |
|
46.9 |
SD-23-458 |
155.95 |
164.52 |
8.57 |
|
0.71 |
Minto B Shear |
Including |
160.15 |
161.2 |
1.05 |
|
3.00 |
267.51 |
268.6 |
1.09 |
|
2.09 |
Jubilee Shear |
312.72 |
313.96 |
1.24 |
|
1.34 |
SD-23-460 |
230.26 |
239.3 |
9.04 |
|
1.20 |
Jubilee Shear |
Including |
237.16 |
239.3 |
2.14 |
|
3.38 |
338.3 |
339.49 |
1.19 |
|
1.68 |
SD-23-461 |
160.29 |
161.45 |
1.16 |
|
1.49 |
Minto B Shear |
188.79 |
194.28 |
8.22 |
|
0.41 |
279.73 |
282.05 |
2.32 |
|
0.71 |
Jubilee Shear |
297.04 |
303.99 |
6.95 |
|
2.07 |
Including |
301.08 |
303.99 |
2.91 |
|
3.73 |
SD-23-462 |
9.93 |
11.32 |
1.39 |
|
1.34 |
|
214.54 |
236.5 |
21.96 |
|
1.27 |
HW IRGS / Minto B Shear |
260.52 |
263.5 |
2.98 |
|
0.43 |
SD-23-463 |
60.93 |
67.18 |
6.25 |
|
0.70 |
HW IRGS |
Including |
63.48 |
64.75 |
1.27 |
|
2.21 |
212.75 |
222.78 |
10.03 |
|
0.49 |
Minto B Shear |
251.32 |
271.72 |
20.40 |
|
1.09 |
294.00 |
297.68 |
3.68 |
|
0.81 |
SD-23-466 |
148.06 |
151.00 |
2.94 |
|
0.40 |
Minto B Shear |
169.68 |
174.94 |
5.26 |
|
0.39 |
186.04 |
198.15 |
12.11 |
|
0.65 |
SD-23-469 |
187.66 |
195.47 |
7.81 |
|
0.43 |
Minto B Shear |
Assay results presented over core length. True width for the
intersections varies between 50 to 95% depending on the intersected
geological structure.
Update on Red Pine ongoing
Exploration
Red Pine continues its progress a new/revised
resource for the Wawa Gold Project. Two drills are currently active
on-site producing an average of 3750 metres per month. Drilling is
targeted to the hanging wall of the Jubilee Shear over the
footprint of the 2019 resource. Additionally, holes/gaps in the
previous resource resulting from lack of drilling in the high-grade
core are being targeted. The potential of discovering significant
mineralization in the gaps of the 2019 resource envelope have been
proven not only with the results presented within this press
release but with additional intersections of:
- 9.57 g/t gold
over 10.95 m including 83.71 g/t gold over 1.00 m in SD-23-457
(press release of November 15, 2023)
- 8.01 g/t Au over
32.95 m including 171.0 g/t gold over 1.19 m in SD-23-451 (press
release of October 24, 2023)
- 10.92 g/t gold
over 28.05 m that includes 209.1 g/t gold over 1.00 m in SD-23-442
(press release of September 14, 2023)
Drilling will still continue at the Wawa Gold
Property through the summer and fall of 2024. Red Pine has a steady
pipeline of samples from the exploration program that are going for
analyses with currently 5711 samples with pending assays.
Quality Assurance/Quality Control ("QA/QC")
Measures
Drill core samples were transported in security
sealed bags for analyses to Actlabs in Ancaster, Ontario.
Individual samples were labelled, placed in plastic sample bags and
sealed. Groups of samples were then placed into durable rice bags
and shipped. The residual coarse reject portions of the samples
remain in storage if further work or verification is needed.
Red Pine has implemented a quality-control
program to comply with best practices in the sampling and analysis
of drill core. As part of its QA/QC program, Red Pine inserts
external gold standards (low to high grade) and blanks every 20
samples in addition to random standards, blanks, and
duplicates.
Qualified Person
Quentin Yarie, P.Geo. and Chief Executive
Officer of Red Pine and the Qualified Person, as defined by
National Instrument 43-101, has reviewed, and approved the news
release’s technical information.
About Red Pine Exploration
Inc.
Red Pine Exploration Inc. is a gold exploration
company headquartered in Toronto, Ontario, Canada. The Company's
shares trade on the TSX Venture Exchange under the symbol "RPX" and
on the OTCQB Markets under the symbol “RDEXF”.
The Wawa Gold Project is in the Michipicoten
Greenstone Belt of Ontario, a region that has seen major investment
by several producers in the last five years. Its land package hosts
numerous historic gold mines and is over 6,900 hectares in size.
Led by Quentin Yarie, CEO, who has over 25 years of experience in
mineral exploration, Red Pine is strengthening its position as a
major mineral exploration and development player in the
Michipicoten region.
For more information about the Company, visit
www.redpineexp.com
Or contact: Quentin Yarie, President and CEO,
(416) 364-7024, qyarie@redpineexp.com
Or
Carrie Howes, Director Corporate Communications, (416) 644-7375,
chowes@redpineexp.com
1 National Instrument 43-101 Technical Report
for the Wawa Gold Project, Brian Thomas P.Geo. Golder Associates
Ltd, report effective August 18, 2021.
Neither TSX Venture Exchange nor its Regulation
Services Provider (as that term is defined in policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release.
Cautionary Note Regarding Forward-Looking
Information
This news release contains statements which constitute
“forward-looking information” within the meaning of applicable
securities laws, including statements regarding the plans,
intentions, beliefs and current expectations of the Company with
respect to future business activities and operating
performance.
Forward-looking information is often identified by the words
“may”, “would”, “could”, “should”, “will”, “intend”, “plan”,
“anticipate”, “believe”, “estimate”, “expect” or similar
expressions. Forward-looking information contained in this news
release includes but may not be limited to:” the potential for a
hybrid pit and underground project”. Investors are cautioned that
forward-looking information is not based on historical facts but
instead reflect management’s expectations, estimates or projections
concerning future results or events based on the opinions,
assumptions and estimates of management considered reasonable at
the date the statements are made. Such opinions, assumptions and
estimates are inherently subject to a variety of risks and
uncertainties that could cause actual events or results to differ
materially from those projected and undue reliance should not be
placed on such information, as unknown or unpredictable factors
could have material adverse effects on future results, performance
or achievements. Among the key factors that could cause actual
results to differ materially from those projected in the
forward-looking information are the following: the Company's
expectations in connection with the projects and exploration
programs being met, the impact of general business and economic
conditions, global liquidity and credit availability on the timing
of cash flows and the values of assets and liabilities based on
projected future conditions, fluctuating gold prices, currency
exchange rates (such as the Canadian dollar versus the United
States Dollar), variations in ore grade or recovery rates, changes
in accounting policies, changes in the Company's mineral reserves
and resources, changes in project parameters as plans continue to
be refined, changes in project development, construction,
production and commissioning time frames, the possibility of
project cost overruns or unanticipated costs and expenses, higher
prices for fuel, power, labour and other consumables contributing
to higher costs and general risks of the mining industry, failure
of plant, equipment or processes to operate as anticipated,
unexpected changes in mine life, seasonality and weather, costs and
timing of the development of new deposits, success of exploration
activities, permitting time lines, government regulation of mining
operations, environmental risks, unanticipated reclamation
expenses, title disputes or claims, and limitations on
insurance.
This information is qualified in its entirety by cautionary
statements and risk factor disclosure contained in filings made by
the Company, including the Company’s annual information form,
financial statements and related MD&A for the year ended July
31, 2022, and the interim financial reports and related MD&A
for the period ended April 30, 2023, filed with the securities’
regulatory authorities in certain provinces of Canada and available
at www.sedar.com.
Should one or more of these risks or uncertainties materialize,
or should assumptions underlying the forward-looking information
prove incorrect, actual results may vary materially from those
described herein as intended, planned, anticipated, believed,
estimated or expected. Although the Company has attempted to
identify important risks, uncertainties and factors which could
cause actual results to differ materially, there may be others that
cause results not to be as anticipated, estimated or intended. The
Company does not intend, and does not assume any obligation, to
update this forward-looking information except as otherwise
required by applicable law.
Figure 1 - Plan Map of the Drilling Results
Figure 2 - Minto B Shear Zone in the Hanging Wall of the Surluga
Deposit
Photos accompanying this announcement are available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/306d9364-01a9-46b8-8b69-725c10bdd688
https://www.globenewswire.com/NewsRoom/AttachmentNg/56edc5fa-f1f7-47aa-97e1-2d45799a9e27
Red Pine Exploration (TSXV:RPX)
Gráfica de Acción Histórica
De Nov 2024 a Dic 2024
Red Pine Exploration (TSXV:RPX)
Gráfica de Acción Histórica
De Dic 2023 a Dic 2024